• 제목/요약/키워드: design-build system

검색결과 930건 처리시간 0.035초

설계.시공일괄입찰공사 및 대안입찰공사의 생애주기비용 분석 및 평가체계 개선방향 (Improvement Directions for Life Cycle Cost Analysis and Evaluation in the Design-Build and Alternative Bidding Projects)

  • 강태경;이유섭
    • 한국건축시공학회지
    • /
    • 제8권1호
    • /
    • pp.97-102
    • /
    • 2008
  • The report of the Korean Board of Audit and Inspection(BAI) on May 2007 indicates the problems of Life Cycle Cost (LCC) analysis and evaluation in the Design-Build(Turn-Key) and alternative bidding system. The point which the report indicates is that the cost estimation system for LCC analysis has nothing in common each other and there's no consistency among the repair cycle and ratio per facilities parts. For solving these problems, BAI demands the establishment of the guidelines for LCC analysis and evaluation from the competent authority Korean Ministry of Construction And Transportation(MOCT). The objective of this study is to develop the improvement directions for LCC analysis and evaluation which are suitable to the public construction projects especially for the Design-Build and alternative bidding system in Korea. For this study, the LCC related raws and regulations, LCC analysis guidelines of public cooperations, actual condition of LCC analysis and evaluation which include, the elements of LCC, the estimation rules of the initial cost and the maintenance cost, the analysis standards of time value of money, etc. are investigated to provide the improvement directions for LCC analysis and evaluation.

Modification of Public-Private Partnership in Japan

  • Kaneta, Takashi
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.153-158
    • /
    • 2017
  • Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.

  • PDF

시스템 다이나믹스를 이용한 자동차 개발 단계에서 Design-Build-Test Cycle의 중복에 대한 연구 (Overlapping Design-Build-Test Cycles in Vehicle Development Process : System Dynamics Approach)

  • 이상돈;임익성
    • 산업경영시스템학회지
    • /
    • 제29권3호
    • /
    • pp.25-32
    • /
    • 2006
  • 자동차 개발 단계는, 본질적으로, 수차례의 개발 단계를 거치면서 설계 그룹들 간의 정보 전달과 교환이 여러 차례 반복적으로 발생하게 된다. 이러한 복잡한 상호 정보 교환 과정을 정확하게 이해하여 업무가 수행되지 못하면 불필요한 재작업을 야기시킬 수 있으며, 이는 비용 낭비 및 계획에 차질이 발생할 수 있다. 이 연구에서는 시스템 다이나믹 모델을 개발하여 빈번한 design-built-test 싸이클이 자동차 개발 단계에 미치는 영향 및 이점들을 고찰하였다.

공학설계 교과목에서 교수-학습 방법에 따른 학습성과 분석 사례 (Case Analysis of Program Outcomes Depending on Teaching Methods in Engineering Design Course)

  • 김인숙;강태욱
    • 공학교육연구
    • /
    • 제19권2호
    • /
    • pp.8-13
    • /
    • 2016
  • This paper is concerned with the development case of CEA(Course-Embedded Assessment) design tool for engineering education accreditation operations department for CEA system implemented. Each university or programs are already devoting efforts to build research and CEA system for CEA applied to. In order to effectively apply the CEA studies for each program it is required and particularly, the preferred way to build an operating system is considered a difficult situation of the course unit. Therefore, this case study and to propose a method and procedures required to assessment the design basis for curriculum and program assessment unit in terms of the applicability of CEA, proposes a virtual application results. The information proposed in this case study is determined that could be used in the design for the outcomes and assessment of a variety of programs as one of the steps to build the CEA systems.

병원건축 일괄입찰방식의 적합성과 평가기준 개선방안에 관한 연구 - 건축계획의 설계변경사례를 중심으로 - (A Study on the adequacy of Hospital Architecture Deign-Build and Improvement of Assessment Criteria - Focus on the case of Architectural Planning Design Change -)

  • 홍승민;양내원
    • 한국실내디자인학회논문집
    • /
    • 제21권2호
    • /
    • pp.215-222
    • /
    • 2012
  • Design-build is expanding gradually in large construction projects over 10billion won, and continue to work in health care facilities is increasing in this way. This constructional method in health care facilities, despite the many advantages, many problems caused by design changes are being raised. Raises the question of design changes on the side of construction contract, such as approval systems have been studied in the field of construction. The purpose of this study design in aspects of architectural planning on changing the grasp of the issues outlined in the ITB and bid evaluation criteria through consideration of the basic plan for improvement guidelines and evaluation criteria is presented. In conclusion, Design build, according to the presence of existing users are more likely to lead to design changes. Thus, hospital architecture, depending on how it is considered that constructional methods. And evaluation items of ITB(Invitation To Bidder) for a large part of the change in the variables evaluated in the hospital building is not suitable for the design build. Instead, the overall shape of the building and department, unit type and size, vertical and horizontal parts of the circulation system in the shape of the building that does not change in structure and etc should be considered for evaluation.

  • PDF

공공부문 일괄입찰사업의 설계VE 파트너링 활용방안 (Application of Partnering to Design VE to Public Design-Build Projects)

  • 김해곤;엄익준;구교진;현창택
    • 한국건설관리학회논문집
    • /
    • 제7권1호
    • /
    • pp.110-118
    • /
    • 2006
  • 현행 일괄입찰방식은 분담이행방식의 공동도급형태로 운영되고 있어, 참여업체간의 의사소통 부족으로 설계기술과 시공기술의 접목이라는 일괄입찰방식 본래의 취지를 살리지 못하고 있다. 또한 입찰을 통해 확정된 총액금액으로 설계가 진행되므로 실시설계단계에서 VE활동을 통한 원가절감 노력이 거의 이루어지지 않고 있는 실정이다. 이에 본 연구에서는 현행 설계시공일괄방식의 특성을 파악하고 설계VE 적용사례를 분석하여, 설계VE 적용의 문제점이 무엇인지를 파악한 후, 일괄입찰사업 수행절차에서 설계VE 적용의 효과를 극대화할 수 있는 파트너링의 활용방법 및 그 적용시기를 제안한다.

자동차 프레스 금형의 스티로폼-패턴 가공을 위한 전용 CAM 시스템 개발 (Development of a Dedicated CAM System for Styrofoam-pattern Machining)

  • 박정환
    • 한국CDE학회논문집
    • /
    • 제3권4호
    • /
    • pp.223-235
    • /
    • 1998
  • A dedicated CAM(Computer-Aided Manufacturing) system has been developed, which generated tool-path to machine Styrofoam stamping die-patterns in Chrysler Corporation. A previous process to build die-patterns was to "stick build" the pattern, in which stock is cut & glued together, and then the NC machining of part-surface shape completes building a Styrofoam die-pattern. The current process utilizes the developed CAM system, and almost removes the manual work, consequently reduces the overall lead time. The paper presents the overall system structures, tool-path generation, and some features of Styrofoam pattern machining.

  • PDF

중소기업을 위한 최종 사용자 컴퓨팅 PDM 시스템 개발 (Developing an End-User Computing PDM System for Small and Medium Business)

  • 도남철
    • 대한산업공학회지
    • /
    • 제41권2호
    • /
    • pp.162-172
    • /
    • 2015
  • This paper proposes a Product Data Management (PDM) system architecture that supports end-user computing for small and medium businesses (SMBs) in Korea to build and maintain efficient and sustainable information systems for their product development. Its open database with relational tables enables existing common application programs such as Microsoft office suites to access product data in PDM systems. In addition, the interactive query processor provided by database management systems helps design engineers to build ad hoc queries in standard SQL database language to response different data requirements during their product development. The PDM architecture with the open database allows design engineers or technical staffs in SMBs to build and maintain their application programs for product development by themselves. To show the feasibility of the proposed architecture, this study implemented a prototype PDM system based on the architecture and database, and represents real-world product data with the implemented PDM system.

A PCM PERFORMANCE EVALUATION SYSTEM FOR DESIGN/BUILD PROJECTS

  • Wen-der Yu ;Yin-shung Hsin
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.397-402
    • /
    • 2005
  • Professional Construction Management (PCM) services have become more and more popular in Taiwan in the past decade. However, disputes between PCM consultant and the client on the performance of PCM services are also increasing. The evaluation of PCM performance is a tough task due to the lack of "physical product", such as the drawings finished by the architect. This paper is intended to propose a PCM performance evaluation system (PPES) based on Balanced Scorecard (BSC). A case study of PCM consultancy for a real world design/build project is conducted to demonstrate the applicability of the proposed BSC framework

  • PDF

전문가 시스템에 의한 I-BUIDS의 입력데이타 파일 작성 (INPUT DATA FILE GENERATION IN I-BUILDS BY AN EXTERT SYSTEM)

  • 최창근;김이두
    • 전산구조공학
    • /
    • 제1권1호
    • /
    • pp.95-102
    • /
    • 1988
  • I-BUILDS는 기존의 CAD 프로그램인 BUILDS와 지식베이스를 일관된 시스템으로 통합한 건물설계용 전문가 시스템이다. 본 시스템을 구축하기 위한 노력의 일환으로 본 논문에서는 추록에 의해 발생된 데이타들을 다양한 계산능력을 가지면서 특별한 업무도 수행할 수 있게 설계된 건물의 일괄구조설계 시스템이 BUILDS의 부시스템(BUILDS-A)에 이용되도록 입력파일화하기 위한 기본적인 개념을 기술한다.

  • PDF