• 제목/요약/키워드: design flood

검색결과 651건 처리시간 0.024초

농업용 저수지 증고에 따른 홍수조절효과 분석 (Analysis of Flood Control Effects of Heightening of Agricultural Reservoir Dam)

  • 이관재;박기욱;정영훈;정인균;정광욱;전지홍;이지민;임경재
    • 한국농공학회논문집
    • /
    • 제55권4호
    • /
    • pp.83-93
    • /
    • 2013
  • Annual average precipitation of Korea is 1,277 mm and around 2/3 of annual precipitation and 74 % of available water resources occurred during monsoon period. In recent years, many agricultural reservoirs have been heightened to increase flood control capacity, reduce flooding damage at downstream areas, and provide sustainable environmental flow during drought period. Thus in this study, the flood control effects of heightening of reservoir banks were simulated with HEC-ResSim and HEC-RAS models. These modes were applied to Bonghak reservoir and it was found that flood control effects were 3~4.5 % with 7 -m heightening. Also, with proper operation (1 m lower of full water level) of reservoir right before the monsoon period, flooding at downstream could be prevented even with design storm of 80 -year recurrence interval. As shown in this study, heightening of agricultural reservoir provides positive effects in flood control and flood damage reduction.

수치모형 적용을 통한 나주 강변저류지 홍수위 저감효과 분석 (Analysis of Flood Level Mitigation due to the Naju Retention-Basin by Numerical Model Application)

  • 이동섭;김형준;조길제
    • 한국산학기술학회논문지
    • /
    • 제15권9호
    • /
    • pp.5801-5812
    • /
    • 2014
  • 강변저류지는 일정 규모 이상의 홍수를 하도로부터 분배하여 홍수량을 저감시킴으로써 홍수위험을 저감시키는 수공 구조물이다. 본 연구에서는 강변저류지에 의한 홍수저감효과를 분석하기 위하여 수치모의를 수행하였다. 기후변화에 의한 이상홍수 발생시, 홍수저감효과를 분석하기 위하여 계획빈도를 상회하는 수문조건에 대한 검토를 수행하여 강변저류지의 홍수조절능력을 분석하였다. 또한, 강변저류지가 설치된 하천은 복잡한 지형과 횡월류위어를 통하여 강변저류지로 분배되는 흐름이 동시에 발생하므로 복잡한 흐름현상을 구현하기 위하여 2차원 모형의 적용성을 검토하였다. 기존 강변저류지 홍수저감효과 분석시 주로 활용되는 1차원 모형과 2차원 모형의 결과를 비교 및 검토하였다. 본 연구결과 강변저류지에 의한 홍수저감효과를 모의하기 위해서는 지형 및 횡월류 흐름을 공간적으로 구현할 수 있는 2차원 모형을 활용하는 것이 합리적인 것으로 판단된다.

예보강우의 시간분포에 따른 청미천 유역의 홍수 확률 평가 (Assessment of Flood Probability Based on Temporal Distribution of Forecasted-Rainfall in Cheongmicheon Watershed)

  • 이현지;전상민;황순호;최순군;박지훈;강문성
    • 한국농공학회논문집
    • /
    • 제62권1호
    • /
    • pp.17-27
    • /
    • 2020
  • The objective of this study was to assess the flood probability based on temporal distribution of forecasted-rainfall in Cheongmicheon watershed. In this study, 6-hr rainfalls were disaggregated into hourly rainfall using the Multiplicative Random Cascade (MRC) model, which is a stochastic rainfall time disaggregation model and it was repeated 100 times to make 100 rainfalls for each storm event. The watershed runoff was estimated using the Clark unit hydrograph method with disaggregated rainfall and watershed characteristics. Using the peak discharges of the simulated hydrographs, the probability distribution was determined and parameters were estimated. Using the parameters, the probability density function is shown and the flood probability is calculated by comparing with the design flood of Cheongmicheon watershed. The flood probability results differed for various values of rainfall and rainfall duration. In addition, the flood probability calculated in this study was compared with the actual flood damage in Cheongmicheon watershed (R2 = 0.7). Further, this study results could be used for flood forecasting.

Multivariate design estimations under copulas constructions. Stage-1: Parametrical density constructions for defining flood marginals for the Kelantan River basin, Malaysia

  • Latif, Shahid;Mustafa, Firuza
    • Ocean Systems Engineering
    • /
    • 제9권3호
    • /
    • pp.287-328
    • /
    • 2019
  • Comprehensive understanding of the flood risk assessments via frequency analysis often demands multivariate designs under the different notations of return periods. Flood is a tri-variate random consequence, which often pointing the unreliability of univariate return period and demands for the joint dependency construction by accounting its multiple intercorrelated flood vectors i.e., flood peak, volume & durations. Selecting the most parsimonious probability functions for demonstrating univariate flood marginals distributions is often a mandatory pre-processing desire before the establishment of joint dependency. Especially under copulas methodology, which often allows the practitioner to model univariate marginals separately from their joint constructions. Parametric density approximations often hypothesized that the random samples must follow some specific or predefine probability density functions, which usually defines different estimates especially in the tail of distributions. Concentrations of the upper tail often seem interesting during flood modelling also, no evidence exhibited in favours of any fixed distributions, which often characterized through the trial and error procedure based on goodness-of-fit measures. On another side, model performance evaluations and selections of best-fitted distributions often demand precise investigations via comparing the relative sample reproducing capabilities otherwise, inconsistencies might reveal uncertainty. Also, the strength & weakness of different fitness statistics usually vary and having different extent during demonstrating gaps and dispensary among fitted distributions. In this literature, selections efforts of marginal distributions of flood variables are incorporated by employing an interactive set of parametric functions for event-based (or Block annual maxima) samples over the 50-years continuously-distributed streamflow characteristics for the Kelantan River basin at Gulliemard Bridge, Malaysia. Model fitness criteria are examined based on the degree of agreements between cumulative empirical and theoretical probabilities. Both the analytical as well as graphically visual inspections are undertaken to strengthen much decisive evidence in favour of best-fitted probability density.

치수안전도에 따른 토지이용의 편익 분석 (Land-use Enhancement Benefit According to Flood Safety)

  • 이진욱;김형수;심명필;최승안
    • 한국습지학회지
    • /
    • 제6권4호
    • /
    • pp.45-57
    • /
    • 2004
  • 본 연구에서는 우리나라의 치수경제성 분석에 있어 계량화되지 않은 토지이용고도화 편익 효과를 치수안전도와 더불어 분석하고자 하였다. 토지이용고도화는 치수사업시행으로 해당지역의 치수안전도 향상에 따른 토지가치의 상승을 말하는데, 특정지역의 토지가치를 가장 객관적으로 표현할 수 있는 공시지가를 근거로 분석을 수행하였다. 치수사업시행에 의한 편익의 효과와 하천 특성에 따른 지가변동률이 통계적으로 유의성이 있는지 분산분석을 통해 검증하였으며, 토지이용가치의 상승을 순연평균지가변동률로 나타내었다. 치수안전도는 홍수피해 잠재성과 홍수방어능력으로 구분하였는데 홍수피해 잠재성은 도시화율에 따라 구분하였고, 홍수방어능력은 홍수량의 빈도해석과 불확실성을 고려하여 조건부 비초과확률로 나타내었다. 본 연구에서는 소도시 지역을 대상으로 200년 빈도의 홍수사상에 대해 10년, 50년 설계빈도로 건설된 제방의 조건부 비초과확률을 산정하여 지가변동률의 추이를 비교 분석하였다. 분석 결과, 소도시 지역에서는 조건부 비초과확률이 10%정도 상승했을 때 순연평균지가변동률이 5배정도 상승함을 알 수 있었다.

  • PDF

홍수사상 요소의 상관성을 고려한 홍수사상의 평가 (Evaluation of Flood Events Considering Correlation between Flood Event Attributes)

  • 이정호;유지영;김태웅
    • 대한토목학회논문집
    • /
    • 제30권3B호
    • /
    • pp.257-267
    • /
    • 2010
  • 홍수사상은 크게 첨두홍수량, 홍수용적, 지속기간 등과 같은 서로 상관된 세 가지의 요소에 의해 특성화되어진다. 그러나 그동안 수공학적 계획이나 설계 등을 위한 홍수빈도 해석에서는 주로 첨두홍수량 한가지 요소에 초점을 맞추어 홍수빈도 해석을 수행해 왔다. 이러한 단변량 홍수빈도 해석은 서로 상관된 홍수사상 요소 사이의 복잡한 확률적 거동을 분석하는 데 있어 한계를 가지고 있다. 본 연구에서는 Gumbel 혼합모형, 이변량 감마분포, 이변량 핵밀도 함수 등 세 가지의 이변량 빈도해석 방법을 적용하여 이변량 빈도해석을 수행하고 그 결과를 단변량 빈도해석 방법의 결과와 비교 분석하였다. 소양강댐의 35개년 일 유입량 자료와 대청댐의 28개년 일 유입량 자료에 대해 각각의 홍수사상을 분리하고, 홍수사상 자료의 통계량과 매개변수, 최적 광역폭 등을 산정한 후 자료의 적합도 검정과 결합분포의 적합도 검정 등의 과정을 거쳐 첨두홍수량과 홍수용적의 조합을 고려하여 결합분포와 결합 재현기간 등을 추정하였다. 이처럼 세 가지 방법의 이변량 빈도해석을 통해 추정된 결과를 단변량 홍수빈도 해석의 결과와 비교 분석함으로써 각 방법의 상관성을 파악할 수 있었고, 이변량 홍수빈도 해석의 특성에 의해 도출된 결과를 토대로 이변량 홍수빈도 해석의 적용성에 대하여 검토하였다.

강우의 시간해상도와 자료기간에 따른 설계홍수량의 변동성 (Variation of design flood according to the temporal resolution and periods of rainfall)

  • 김민석;이정환;문영일
    • 한국수자원학회논문집
    • /
    • 제51권7호
    • /
    • pp.599-606
    • /
    • 2018
  • 대부분의 수문분석은 시 단위 강우를 기반으로 확률강우량과 강우시간분포를 산정하고, 확률강우량과 강우시간분포의 자료기간을 달리 적용하는 방법으로 강우-유출분석을 수행하고 있다. 본 연구에서는 자료형태(시 단위와 분 단위 강우자료)와 확률강우량과 강우시간분포의 다른 자료기간 적용에 따른 설계홍수량 변화를 정량화 하고자, 자료형태와 자료기간에 따라 지점빈도해석을 통한 확률강우량 산정과 Huff의 4분위 방법을 통한 강우시간분포를 산정하였다. 또한, 확률강우량과 설계강우 시간분포의 자료기간을 달리 적용한 강우-유출분석으로 설계홍수량 변동분석을 실시하였다. 분석결과, 자료형태에서는 분 단위 강우가 시 단위 강우보다 더욱 정확하고 효과적인 강우분석을 수행할 수 있는 것으로 나타났으며, 확률 강우량과 강우시간분포의 다른 자료기간을 적용하여 산정된 설계홍수량의 차 보다 자료형식에 따른 설계홍수량 결과가 보다 큰 차이를 보이는 것으로 나타났다. 이는 향후 분 단위 강우를 활용한 수문분석에 크게 기여할 것으로 판단된다.

배수통문이 설치된 제방의 설계수위파형결정에 관한 수치해석 (Numerical Analysis in Hydrograph Determination for Sluice Gate installed Levee)

  • 김진만;최봉혁;오은호;조원범
    • 한국지반신소재학회논문집
    • /
    • 제14권4호
    • /
    • pp.1-9
    • /
    • 2015
  • 하천제방 건전도 평가는 하천설계기준 해설(KWRA, 2009) 및 구조물기초 설계기준과 그 해설서(MLTM, 2014와 KGS, 2009) 등 관련 기준 및 기준 해설서에 따라 수위조건 별 기초지반 및 제체를 통한 파이핑 안전성과 제내지 및 제외지 비탈면의 활동안전성 평가를 통해 수행된다. 이때 수위파형은 하천제방 건전도 평가 시 가장 중요한 수위조건 입력자료이나, 국가기준에서 합리적인 결정방법을 제시하지 못하고 있는 실정이다. 본 논문에서는 합리적인 수위파형 결정방법 제안을 위하여 평수위 상승, 홍수위 지속, 수위강하, 홍수빈도 등 수위파형 구성인자 변화에 따른 배수통문 설치 제방의 건전도 평가를 수행하였다. 평가결과, 문산배수통문 설치 제방의 설계수위파형은 최대 57 시간 이상의 평수위상승시간 및 53 시간 이상의 홍수위지속시간 등을 반영하여 설정하여야 할 것으로 평가되었다.

하천유역의 설계 홍수량 결정을 위한 P.M.P.의 산정 및 적용 (PMP Estimation and Its Application for the Design Flood Determination in River Basin)

  • 이순탁;박정규
    • 물과 미래
    • /
    • 제19권1호
    • /
    • pp.75-86
    • /
    • 1986
  • 본연구는 하천유역에 있어서, 대규모 수공구조물의 설계홍수량 결정을 위한 최대가능강우량(PMP)분석 및 적용에 그 목적이 있다. PMP는 수문기상학적 방법,통계학적 방법, 포락선 방법으로 산정하였으며, 최대가능홍수량(PMF)은 합성단위도법과 Chow 방법으로 산정하였다. 각 방법에 의한 PMP를 비교해 본 결과, 통계학적 방법, 수문기상학적 방법, 포락선 방법의 크기 순으로 나타나고 있음을 알 수 있었으며, 산정된 PMP를 기왕의 최대강우량과 비교해 본 결과 수문기상학적 방법이 기상학적 제요소를 고려한 방법이 가장 타당한 방법이라고 사료된다. 산정된 PMP 및 PMF를 확률 수문량과 비교해 본 결과 수문기상학적 방법 및 통계학적 방법은 재현기간 1000년 확률 수문량을 다소 상회하는 것으로 나타났으며, 포락선 방법은 재현기간 200∼500 년 확률 수문량에 접근하고 있음을 알 수 있었다.대규모 수공 구조물의 설계에 있어서 위험도를 고려할 경우에는 PMP로부터 PMF를 산정하는 것이 타당할 것이다.

  • PDF

이상홍수를 고려한 퍼지 최적 저수지 운영 (Fuzzy Optimal Reservoir Operation Considering Abnormal Flood)

  • 최창원;유명수;이재응
    • 대한토목학회논문집
    • /
    • 제32권4B호
    • /
    • pp.221-232
    • /
    • 2012
  • 본 연구에서는 이상홍수 발생 시 저수지의 안전성을 확보함과 동시에 두 개의 저수지를 효율적으로 연계운영하여 하류의 홍수피해를 줄이기 위한 모형을 개발하였다. 이상홍수 발생 시 저수지 최적연계운영을 위해 선형계획법을 사용하였고, 저수지 운영에서 유입량, 저수지 수위, 유입량의 증감 등의 요소에 포함된 불확실성을 해결하기 위해 퍼지제어기법을 도입하였다. 선형계획법을 이용하여 이상홍수 유입에 따른 저수지 최적연계운영규칙을 찾아내고, 퍼지제어기법을 사용하여 신속하고 정교한 운영이 요구되는 이상홍수 유입상황에 사용할 수 있는 모형을 개발하였다. 본 연구에서는 낙동강 상류에 위치한 안동댐과 임하댐을 대상으로 각 댐의 저수지에 100년 빈도의 홍수와 PMF가 유입될 때 안동시의 계획홍수량을 초과하지 않도록 저수지최적연계운영을 실시하였고, 최적연계운영규칙과 퍼지제어기법을 사용하여 댐 하류지점의 유량과 각 댐별 저류량, 유입량, 유입량의 증감에 따라 방류량을 결정하는 모형을 개발하였다. 개발된 모형은 안동댐과 임하댐의 각 저수지 및 안동시의 유황에 따라 결정되는 224개의 퍼지규칙으로 정리되었으며, GUI를 통해 현재 유황을 입력하면 각 댐의 방류량을 간단히 결정할 수 있다.