• Title/Summary/Keyword: demolition construction system

Search Result 67, Processing Time 0.027 seconds

Development of Integrated Computer System for Quantifying and Managing of Demolition Waste (해체폐기량 산정 및 통합관리를 위한 시스템 개발)

  • Kim, Chang-Hak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.133-140
    • /
    • 2011
  • Recently, the demolition industry is becoming more important than ever for formulating reuse and recycling of a construction waste with the current trend in pursuing a sustainable development. As considering the situation of a domestic housing construction and an existing house, a scale of a demolition market is expected to increase continually. Therefore, for a sustainable development, it is needed to forecast and manage rightly the demolition waste producted in a demolition phase. But, because most of a demolition company is very small and the investment in a technology development is not enough, the effort to develope a system and to make a standard for managing righly a demolition waste is also not sufficient. Therefore, this study develops a system to automatize quantifying a demolition waste. This system makes it possible to manage the planning of demolition works and the quantifying, disposal, reusing and recycling of a demolition waste in one system by integrating all the activities related with demolition works. 3D drawings of each element for demolition works will manage by being linked to its schedule for visualizing 3D object. Also, this study presents methods for quantifying easily a demolition waste by using 3D object.

A Development of Computerized Management System for Deconstruction (분별해체공사 통합관리 시스템의 개발)

  • Kim, Hyo-Jin;Kim, Chang-Hak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.638-641
    • /
    • 2004
  • This study suggests the optimum deconstruction management system for minimizing construction waste and increasing reuse and recycle rate of material to be different from traditional demolition. The purpose of this system is to minimize environmental damages and reduce construction waste quantity of a country by planning and operating preliminarily estimation of demolition quantity, demolition methods of each structural elements and reuse or recycle methods of C&D waste. This system is consist of four modules such as planning of preliminary demolition survey, estimating of demolition quantity, planning of demolition schedule and planning of construction waste management, and these all modules can be used individually module according to user's utilization purpose.

  • PDF

The Actual State of Demolition and Pilot Dismantling in Apartment Building (해체공사의 수행실태 및 공동주택 분별해체 시험시공)

  • Kim, Hyo-Jin;Sohn, Jeong-Rak;Park, Seong-Sik;Yoon, Yung-Sang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.113-118
    • /
    • 2007
  • Now a performance process of Demolition works is 'Before-Removal & After-Classification' method in Korea. This method is short of demolition time, but construction wastes contained substances lower recycling rate of construction, raise expenses of reclamation & treatment. Then the government has decided upon a positive 'Before-Classification & After-Removal' method, and substantially raise a recycling rate of construction wastes. Therefore, this study makes an investigation into state of internal and external demolition field through evaluating technological level, we make a proposal of dismantling method from there. Also, we put dismantling to the test in an apartment by proposed work process. As the result, it made a term of works increased for removing interior material. To solve this problem, we need to develop tools and methods of construction that can remove efficiently. From now on, we continuously need to study a breakdown system of dismantling, analysis of dismantling process and general system by inspecting entire demolition process. And we have to study details for making a specific thesis of method of removing interior material which was based on developing a suitable partial demolition machine and dismantling works.

  • PDF

Demolition Cost Estimation of Small-size Rental Housing based on the Quantity per Unit Method (원가계산방식에 의한 다가구임대주택 해체공사비 예측)

  • Park, Seong-Sik;Lee, Sung-Bok;Shin, Sang-Hoon
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.415-427
    • /
    • 2011
  • This study is aiming at estimating the demolition cost of deterioration housing by the rational method in order to provide for the demolition and new build project of the rental multi-family housing of LH. We investigated the actual state of demolition construction and work process of small size housing, and analysed an actual condition of estimation for the demolition cost through an advice by the expert of construction cost estimate. Furthermore, the 'estimation standard for the predetermined amount', 'estimation standard for the disposal cost of construction wastes' and precedent studies in public construction work were considered. As one of results in this study, cost accounting system, breakdown system and construction cost for the demolition work based on the standard of estimate were proposed and the predetermined amount of demolition construction for the multi-family housing with 2 or 3 floors could be produced by them. Eventually, It is estimated that the demolition cost per a multi-family housing is about 18,331,000(won) and 104,000(won) per floorage($m^2$). To the details, the result indicated that the direct demolition cost needs about 14,339,000(won) per a multi-family housing and the consignment disposal cost of wastes needs 3,992,000(won) per one. The results of the study will be used as the fundamental data to estimate the project cost in the phase of budget establishment for demolition and new build project of the deteriorated rental multi-family housings, and also cost accounting system of demolition construction and breakdown system are expect to be used effectively at the ordering of public construction work.

A Development of Computerized Management System for Construction and Demolition Waste (건설해체공사의 폐기물 통합관리 시스템의 개발)

  • Kim, Chang Hak;Kim, Hyo Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.627-634
    • /
    • 2006
  • Now, in a domestic country, the rebuilding and redevelopment of existing houses has been rapidly increasing with an economic growth and the improvement of living condition. As a result of that, a lot of C&D waste has been also produced. Nevertheless, it is not easy to find the research results for appropriate treatment and management of C&D waste in domestic. Therefore this study suggests the optimum deconstruction management system for minimizing construction waste and increasing reuse or recycle rate of material different from traditional demolition. The system makes it possible to plan and manage in advance quantity of C&D waste, demolition methods of each structural elements and application methods of produced C&D waste through an integrated and computerized system. The purpose of the system is ultimately to contribute to minimizing environmental damages and reducing construction waste quantity of a country. This system is largely composed of four modules such as planning of preliminary demolition survey, estimating of demolition quantity, planning of demolition schedule and planning of construction waste management and each module can be also used individually according to the purpose of a user.

Improvement Plan of Safety Educational System for Construction Demolition Works (건축물 해체공사의 안전교육시스템 개선방안)

  • Choi, Jong-Soo;Kim, Kyung-Hwan;Cha, Hun-Joo
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.5
    • /
    • pp.57-64
    • /
    • 2007
  • In the field of domestic construction demolition works, work process management system is left behind compared with that of several advanced countries such as US, Japan and UK. Especially, the problems regarding safety management are more serious in terms of the availability of safety manuals and law system. The analysis results fiom the questionnaire survey and interviews with demolition engineers indicated that current safety management practices in demolition works lack systematic approach and inappropriate in securing labors' safe working environment. In addition, field labors and managers strongly requested the improvement of safety educational system. Grounded upon the analyses results and investigations, suggestions were drawn for the establishment of advanced safety educational system.

A Study on the Method Applying Construction Wastes of Construction in Korea (국내 건설 폐기물 활용 현황 및 활성화에 관한 연구)

  • Jang, Jae-Moung;Choi, Hee-Bok;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.1
    • /
    • pp.147-154
    • /
    • 2003
  • Recently, the amount of the construction and demolition wastes has rapidly increased due to increasing construction projects. In the past, most of the construction and demolition wastes were buried in the ground of thrown away. Illegally, without any treatment, so various harmful environmental pollution problems were occurred. In this study, the domestic data on the amount of the construction and demolition wastes and the disposal methods were collection and analysed. Specially, the recycling and management systems of the construction and asphalt concrete wastes were studied. A new technology and necessary policy for recycling were suggested. In general, the industrial wastes were produced in the particular place, and the amount and the characteristics of the wastes able to be estimated by the studies on the treatment technology. And the investment of the facilities for the industrial wastes have been made continuously. But little attention has been relatively given to the treatment technology. And system for the construction and demolition wastes for the political support and facilitation on the proper treatment and the recycling, the necessary of information exchange system and the manifest system for treatment of waste on commission were recommended, and also devised methods to develope and support the recycling industry. In the future, the subject of study is going to carry out analysis of economic and market in making products.

Evaluation of Safety Items in Building Demolition Works Utilizing AHP Method (AHP 방법론에 의한 건축물 해체공사의 안전관리 개선사항 평가)

  • Cha, Hun-Ju;Choi, Jong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.3
    • /
    • pp.99-105
    • /
    • 2007
  • Current domestic safety training in building demolition works are heavily relies on the limited number of experienced people and thus, it implies the demand of preparing the systematic program and stricter yardstick is soaring. Questionnaire survey and in-depth interview results with demolition engineers were analyzed adopting AHP methodology. Analysis results reveal that the most urgent items which required improving current safety training system are to increase investment level, prepare more structured training system and secure experts, and so on. In addition, field labors and managers strongly requested the improvement of environment-related safety matters. Based on the evaluation results, guidelines were suggested for the improvement of safety training system in building demolition works.

Improvement Strategy for Demolition Industry through a Analysis of Domestic Demolition Technique and Situation (국내해체기술 및 현황분석을 통한 해체산업의 발전방향)

  • Kim, Chang-Hak;Kim, Hyo-Jin;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.2D
    • /
    • pp.143-151
    • /
    • 2010
  • Currently, one of the most interested things at home and abroad country will be an eco-friendly construction. Among these, one of the most important elements will be the recycle and reuse of construction and demolition waste. Because construction waste is generated the most at the demolition phase, it is important to minimize the quantity of the demolition waste at the phase. And it is also important to develop a system to manage rightly the generated demolition waste. But in the domestic country, a research for this has hardly been carried out. In recent, the government has realized its importance and is making a research to improve demolition technique and is preparing a research to make a raw for deconstruction. Therefore, this study examined its application situation and importance by analyzing the trend of demolition technique used in the domestic industry. Also this study carried out a survey for situation analysis of the demolition industry. This study suggested items needed for the development of demolition technique, demolition design and reduction of C&D waste through a survey results and a situation analysis.

Development of a waste recognition model at construction sites (건설현장에서 발생하는 폐기물 인식 모델 개발)

  • Na, Seunguk;Heo, Seokjae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.219-220
    • /
    • 2021
  • It is considered that the construction industry is one of the pivotal players in the national economy in terms of Gross Domestic Production (GDP) and employment. Behind the positive role of this industrial sector to the national economy, the construction industry generates approximately 50 % of the total waste generation from all the industrial sectors. There are several measures to mitigate the adverse impacts of the construction waste such as reduce, reuse and recycle. Recycling would be one of the effective strategies for waste minimisation, which would be able to reduce the demand upon new resources as well as enhance reusing the construction materials on sites. The automated construction waste classification system would make it possible not only to reduce the amount of labour input but also mitigate the possibility of errors during the manual classification process. In this study, we proposed an automated waste segmentation and classification system for recycling the construction and demolition waste in the real construction site context. Since the practical application to the real-world construction sites was one of the significant factors to develop the system, a YOLACT (You Only Look At CoefficienTs) algorithm was chosen to conduct the study. In this study, it is expected that the proposed system would make it possible to enhance the productivity as well as the cost efficiency by reducing the manpower for the construction and demolition waste management at the construction site.

  • PDF