• Title/Summary/Keyword: design criteria

Search Result 4,500, Processing Time 0.033 seconds

Foundation Methods for the Soft Ground Reinforcement of Lightweight Greenhouse on Reclaimed Land: A review (간척지 온실 기초 연약지반 보강 방법에 대한 고찰)

  • Lee, Haksung;Kang, Bang Hun;Lee, Su Hwan
    • Journal of Bio-Environment Control
    • /
    • v.29 no.4
    • /
    • pp.440-447
    • /
    • 2020
  • The demand for large-scale horticultural complexes utilizing reclaimed lands is increasing, and one of the pending issues for the construction of large-scale facilities is to establish foundation design criteria. In this paper, we tried to review previous studies on the method of reinforcing the foundation of soft ground. Target construction methods are spiral piles, wood piles, crushed stone piles and PF (point foundation) method. In order to evaluate the performance according to the basic construction method, pull-out resistance, bearing capacity, and settlement amount were measured. At the same diameter, pull-out resistance increased with increasing penetration depth. Simplified comparison is difficult due to the difference in reinforcement method, diameter, and penetration depth, but it showed high bearing capacity in the order of crushed stone pile, PF method, and wood pile foundation. In the case of wood piles, the increase in uplift resistance was different depending on the slenderness ratio. Wood, crushed stone pile and PF construction methods, which are foundation reinforcement works with a bearing capacity of 105 kN/㎡ to 826 kN/㎡, are considered sufficient methods to be applied to the greenhouse foundation. There was a limitation in grasping the consistent trend of each foundation reinforcement method through existing studies. If these data are supplemented through additional empirical tests, it is judged that a basic design guideline that can satisfy the structure and economic efficiency of the greenhouse can be presented.

Conceptual Design of Constructed Wetlands to Treat Acid Mine Drainage from the Dalsung W-CU Mine, Korea (달성중석광산(達城重石鑛山) 산성폐수(酸性廢水) 처리(處理)를 위(爲)한 인공소택지(人工沼澤池) 개념(槪念) 설계(設計))

  • Hong, Yong-Kook;Filipek, L.;Na, Hyun-Joon
    • Economic and Environmental Geology
    • /
    • v.29 no.1
    • /
    • pp.65-75
    • /
    • 1996
  • Sulfate reduction and the precipitation of metal sulfides may have great potential to improve water quality of mine effluents in wetland treatment systems. Laboratory experiments using sulfate reducing bacteria (SRB) and limestone to treat effluents from the abandoned Dalsung tungsten-copper mine show that encouraging results, that have been attributed to sulfate reduction. Fe, Al, Cd, Cu and Zn are reduced to below detection limits with $99{\sim}100%$ metal removal rates, Mn is reduced by at least 90% to below 8.0 mg/l, and the pH is raised from 5.12 to 7.60 after 53 days of experiments. In the staged design, laboratory experiments are initiated to determine what would be reasonable substrate materials for remediation of the mine effluents. A substrate mixture containing 70% oak compost and 30% mushroom compost maintains $0.03{\sim}0.04mM$ of lactate, which provides good condition for the SRB granule. A downflow SRB wetland system is proposed as follows : 1) The lower part of the treatment system consists with a 25 cm thick layer of high quality (above 95% of $CaCO_3$) of limestone; 2) The geotextile (geonet) is recommended to be spread on the limestone bed to prevent clogging the limestones with the substrates; 3) The mixture of substrates with 70% oak and 30% spent mushroom composts, and SRB granules overlain on top of the geonet with 25 cm height. The sizes of the passive treatment systems are calculated according to metal loading and permeability criteria : 1) $220m^3$ ($15{\times}15{\times}1m$) for -1 level effluents; 2) $28m^3$ ($5.3{\times}5.3{\times}1m$) for -2 level; and 3) $2700m^3$ ($52{\times}52{\times}1m$) for the -3 level. The -3 level system needs to be broken down into 5 to 15 cells.

  • PDF

A Study on the Dimensionless Flood Waves for the Unsteady Seepage Analysis of the Levees (하천제방의 비정상침투해석을 위한 무차원 설계홍수파형에 관한 연구)

  • Jeon, Se-Jin;Kwon, Kyung-Jun;Ahn, Won-Sik
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.4
    • /
    • pp.81-89
    • /
    • 2009
  • The seepage should be analyzed to design or reinforce the levees. The steady seepage analysis is an usual application in USA and European countries where the large scaled dams and levees are existed. However, Korea and Japan, where the reaching time is short, the excessive forces are applied on the levees at the short reaching time if the seepages are analyzed in steady condition. Accordingly, the unsteady analysis based on the variation of time is necessitated. In the unsteady analysis, the flood wave type is necessary. No criteria and standards, however, are derived for the unsteady seepage in Korea. In the study, the flood wave type is derived for the unsteady seepage. The major reliable flood surface data are collected in 5 stations including Jindong of the Nakdong river basin. The data are sorted in duration, and they are non-dimensionalized. The statistical method is also applied to derive the waves. To verify the study, the seepage is analyzed by the derived wave and applied to the prototype. The results are also compared with the Japanese Method. The errors between the hydraulic gradient and critical velocity method are $0{\sim}0.7%$, $0{\sim}0.7%$ at the Jindong, $1.6{\sim}4.0%$, $1.7{\sim}4.1%$ at the Hyunpoong, $0.6{\sim}3.6%$, $0.6{\sim}3.7%$ at the Waegwan, $2.0{\sim}8.1%$, $2.0{\sim}8.1%$ at the Nakdong, and $1.2{\sim}9.8%$, $1.3{\sim}9.9%$ at the Jeongam, respectively. The relationship($R^2$) between each method is relatively high as $0.983{\sim}0.999$. This means the results are more logical than the Japanese method, and the study is applicable to the design of hydraulic structures.

Determination of proper ground motion prediction equation for reasonable evaluation of the seismic reliability in the water supply systems (상수도 시스템 지진 신뢰성의 합리적 평가를 위한 적정 지반운동예측식 결정)

  • Choi, Jeongwook;Kang, Doosun;Jung, Donghwi;Lee, Chanwook;Yoo, Do Guen;Jo, Seong-Bae
    • Journal of Korea Water Resources Association
    • /
    • v.53 no.9
    • /
    • pp.661-670
    • /
    • 2020
  • The water supply system has a wider installation range and various components of it than other infrastructure, making it difficult to secure stability against earthquakes. Therefore, it is necessary to develop methods for evaluating the seismic performance of water supply systems. Ground Motion Prediction Equation (GMPE) is used to evaluate the seismic performance (e.g, failure probability) for water supply facilities such as pump, water tank, and pipes. GMPE is calculated considering the independent variables such as the magnitude of the earthquake and the ground motion such as PGV (Peak Ground Velocity) and PGA (Peak Ground Acceleration). Since the large magnitude earthquake data has not accumulated much to date in Korea, this study tried to select a suitable GMPE for the domestic earthquake simulation by using the earthquake data measured in Korea. To this end, GMPE formula is calculated based on the existing domestic earthquake and presented the results. In the future, it is expected that the evaluation will be more appropriate if the determined GMPE is used when evaluating the seismic performance of domestic waterworks. Appropriate GMPE can be directly used to evaluate hydraulic seismic performance of water supply networks. In other words, it is possible to quantify the damage rate of a pipeline during an earthquake through linkage with the pipe failure probability model, and it is possible to derive more reasonable results when estimating the water outage or low-pressure area due to pipe damages. Finally, the quantifying result of the seismic performance can be used as a design criteria for preparing an optimal restoration plan and proactive seismic design of pipe networks to minimize the damage in the event of an earthquake.

Production Date and Patrons of Korean Treasure #978: Transcription of the Avatamsaka Sutra (Zhou Version) in Gold on White Paper (보물 제978호 <백지금니대방광불화엄경(白紙金泥大方廣佛華嚴經) 권(卷)29>의 조성 연대 및 발원자 고찰)

  • Won, Seunghyun
    • MISULJARYO - National Museum of Korea Art Journal
    • /
    • v.98
    • /
    • pp.78-103
    • /
    • 2020
  • Transcribed Buddhist sutras generally consist of a frontispiece illustration, sutra illustrations, and sutra text, although some parts may be lost over time. Most transcribed sutras originally include an official record of the transcription (saseonggi) at either the beginning or end of the volume, which document various details of the production, including who commissioned the sutra and when it was transcribed. If such records are unavailable or difficult to decipher, the date of the sutra can only be estimated by comparison to other works with known production dates. This is the case with Korean Treasure #978, the "Transcription of the Avatamsaka Sutra (Zhou Version) in Gold on White Paper" (hereinafter, "Avatamsaka Sutra, Volume 29"), which does not contain any details of its production. Based on formal comparisons, the volume has been estimated to date from the early Joseon period. Important criteria for estimating the production date include the type of calligraphy script and the overall expression of the sutra illustrations. However, these features are missing from some early Joseon sutras, making it difficult to definitively assert which characteristics are representative of the period. Also, transcribed sutras from the late Goryeo period (after 1350) and early Joseon period are often very similar in terms of the expression of the frontispiece illustrations and sutra illustrations. From the late Goryeo period through the early Joseon period, the illustrations of transcribed sutras, which had previously been relatively detailed and realistic, gradually became more formalized and stylized. Significantly, Avatamsaka Sutra, Volume 29 includes illustrations showing both styles of expression (i.e., realistic and formalized). Moreover, the hemp leaf design on the frontispiece and the border around the sutra illustrations are unique features that have never been seen on any other transcribed sutras. Notably, however, Avatamsaka Sutra in Gold on White Paper, Volume 26 (hereinafter, "Avatamsaka Sutra, Volume 26"), which has not yet been introduced in academic research, is complete with frontispiece, sutra illustrations, and sutra text. This sutra is identical to Avatamsaka Sutra, Volume 29 in size, composition, and details, and is thus estimated to have been produced at the same time and by the same patrons. According to the record at the end of the volume, Avatamsaka Sutra, Volume 26 was commissioned in 1348 by Gi Cheol (d. 1365), which corresponds to the estimated date of Avatamsaka Sutra, Volume 29 derived by formal comparison. Based on this new information, Avatamsaka Sutra, Volume 29 was likely produced in the late Goryeo period rather than the early Joseon period, as has previously been presumed. The new study of Avatamsaka Sutra, Volume 26 also seems to confirm that both sutras were transcribed by highly skilled artisans in 1348 of the late Goryeo period, a transitional phase in the expression of sutra illustrations.

A comparative study of risk according to smoke control flow rate and methods in case of train fire at subway platform (지하철 승강장에서 열차 화재 시 제연풍량 및 방식에 따른 위험도 비교 연구)

  • Ryu, Ji-Oh;Lee, Hu-Yeong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.4
    • /
    • pp.327-339
    • /
    • 2022
  • The purpose of this study is to present the effective smoke control flow rate and mode for securing safety through quantitative risk assessment according to the smoke control flow rate and mode (supply or exhaust) of the platform when a train fire occurs at the subway platform. To this end, a fire outbreak scenario was created using a side platform with a central staircase as a model and fire analysis was performed for each scenario to compare and analyze fire propagation characteristics and ASET, evacuation analysis was performed to predict the number of deaths. In addition, a fire accident rate (F)/number of deaths (N) diagram (F/N diagram) was prepared for each scenario to compare and evaluate the risk according to the smoke control flow rate and mode. In the ASET analysis of harmful factors, carbon monoxide, temperature, and visible distance determined by performance-oriented design methods and standards for firefighting facilities, the effect of visible distance is the largest, In the case where the delay in entering the platform of the fire train was not taken into account, the ASET was analyzed to be about 800 seconds when the air flow rate was 4 × 833 m3/min. The estimated number of deaths varies greatly depending on the location of the vehicle of fire train, In the case of a fire occurring in a vehicle adjacent to the stairs, it is shown that the increase is up to three times that of the vehicle in the lead. In addition, when the smoke control flow rate increases, the number of fatalities decreases, and the reduction rate of the air supply method rather than the exhaust method increases. When the supply flow rate is 4 × 833 m3/min, the expected number of deaths is reduced to 13% compared to the case where ventilation is not performed. As a result of the risk assessment, it is found that the current social risk assessment criteria are satisfied when smoke control is performed, and the number of deaths is the flow rate 4 × 833 m3/min when smoke control is performed at 29.9 people in 10,000 year, It was analyzed that it decreased to 4.36 people.

The Private-Initiated Park Development Project in Terms of Securing Publicity Operation Characteristics Analysis - Busan Metropolitan City as a Case - (공공성 확보측면에서 민간공원특례사업 운영특성분석 - "부산광역시를 사례로" -)

  • Gweon, Young-Dal;Park, Hyun-Bin;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.1
    • /
    • pp.13-28
    • /
    • 2023
  • This study examines the process of project promotion in Busan, which introduced the private participation-type consultative body for the first time in the country in the promotion stage of the private-initiated park development project, and introduced flexible application of the system and differentiated policy elements in the implementation process, and examines the operational characteristics and we tried to analyze performance, etc. As a result of the analysis, first, the preferred bidder was selected by introducing a mixed method in the project method, which is an independent project method that cannot be seen in other local governments. Second, by specifying guidelines considering the characteristics of each park and detailed guidelines such as the location, area, and maximum height of non-park facilities, criteria for establishing a rational development plan utilizing regional identity and the basis of evaluation standards were laid. Third, in the project process, transparency was secured through the delegation-type roundtable, in which the private sector performs the functions and roles of key actors, thereby preventing disputes such as suspicion of preferential treatment. Fourth, in order to improve the quality of park facilities to be donated and to secure design adequacy, after approval of the implementation plan, a general planner was introduced and construction project management (design stage) services were performed to promote efficient implementation and specialization of luxury parks in the region. As a result, the city of Busan carried out the project efficiently by conserving 5 parks from sunset, a park area of 2.25km2, and reducing land compensation and park construction costs by KRW 740 billion. Reinforcement of the public nature of the private-initiated park development project was suggested. However, due to the application of these systems and verification procedures, the project period is prolonged, and park services are delayed along with the financial burden on private operators.

Impact Assessment of Agricultural Reservoir on Streamflow Simulation Using Semi-distributed Hydrologic Model (준분포형 모형을 이용한 농업용 저수지가 안성천 유역의 유출모의에 미치는 영향 평가)

  • Kim, Bo Kyung;Kim, Byung Sik;Kwon, Hyun Han
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1B
    • /
    • pp.11-22
    • /
    • 2009
  • Long-term rainfall-runoff modeling is a key element in the Earth's hydrological cycle, and associated with many different aspects such as dam design, drought management, river management flow, reservoir management for water supply, water right permission or coordinate, water quality prediction. In this regard, hydrologists have used the hydrologic models for design criteria, water resources assessment, planning and management as a main tool. Most of rainfall-runoff studies, however, were not carefully performed in terms of considering reservoir effects. In particular, the downstream where is severely affected by reservoir was poorly dealt in modeling rainfall-runoff process. Moreover, the effects can considerably affect overall the rainfallrunoff process. An objective of this study, thus, is to evaluate the impact of reservoir operation on rainfall-runoff process. The proposed approach is applied to Anseong watershed, where is in a mixed rural/urban setting of the area and in Korea, and has been experienced by flood damage due to heavy rainfall. It has been greatly paid attention to the agricultural reservoirs in terms of flood protection in Korea. To further investigate the reservoir effects, a comprehensive assessment for the results are discussed. Results of simulations that included reservoir in the model showed the effect of storage appeared in spring and autumn when rainfall was not concentrated. In periods of heavy rainfall, however, downstream runoff increased in simulations that do not consider reservoir factor. Flow duration curve showed that changes in streamflow depending upon the presence or absence of reservoir factor were particularly noticeable in ninety-five day flow and low flow.

An Analytical Study on the Seismic Behavior and Safety of Vertical Hydrogen Storage Vessels Under the Earthquakes (지진 시 수직형 수소 저장용기의 거동 특성 분석 및 안전성에 관한 해석적 연구)

  • Sang-Moon Lee;Young-Jun Bae;Woo-Young Jung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.6
    • /
    • pp.152-161
    • /
    • 2023
  • In general, large-capacity hydrogen storage vessels, typically in the form of vertical cylindrical vessels, are constructed using steel materials. These vessels are anchored to foundation slabs that are specially designed to suit the environmental conditions. This anchoring method involves pre-installed anchors on top of the concrete foundation slab. However, it's important to note that such a design can result in concentrated stresses at the anchoring points when external forces, such as seismic events, are at play. This may lead to potential structural damage due to anchor and concrete damage. For this reason, in this study, it selected an vertical hydrogen storage vessel based on site observations and created a 3D finite element model. Artificial seismic motions made following the procedures specified in ICC-ES AC 156, as well as domestic recorded earthquakes with a magnitude greater than 5.0, were applied to analyze the structural behavior and performance of the target structures. Conducting experiments on a structure built to actual scale would be ideal, but due to practical constraints, it proved challenging to execute. Therefore, it opted for an analytical approach to assess the safety of the target structure. Regarding the structural response characteristics, the acceleration induced by seismic motion was observed to amplify by approximately ten times compared to the input seismic motions. Additionally, there was a tendency for a decrease in amplification as the response acceleration was transmitted to the point where the centre of gravity is located. For the vulnerable components, specifically the sub-system (support columns and anchorages), the stress levels were found to satisfy the allowable stress criteria. However, the concrete's tensile strength exhibited only about a 5% margin of safety compared to the allowable stress. This indicates the need for mitigation strategies in addressing these concerns. Based on the research findings presented in this paper, it is anticipated that predictable load information for the design of storage vessels required for future shaking table tests will be provided.

Calculation of Unit Hydrograph from Discharge Curve, Determination of Sluice Dimension and Tidal Computation for Determination of the Closure curve (단위유량도와 비수갑문 단면 및 방조제 축조곡선 결정을 위한 조속계산)

  • 최귀열
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.7 no.1
    • /
    • pp.861-876
    • /
    • 1965
  • During my stay in the Netherlands, I have studied the following, primarily in relation to the Mokpo Yong-san project which had been studied by the NEDECO for a feasibility report. 1. Unit hydrograph at Naju There are many ways to make unit hydrograph, but I want explain here to make unit hydrograph from the- actual run of curve at Naju. A discharge curve made from one rain storm depends on rainfall intensity per houre After finriing hydrograph every two hours, we will get two-hour unit hydrograph to devide each ordinate of the two-hour hydrograph by the rainfall intensity. I have used one storm from June 24 to June 26, 1963, recording a rainfall intensity of average 9. 4 mm per hour for 12 hours. If several rain gage stations had already been established in the catchment area. above Naju prior to this storm, I could have gathered accurate data on rainfall intensity throughout the catchment area. As it was, I used I the automatic rain gage record of the Mokpo I moteorological station to determine the rainfall lntensity. In order. to develop the unit ~Ydrograph at Naju, I subtracted the basic flow from the total runoff flow. I also tried to keed the difference between the calculated discharge amount and the measured discharge less than 1O~ The discharge period. of an unit graph depends on the length of the catchment area. 2. Determination of sluice dimension Acoording to principles of design presently used in our country, a one-day storm with a frequency of 20 years must be discharged in 8 hours. These design criteria are not adequate, and several dams have washed out in the past years. The design of the spillway and sluice dimensions must be based on the maximun peak discharge flowing into the reservoir to avoid crop and structure damages. The total flow into the reservoir is the summation of flow described by the Mokpo hydrograph, the basic flow from all the catchment areas and the rainfall on the reservoir area. To calculate the amount of water discharged through the sluiceCper half hour), the average head during that interval must be known. This can be calculated from the known water level outside the sluiceCdetermined by the tide) and from an estimated water level inside the reservoir at the end of each time interval. The total amount of water discharged through the sluice can be calculated from this average head, the time interval and the cross-sectional area of' the sluice. From the inflow into the .reservoir and the outflow through the sluice gates I calculated the change in the volume of water stored in the reservoir at half-hour intervals. From the stored volume of water and the known storage capacity of the reservoir, I was able to calculate the water level in the reservoir. The Calculated water level in the reservoir must be the same as the estimated water level. Mean stand tide will be adequate to use for determining the sluice dimension because spring tide is worse case and neap tide is best condition for the I result of the calculatio 3. Tidal computation for determination of the closure curve. During the construction of a dam, whether by building up of a succession of horizontael layers or by building in from both sides, the velocity of the water flowinii through the closing gapwill increase, because of the gradual decrease in the cross sectional area of the gap. 1 calculated the . velocities in the closing gap during flood and ebb for the first mentioned method of construction until the cross-sectional area has been reduced to about 25% of the original area, the change in tidal movement within the reservoir being negligible. Up to that point, the increase of the velocity is more or less hyperbolic. During the closing of the last 25 % of the gap, less water can flow out of the reservoir. This causes a rise of the mean water level of the reservoir. The difference in hydraulic head is then no longer negligible and must be taken into account. When, during the course of construction. the submerged weir become a free weir the critical flow occurs. The critical flow is that point, during either ebb or flood, at which the velocity reaches a maximum. When the dam is raised further. the velocity decreases because of the decrease\ulcorner in the height of the water above the weir. The calculation of the currents and velocities for a stage in the closure of the final gap is done in the following manner; Using an average tide with a neglible daily quantity, I estimated the water level on the pustream side of. the dam (inner water level). I determined the current through the gap for each hour by multiplying the storage area by the increment of the rise in water level. The velocity at a given moment can be determined from the calcalated current in m3/sec, and the cross-sectional area at that moment. At the same time from the difference between inner water level and tidal level (outer water level) the velocity can be calculated with the formula $h= \frac{V^2}{2g}$ and must be equal to the velocity detertnined from the current. If there is a difference in velocity, a new estimate of the inner water level must be made and entire procedure should be repeated. When the higher water level is equal to or more than 2/3 times the difference between the lower water level and the crest of the dam, we speak of a "free weir." The flow over the weir is then dependent upon the higher water level and not on the difference between high and low water levels. When the weir is "submerged", that is, the higher water level is less than 2/3 times the difference between the lower water and the crest of the dam, the difference between the high and low levels being decisive. The free weir normally occurs first during ebb, and is due to. the fact that mean level in the estuary is higher than the mean level of . the tide in building dams with barges the maximum velocity in the closing gap may not be more than 3m/sec. As the maximum velocities are higher than this limit we must use other construction methods in closing the gap. This can be done by dump-cars from each side or by using a cable way.e or by using a cable way.

  • PDF