• Title/Summary/Keyword: design chart

Search Result 558, Processing Time 0.025 seconds

The Clinical Examination of Netspeg Lens for Good Visual Acuity (시력 개선을 위한 Netspeg 렌즈의 임상적 검증)

  • Kim, Douk-Hoon;Bae, Han-Young;Kim, Sun-Tae
    • Journal of Korean Ophthalmic Optics Society
    • /
    • v.11 no.3
    • /
    • pp.281-291
    • /
    • 2006
  • The aim of this study was performed the clinical test using Netspeg lens for good visual acuity on subjects with abnormal refraction status. The subjects of one hundreds adults (fifty males, fifty females, mean=21 years, range=19 to 24) were recorded. The subjects were researched the history including the systemic health, medication, genetics, allergy, systemic disease and ocular disease. The refraction test was recorded the monocular and binocular using objective method. Visual acuity was performed the binocular status using the Netspeg lens and CR-39. Stereopsis test was performed the titmus fly and TNO at near distance using Netspeg lens and CR-39. The P-VEP test was used the 16 pattern size(Bausch Lomb, production in USA) with three channels. Also Subjects viewed the p-vep stimulus with binocular vision through the corrected visual acuity using the Netspeg lens and CR-39. The contrast sensitivity test was performed the contrast sensitivity chart(pelli-Robertson, USA) at 1m distance using the Netspeg lens and CR-39. The ultrastructure of surface on the Netspeg lens and CR-39 was observed the SEM(JMS-5800, made in Japan). The results of this study was as follows: 1. In corrected visual acuity of abnormal refraction using the Netspeg lens and CR-39, the Netspeg lens wearer were acquired the good visual field and clear visual acuity comparative to CR-39 wearer in the subject vision test. however the comfort of visual acuity was similar results in the Netspeg lens and CR-39. Also the subjects of Netspeg lens wearer was good visual acuity more than CR-39 wearer and in the analysis of P-VEP, the amplitude of wave on Netspeg lens used appears to be better through the CR-39(p>0.5). Besides, on the contrast sensitivity, the Netspeg lens wearer was good results than CR-39. The value on stereopsis with TNO by Netspeg lens wearer was better than CR-39 in results. However, in the stereopsis test with Titmus, the Netspeg lens and CR-39 wearer was similar results. 2. The ultrastructure of Netspeg lens surface was the smooth and fine shape more than CR-39. Also, Netspeg lens have a fine line structure in ultrastructure. In conclusion, the results of this study conformed that the surface ultrastructure of Netspeg lens used is more specific pin hole design structure than CR-39. This study indicated that the vision of Netspeg lens used have a better than CR-39 in the corrected visual acuity for abnormal refraction eye. Therefore, In this paper, we suggested that the ultrastructure and line structure of Netspeg lens was related to good visual function. However the visual function of the aspheric Netspeg and ultra waterproof Netspeg lens was similar results.

  • PDF

A Study on the Adolescent Growth Spurt of Skinfold, Muscle and Bone Variables Aligned on Peak Height Velocity in Boys and Girls (PHV 척도를 기준한 피하지방후, 근과 골 변인의 사춘기 발육분출에 관한 연구)

  • Shin Sang-Keun
    • Journal of Life Science
    • /
    • v.16 no.2 s.75
    • /
    • pp.339-344
    • /
    • 2006
  • The aim of this study was to examine the timing and magnitude of growth spurt in skinfold, body musle and bone related variables aligned on peak height velocity in boys and girls. In the study design, the subjects and the method were used by the cross-sectional investigation. The subjects participated in this study were 7 through 18 years of age belonged to typical primary, junior, senior high school students, and about 250 males and 250 females in each age group. The total subjects were 2,798 males and 2,762 females. All subjects of this study were lived in Pusan metropolitan city, Korea. The growth velocity magnitudes of sum of the four sites sknfold thickness, body musle and bone related variables. Velocity curve chart of physique was the smoothed according to an approximation of splines by the Sigma Plot-2001 graphic program. In this study, age at PHV of girls occurred eariler about 2 years than boys. In sum of four sites skinfold thickness, PV occurred -2 years from PHV in boys, and PV occurred +2 years from PHV in girls, respectively. In humerus breadth, two PV occurred before and after PHV in boys, whereas PV occurred -1 year from PHV in girls, respectively. In femur breadth, PFV and PHV appeared to occure the same time in boys, PV occurred -2 years from PHV in girls, respectively, In arm circumference, PV occurred after PHV in both sexes. In calf circumference, PV occurred +2 years from PHV in boys, PCCV and PHV appeared to occure the same time in girls, respectively. In magnitudes of peak velocity of body height, humerus breadth, femur breadth, arm circumference and calf circumfence, boys obtained higher than girls, on the other hand, girls obtained higher than boys in sum of four sites skinfold variable. we need to longitudinal and scientific investigation by Korean government level in adolescent growth spurt study, because childhood and adolescence achive higher positive physical education effect than the other ages.

Development and Evaluation of an Educational Program for the Clothing life Domain in Home Economics through a Theme-Based Integrated Approach (주제 중심 통합적 접근에 의한 가정 교과 의생활 영역 교육 프로그램 개발과 평가 - "의복관리"와 "섬유(재료)" 주제를 중심으로 -)

  • Kim, Nam-Eun;Lee, Hye-Ja
    • Journal of Korean Home Economics Education Association
    • /
    • v.22 no.3
    • /
    • pp.163-188
    • /
    • 2010
  • This study set out to develop and evaluate an educational program for the Clothing Life of Home Economics through the theme-based integrated approach develop integrated thinking abilities for solving everyday problems. For those purposes, it selected a couple of themes in the area of Clothing Life toward which the theme-based integrated approach could be develop and evaluate an educational program. The developed program was applied and assessed in total 28 hours of field lessons given to eighth graders attending B Middle School in Busan Metropolitan City. The analysis stage involved an exploration into programs related to an integrated approach to other subjects; the design stage identification of program types; and the development stage theme selection according to the selection criteria. The previous studies were analyzed along with the Technology and Home Economics textbooks to select a theme. two themes "Clothing Management" and "Fabrics(Materials)" were selected after discussing with the students on the Messenger and with a group of experts. Then content was organized and composed around the themes by discussing connections with other subjects. There were three evaluation; one by experts, another through preliminary lessons, and the other through field lessons. Following the research procedure, a theme-based integrated program was developed for the two selected themes. It contained total 49 and 32 learning materials for "Clothing Management" and "Fabrics(Materials)," respectively. Those learning materials were comprised of experiments and practices according to the nature of the themes. Each program consisted of the goals, learning content, content organization chart, learning activities, and evaluation; learning activities experiences, practice and experiment activities, self-directed activities and problem-solving processes; and evaluations self-evaluation, teacher evaluation, peer evaluation, portfolio, and experiment reports. The program was assessed three times. The first and second evaluation results found that the program was well compatible with the current needs, was properly organized to give lessons through integration with other subjects, and continuously maintained the students' interest. They, however, requested that there should be detailed explanations about each part of the program content. In the third evaluation done by the students during field lessons, 60% of them said that the program was fun and its content was easy to understand, that they realized a theme could be connected to several other subjects, and that the program could be applied to actual life. The educational program through the theme-based integrated approach is significant in that it is an educational program for the area of Clothing Life and tries an integrated approach. It helped the students not only gather knowledge in an integrated manner, but put it to practical uses to solve various problems they faced in actual life by creatively changing integrated knowledge. The study will be hopefully used by many teachers so that the students solve problems based on the ability of integrating various knowledges organically.

  • PDF

Theme-Based Integrative Education Program Development of Industrial Specialized High School (공업계열 특성화 고등학교의 주제 중심 통합형 교육 프로그램 개발)

  • Yoon, Ji A;Lee, Chang Hoon;Kim, Ki Soo
    • 대한공업교육학회지
    • /
    • v.38 no.1
    • /
    • pp.163-194
    • /
    • 2013
  • This study aims at giving examples that can be applied in the real education field, and it develops theme-based integrative education program for Industrial Specialized high school students. It analyzed the models of many scholars about the development of education course, and devised developmental models and procedures of the theme-based integrative education program of engineering specialized high school from those. As a result, it used and reorganized ADDIE model which is the systematic education course development model and the theme-based integrative education development model of Frazee and Rudnitski(1995) as the basic structure, and came to devise theme-based integrative education program of engineering specialized high school while referring to creative engineering design education program development model by Lee Chang-hoon. This study that is theme-based integrative education program for engineering-specialized high school students and is the result of this study has the following characters. First, This theme-based integrative education program that is developed for engineering-specialized high school students can be applied and the initial example that approach the Theme-Based. Second, This Education Program included the Activity project that is "Making Maglev" for the third grade at the engineering-specialized high school and One of the Program's aim is to bring up their attitude that engaged to in the class having the Interest. Third, Theme-based integrative education program for engineering-specialized high school is composed the workbook for the students and the teaching guidance plan for the teachers. Workbook for the students is composed four Units;"Brief about the Maglev","Basic principles about the Maglev","Intensive principles about the Maglev", Activity project about the Maglev". And each unit is made by Learning Purpose, Introducing, Learning Contents(Deepen Learning, Reading Magazines), Assesment etc. Teaching guidance plan for the teachers include that Summary, Purpose, Time Planing & Streaming Map for the class, contents associated Maglev, prerequisite learning, constructure of the education program, flow chart, learning activity, assesment(self-appraiser and peer review).

Study on Strain Measurement of Agricultural Machine Elements Using Microcomputer (Microcomputer를 이용(利用)한 농업기계요소(農業機械要素)의 Strain 측정(測定)에 관(關)한 연구(硏究))

  • Kim, Kee Dae;Kim, Tae Kyun;Kim, Soung Rai
    • Korean Journal of Agricultural Science
    • /
    • v.8 no.1
    • /
    • pp.90-96
    • /
    • 1981
  • To design more efficient agricultural machinery, the accurately measuring system among many other factors is essential. A light-beam oscillographic recorder is generally used in measuring dynamic strain but it is not compatible with the extremely high speed measuring system such as 1,000 m/s, also is susceptable to damage due to vibration while using the system in field. The recorder used light sensitive paper for strip chart recording. The reading and analysis of data from the strip charts is very cumbersome, errorneous and time consuming. A microcomputer was interfaced with A/D converter, microcomputer program was developed for measuring, system calibration was done and the strain generated from a cantilever beam vibrator was measured. The results are summarized as follows. 1. Microcomputer program was developed to perform strain measuring of agricultural machine elements and could be controled freely the measuring intervals, no. of channels and no. of data. The maximum measuring speed was $62{\mu}s$. 2. Calibration the system was performed with triangle wave generated from a function generator and checked by an oscilloscope. The sampled data were processed using HP 3000 minicomputer of Chungnam National University computer center the graphical results were triangle same as input wave and so the system have been out of phase distorsion and amplitude distorsion. 3. The strain generated from a cantilever beam vibrator which has free vibration period of 0.019 second were measured by the system controlled to have l.0 ms of time interval and its computer output showing vibration curve which is well filted to theoretical value. 4. Using microcomputer on measuring the strain of agricultural machine elements could not only save analyzing time and recording papers but also get excellent adaptation to field experiment, especially in measurement requiring high speed and good precision.

  • PDF

From the Onset of Panic Symptoms to Getting to a Psychiatric Treatment : The Change by Improved Public Awareness of Panic Disorder in Korea (증상의 발현부터 치료의 시작까지 : 한국인의 공황장애 인식도 변화가 치료적 접근에 미친 영향)

  • Choi, Yong-Won;Seo, Ho-Jun;Han, Sang-Woo;Hong, Jin-Pyo;Lee, Kyoung-Uk;Kim, Se-Joo;Lim, Se-Won;Lee, Sang-Hyuk;Yang, Jong-Chul;Lee, Seung-Jae;Park, Seon-Cheol;Gim, Min-Sook;Chae, Jeong-Ho
    • Anxiety and mood
    • /
    • v.15 no.2
    • /
    • pp.61-67
    • /
    • 2019
  • Objective : This study aimed to investigate the general process from the symptom onset to the psychiatric treatment in Korean panic patients and the effect of improved public awareness on it. Methods : This study has a retrospective design. The subjects were the new patients with panic disorder who visited the psychiatric outpatient clinic in twelve university-affiliated hospitals all across Korea. The medical chart was reviewed retrospectively and the data were collected including chief complaints of symptoms, recent stressors, the time to visit the psychiatric outpatient clinic, and visit of other departments and diagnostic approaches for their symptoms. Results : A total of 814 participants were included in the study. The most common department other than psychiatry the panic patients visited were cardiology (28.3%), general internal medicine (16.0%) and neurology (11.4%). The most frequently used diagnostic tests were a echocardiography (17.9%), 24-hour Holter monitoring (11.2%), and brain MRI (8.2%). Only 37.3% of participants visited psychiatric clinic directly. About 80% of participants visited psychiatric department within 1 year after their first panic symptoms and it took $13.8{\pm}13.7weeks$ on average. Comparing before and after 2012, the number of participants increased who visit directly the psychiatric clinic without visiting other departments (p=0.002) and without visiting emergency room (p<0.001). Conclusions : Our results suggest that a substantial number of patients visit departments other than psychiatry when they experience first panic symptoms. However, most patients begin psychiatric treatment within 1 year after their first symptoms and the number of patient are increasing who visit psychiatric department directly without visiting other departments.

Introduction of the Best Practices in the Pakistan Gulpur HEPP (파키스탄 Gulpur 수력발전 현장의 Best Practices 소개)

  • JANG, Ock Jae;HONG, Won Pyo;CHAE, Hee Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF

Studies on the Derivation of the Instantaneous Unit Hydrograph for Small Watersheds of Main River Systems in Korea (한국주요빙계의 소유역에 대한 순간단위권 유도에 관한 연구 (I))

  • 이순혁
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.19 no.1
    • /
    • pp.4296-4311
    • /
    • 1977
  • This study was conducted to derive an Instantaneous Unit Hydrograph for the accurate and reliable unitgraph which can be used to the estimation and control of flood for the development of agricultural water resources and rational design of hydraulic structures. Eight small watersheds were selected as studying basins from Han, Geum, Nakdong, Yeongsan and Inchon River systems which may be considered as a main river systems in Korea. The area of small watersheds are within the range of 85 to 470$\textrm{km}^2$. It is to derive an accurate Instantaneous Unit Hydrograph under the condition of having a short duration of heavy rain and uniform rainfall intensity with the basic and reliable data of rainfall records, pluviographs, records of river stages and of the main river systems mentioned above. Investigation was carried out for the relations between measurable unitgraph and watershed characteristics such as watershed area, A, river length L, and centroid distance of the watershed area, Lca. Especially, this study laid emphasis on the derivation and application of Instantaneous Unit Hydrograph (IUH) by applying Nash's conceptual model and by using an electronic computer. I U H by Nash's conceptual model and I U H by flood routing which can be applied to the ungaged small watersheds were derived and compared with each other to the observed unitgraph. 1 U H for each small watersheds can be solved by using an electronic computer. The results summarized for these studies are as follows; 1. Distribution of uniform rainfall intensity appears in the analysis for the temporal rainfall pattern of selected heavy rainfall event. 2. Mean value of recession constants, Kl, is 0.931 in all watersheds observed. 3. Time to peak discharge, Tp, occurs at the position of 0.02 Tb, base length of hlrdrograph with an indication of lower value than that in larger watersheds. 4. Peak discharge, Qp, in relation to the watershed area, A, and effective rainfall, R, is found to be {{{{ { Q}_{ p} = { 0.895} over { { A}^{0.145 } } }}}} AR having high significance of correlation coefficient, 0.927, between peak discharge, Qp, and effective rainfall, R. Design chart for the peak discharge (refer to Fig. 15) with watershed area and effective rainfall was established by the author. 5. The mean slopes of main streams within the range of 1.46 meters per kilometer to 13.6 meter per kilometer. These indicate higher slopes in the small watersheds than those in larger watersheds. Lengths of main streams are within the range of 9.4 kilometer to 41.75 kilometer, which can be regarded as a short distance. It is remarkable thing that the time of flood concentration was more rapid in the small watersheds than that in the other larger watersheds. 6. Length of main stream, L, in relation to the watershed area, A, is found to be L=2.044A0.48 having a high significance of correlation coefficient, 0.968. 7. Watershed lag, Lg, in hrs in relation to the watershed area, A, and length of main stream, L, was derived as Lg=3.228 A0.904 L-1.293 with a high significance. On the other hand, It was found that watershed lag, Lg, could also be expressed as {{{{Lg=0.247 { ( { LLca} over { SQRT { S} } )}^{ 0.604} }}}} in connection with the product of main stream length and the centroid length of the basin of the watershed area, LLca which could be expressed as a measure of the shape and the size of the watershed with the slopes except watershed area, A. But the latter showed a lower correlation than that of the former in the significance test. Therefore, it can be concluded that watershed lag, Lg, is more closely related with the such watersheds characteristics as watershed area and length of main stream in the small watersheds. Empirical formula for the peak discharge per unit area, qp, ㎥/sec/$\textrm{km}^2$, was derived as qp=10-0.389-0.0424Lg with a high significance, r=0.91. This indicates that the peak discharge per unit area of the unitgraph is in inverse proportion to the watershed lag time. 8. The base length of the unitgraph, Tb, in connection with the watershed lag, Lg, was extra.essed as {{{{ { T}_{ b} =1.14+0.564( { Lg} over {24 } )}}}} which has defined with a high significance. 9. For the derivation of IUH by applying linear conceptual model, the storage constant, K, with the length of main stream, L, and slopes, S, was adopted as {{{{K=0.1197( {L } over { SQRT {S } } )}}}} with a highly significant correlation coefficient, 0.90. Gamma function argument, N, derived with such watershed characteristics as watershed area, A, river length, L, centroid distance of the basin of the watershed area, Lca, and slopes, S, was found to be N=49.2 A1.481L-2.202 Lca-1.297 S-0.112 with a high significance having the F value, 4.83, through analysis of variance. 10. According to the linear conceptual model, Formular established in relation to the time distribution, Peak discharge and time to peak discharge for instantaneous Unit Hydrograph when unit effective rainfall of unitgraph and dimension of watershed area are applied as 10mm, and $\textrm{km}^2$ respectively are as follows; Time distribution of IUH {{{{u(0, t)= { 2.78A} over {K GAMMA (N) } { e}^{-t/k } { (t.K)}^{N-1 } }}}} (㎥/sec) Peak discharge of IUH {{{{ {u(0, t) }_{max } = { 2.78A} over {K GAMMA (N) } { e}^{-(N-1) } { (N-1)}^{N-1 } }}}} (㎥/sec) Time to peak discharge of IUH tp=(N-1)K (hrs) 11. Through mathematical analysis in the recession curve of Hydrograph, It was confirmed that empirical formula of Gamma function argument, N, had connection with recession constant, Kl, peak discharge, QP, and time to peak discharge, tp, as {{{{{ K'} over { { t}_{ p} } = { 1} over {N-1 } - { ln { t} over { { t}_{p } } } over {ln { Q} over { { Q}_{p } } } }}}} where {{{{K'= { 1} over { { lnK}_{1 } } }}}} 12. Linking the two, empirical formulars for storage constant, K, and Gamma function argument, N, into closer relations with each other, derivation of unit hydrograph for the ungaged small watersheds can be established by having formulars for the time distribution and peak discharge of IUH as follows. Time distribution of IUH u(0, t)=23.2 A L-1S1/2 F(N, K, t) (㎥/sec) where {{{{F(N, K, t)= { { e}^{-t/k } { (t/K)}^{N-1 } } over { GAMMA (N) } }}}} Peak discharge of IUH) u(0, t)max=23.2 A L-1S1/2 F(N) (㎥/sec) where {{{{F(N)= { { e}^{-(N-1) } { (N-1)}^{N-1 } } over { GAMMA (N) } }}}} 13. The base length of the Time-Area Diagram for the IUH was given by {{{{C=0.778 { ( { LLca} over { SQRT { S} } )}^{0.423 } }}}} with correlation coefficient, 0.85, which has an indication of the relations to the length of main stream, L, centroid distance of the basin of the watershed area, Lca, and slopes, S. 14. Relative errors in the peak discharge of the IUH by using linear conceptual model and IUH by routing showed to be 2.5 and 16.9 percent respectively to the peak of observed unitgraph. Therefore, it confirmed that the accuracy of IUH using linear conceptual model was approaching more closely to the observed unitgraph than that of the flood routing in the small watersheds.

  • PDF