• Title/Summary/Keyword: design flood

Search Result 649, Processing Time 0.027 seconds

A study on the feasibility analysis of the current flood season: a case study of the Yongdam Dam (현행 법정홍수기 타당성 검토 및 개선에 관한 연구: 용담댐 사례)

  • Lee, Jae Hwang;Kim, Gi Joo;Kim, Young-Oh
    • Journal of Korea Water Resources Association
    • /
    • v.57 no.5
    • /
    • pp.359-369
    • /
    • 2024
  • Korea prepares for potential floods by designating June 21st to September 20th as the flood season. However, many dams in Korea have suffered from extreme floods caused by different climate patterns, as in the case of the longest consecutive rain of 54 days in the 2020's flood season. In this context, various studies have tried to develop novel methodologies to reduce flood damage, but no study has ever dealt with the validity of the current statutory flood season thus far. This study first checked the validity of the current flood season through the observation data in the 21st century and proved that the current flood season does not consider the effects of increasing precipitation trends and the changing regional rainfall characteristics. In order to deal with these limitations, this study suggested seven new alternative flood seasons in the research area. The rigid reservoir operation method (ROM) was used for reservoir simulation, and the long short-term memory (LSTM) model was used to derive predicted inflow. Finally, all alternatives were evaluated based on whether if they exceeded the design discharge of the dam and the design flood of the river. As a result, the floods in the shifted period were reduced by 0.068% and 0.33% in terms of frequency and duration, and the magnitude also decreased by 24.6%, respectively. During this period, the second evaluation method also demonstrated that flood decreased from four to two occurrences. As the result of this study, the authors expect a formal reassessment of the flood season to take place, which will ultimately lead to the preemptive flood response to changing precipitation patterns.

Hydrological Stability Analysis of the Existing Soyanggang Multipurpose Dam

  • Ko, Seok-Ku;Shin, Yong-Lo
    • Korean Journal of Hydrosciences
    • /
    • v.7
    • /
    • pp.37-49
    • /
    • 1996
  • This study aims at suggesting an alternative to improve flood controling capacity according to the cument design criteria for the existing Soyanggang Multi-purpose Dam which was constructed 20 years ago as the largest dam in Korea. The peak inflow of the adopted probable maximum flood (PMF) at the time of construction was 13,500 $m^3$/s. However, the newly estimated peak inflow of the PMF is 18,000 $m^3$/s which is 1.34 times bigger than the original one. This is considered to be due to the accumulation of the reliable flood and storm event records after construction, and due to the increasing tendency of the local flood peaks according to the influence of world-wide weather change. The new estimation of the probable maximum precipitation (PMP) was based on the hydro-meteorological method suggested by the guideline of the World Meteorological Organization (WMO). The unit hydrograph which was applied for the estimation of PMF was derived through linear programming algorithm by minimizing the sum of absolute deviations of the calculated and recorded flood hydrographs. In order to adopt the newly estimated PMF as a design flood, following four alternatives were compared : (1) allocation of more flood control space by lowering the normal high water level, (2) construction of a new spillway in addition to the existing spillway, (3) construction of a new dam which has relevant flood control storage at the upstream of the Soyanggang dam, (4) raising the existing dam crest. The preliminary evaluation of these alternatives resulted in that the second alternative is most economic and feasible. So as to stably cope with the newly estimated PMF by meeting all the current functions of the multipurpose dam, a detailed study of an additional spillway tunnel has to be followed.

  • PDF

Comparative Study on Calculation Method for Design Flood Discharge of Dam (댐 설계홍수량 산정방법에 관한 비교연구)

  • Lee, Jai-Hong;Lee, Jong-Kyu;Kim, Tae-Woong;Kang, Ji-Ye
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.12
    • /
    • pp.941-954
    • /
    • 2011
  • In this study, past method and recent method for flood discharge with domestic multi-purpose dams in Korea were compared and analyzed with respect to the scale of watershed. Rainfall depth, temporal pattern, rainfall excess, rainfall-runoff model, parameter estimation and base flow were selected as the principal factors affecting flood discharge and effects on flood discharge were analyzed quantitatively by using sensitivity analysis. The results showed that the flood discharges calculated by past and recent method increased and decreased with a wide range of discharge with respect to the scale of watershed. The reason for decrease of flood discharge is the exchange of temporal pattern of rainfall and the principal reasons for increase of flood discharge are the increase of rainfall depth by unusual weather phenomena and the difference of estimation method for parameters of unit hydrograph.

Revisiting design flood estimation of Nam River Dam basin considering climate change (기후변화를 고려한 남강댐 유역의 홍수량 재산정)

  • Lee, Hyunseung;Lee, Taesam;Park, Taewoong;Son, Chanyoung
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.8
    • /
    • pp.719-729
    • /
    • 2016
  • Extreme events of rainfall has increased mainly from climate change, resulting in more severe floods intensified by land use development. Appropriate estimation of design floods gets more attention to ensuring the safety of life and property in flood-prone areas for hydraulic structures such as dams and levees. In the current study, we reestimated the design flood of the Nam River Dam to adopt the influence of climatic change of hydrometeorological variables including recent datasets of extreme rainfall events. The climate change scenarios of extreme rainfall events in hourly scale that has been downscaled was used in analyzing the annual maximum rainfall for the weather stations in the Nam River Dam basin. The estimates of 200-year and 10,000-year return periods were calculated to provide a design flood and a probable maximum flood case for the Nam River Dam. The results present that the new estimate employing the RCP4.5 and RCP8.5 downscaled data is much higher than the original design flood estimated at the dam construction stage using a 200-year return period. We can conclude that the current dam area might be highly vulnerable and need an enhancement of the dam safety regarding the reduction of damage in Sachen bay from the outflow of Nam River Dam.

Assessment of Future Flood According to Climate Change, Rainfall Distribution and CN (기후변화와 강우분포 및 CN에 따른 미래 홍수량 평가)

  • Kwak, Jihye;Kim, Jihye;Jun, Sang Min;Hwang, Soonho;Lee, Sunghack;Lee, Jae Nam;Kang, Moon Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.62 no.6
    • /
    • pp.85-95
    • /
    • 2020
  • According to the standard guidelines of design flood (MLTM, 2012; MOE, 2019), the design flood is calculated based on past precipitation. However, due to climate change, the frequency of extreme rainfall events is increasing. Therefore, it is necessary to analyze future floods' volume by using climate change scenarios. Meanwhile, the standard guideline was revised by MOE (Ministry of Environment) recently. MOE proposed modified Huff distribution and new CN (Curve Number) value of forest and paddy. The objective of this study was to analyze the change of flood volume by applying the modified Huff and newly proposed CN to the probabilistic precipitation based on SSP and RCP scenarios. The probabilistic rainfall under climate change was calculated through RCP 4.5/8.5 scenarios and SSP 245/585 scenarios. HEC-HMS (Hydrologic Engineering Center - Hydrologic Modeling System) was simulated for evaluating the flood volume. When RCP 4.5/8.5 scenario was changed to SSP 245/585 scenario, the average flood volume increased by 627 ㎥/s (15%) and 523 ㎥/s (13%), respectively. By the modified Huff distribution, the flood volume increased by 139 ㎥/s (3.76%) on a 200-yr frequency and 171 ㎥/s (4.05%) on a 500-yr frequency. The newly proposed CN made the future flood value increase by 9.5 ㎥/s (0.30%) on a 200-yr frequency and 8.5 ㎥/s (0.25%) on a 500-yr frequency. The selection of climate change scenario was the biggest factor that made the flood volume to transform. Also, the impact of change in Huff was larger than that of CN about 13-16 times.

Derivation of Flood Hazard Curves for SOC Facilities under Local Intensive Precipitation (LIP(극한강우) 조건하에서 중요 SOC 시설물에 대한 재해도 곡선 작성)

  • Kim, Beom Jin;Han, Kun Yeun*
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.1
    • /
    • pp.183-194
    • /
    • 2019
  • In recent years, the risk of external flooding of major national facilities has increased significantly since 2000 due to the increase in local heavy rainfall events. For important domestic national facilities, it is necessary to analyze the risk of external flooding as flooding in major sites due to heavy rain can cause functional paralysis in major facilities and ultimately lead to massive trouble events. In order to manage the safety of main facilities and its related facilities at a high level, it is necessary to analyze the degree of disaster such as flood depth, flood flow rate, flood time and flood intensity when extreme floods (LIP) are introduced. In addition, the degree of vulnerability of these related facilities should be assessed and risk assessments should be reassessed through linkage analysis that combines the degree of disaster and vulnerability. By calculating a new flood hazard curve for the flood depth and flood intensity in major national facilities under the heavy rainfall conditions through this study, it is expected to be a basis for the waterproof design of important SOC facilities, flood prevention function design, advancement of flood prevention measures and procedures and evaluation of flood mitigation functions.

Evaluation of Flood Severity Using Bivariate Gumbel Mixed Model (이변량 Gumbel 혼합모형을 이용한 홍수심도 평가)

  • Lee, Jeong-Ho;Chung, Gun-Hui;Kim, Tae-Woong
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.9
    • /
    • pp.725-736
    • /
    • 2009
  • A flood event can be defined by three characteristics; peak discharge, total flood volume, and flood duration, which are correlated each other. However, a conventional flood frequency analysis for the hydrological plan, design, and operation has focused on evaluating only the amount of peak discharge. The interpretation of this univariate flood frequency analysis has a limitation in describing the complex probability behavior of flood events. This study proposed a bivariate flood frequency analysis using a Gumbel mixed model for the flood evaluation. A time series of annual flood events was extracted from observations of inflow to the Soyang River Dam and the Daechung Dam, respectively. The joint probability distribution and return period were derived from the relationship between the amount of peak discharge and the total volume of flood runoff. The applicability of the Gumbel mixed model was tested by comparing the return periods acquired from the proposed bivariate analysis and the conventional univariate analysis.

Estimation of Design Flood by the Determination of Best Fitting Order for LH-Moments (LH-모멘트의 차수에 따른 설계홍수량 추정)

  • Maeng, Sung-Jin;Lee, Soon-Hyuk
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2002.10a
    • /
    • pp.233-236
    • /
    • 2002
  • This study was conducted to estimate the design flood by the determination of best fitting order for LH-moments of the annual maximum series at fifteen watersheds. Parameters of GEV distribution and flood flows of return period n years were derived by the methods of L, L1, L2, L3 and L4-moments. Frequency analysis of flood flow data generated by Monte Carlo simulation was performed by the methods of L, L1, L2, L3 and L4-moments using GEV distribution. Relative Root Mean Square Error (RRMSE), Relative Bias (RBIAS) and Relative Efficiency (RE) using methods of L, L1, L2, L3 and L4-moments for GEV distribution were computed and compared with those resulting from Monte Carlo simulation. At almost all of the watersheds, the more the order of LH-moments and the return periods increased, the more RE became, while the less RRMSE and RBIAS became. Consequently, design floods for the applied watersheds were derived by the methods of L3 and L4-moments among LH-moments in view of high confidence efficiency.

  • PDF

Development of Syntheic Unit Hydrograph for Estimation of design Flood (설계홍수량 산정을 위한 단위유량도의 합성방법 개발)

  • Lee, Hong-Rae;Lee, Jong-Guk;Seo, Byeong-Ha
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 1989.07a
    • /
    • pp.17-30
    • /
    • 1989
  • In this study, more exact runoff phenomina of the watersheds were comprehened and the relationships between geographical factors of the selected watershed and the unit hydrograph characteristic variables representing runoff processes, were also established. Moreover, the estimation of the adequate design flood was presented, which is needed for the design of the hydrologic structures in the ungauged watersheds. And owing to these results, it is considered to be possible to execute the effective flood control projects of the river and the efficient water resources management.

  • PDF