• Title/Summary/Keyword: delivery-facility

Search Result 133, Processing Time 0.023 seconds

The Trend of CM at Risk in the U.S Construction Market (미국 CM at Risk 시장 동향 및 시사점)

  • Chang, Chul-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.67-73
    • /
    • 2006
  • Alternative project delivery methods including design-build and CM at Risk have evolved as a means of meeting owner's diverse needs and implementing project efficiently with limited budget and time in more competitive construction environment. It is time to consider adopting alternative project delivery methods, especially CM at Risk, for domestic construction industry to enhance competitiveness and to provide various options for owners so that they can select more appropriate project delivery methods for the facility being planned. This research report derives suggestions from investigating how CM at Risk has been evolved in the US construction market. Besides the analysis of CM at Risk market in the US construction industry, the characteristics of companies whose market share are in Top 100, the type of facility usually built by this method were investigated. Based on the analysis of CM at Risk in the US, the prepositions in adopting CM at Risk to domestic construction industry and the possibility of adopting this method have been identified.

  • PDF

Needs assessment for maternal health care in Ermera, Timor-Leste (동티모르 에르메라 지역의 모성보건사업 요구 분석)

  • Kim, Soo Jeong;Kim, Seong Min;Cho, Kyoung Won
    • The Journal of Korean Society for School & Community Health Education
    • /
    • v.20 no.2
    • /
    • pp.53-67
    • /
    • 2019
  • Objectives: The purpose of this study is to obtain the basic data for the development of maternal health care by analyzing the status and needs of service target persons in Timor-Leste. Methods: The subjects were selected through the non-probability sampling method applying the FGI. Researchers interviewed 3 maternal health service managers, 6 midwives at Gleno and Railaco Health Centers and 2 women between 15 and 45 years of age. Results: In the results of on-site visit of the delivery facility and the FGI, we found poor sanitation in delivery room, lack of medical equipment related to antenatal consultation and delivery. In the case of the health center manager, the public health center provides various maternity health services, but the lack of the staff has difficulty in providing the service and managing the subjects. Midwives asked for regular maintenance education. Women in child bearing age living in mountainous areas had poor access to delivery facilities and lack of awareness of delivery services. Conclusions: It is necessary to increase the maternity management rate through regular maternity and maternal health check service and application to maternal management database, to improve the sanitation of the maternity clinic in the public health center, to strengthen the midwife competency program.

Development of Project Delivery System for Modular Building in Korea

  • Nam, Sung-hoon;Kim, Kyung-rai;Lee, Dong-gun;Heo, So-young
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.704-705
    • /
    • 2015
  • Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.

  • PDF

Project Performance Comparison Based on Different Types of Project Delivery System (사례연구 분석을 통한 발주방식별 성과비교)

  • Lee, Soo-Kyong;Jung, Young-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.207-209
    • /
    • 2011
  • Numerous reports show that alternative project delivery systems (PDSs) such as design-build (DB), construction management at risk (CMR), and design-build-maintain (DBM) are increasingly used in many countries. This study compared characteristics of each PDS (design-bid-build (DBB), DB, CMR, or DBM) by analyzing quantitative data from 9 research articles. In order to compare characteristics between DBB and alternative PDSs, the study is based on principal 3 factors - Time, Cost, and Quality. DB shows the best performance in the time part and also the cost performance depending on facility type and project size. The performance of quality has minor difference among different PDSs. These results support the fact that using an appropriate PDS by the characteristic of a project makes high value of efficiency and productivity.

  • PDF

The global standard realizing process of the Tire Production Facility and Process Line

  • Suzuki, Takeshi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.28-29
    • /
    • 2015
  • The tire production facility is a large-scale construction with the complexity of a manufacturing process. The process utilities should be wide-ranging as an effective arrangement of them is highly important. All the necessary information should be clarified together with the manufacturer at the basic planning stage, and this design should be developed to comply with the local culture and regulations. It is important to carry out more advanced engineering in terms of process, cost and quality, even if it is difficult to standardize due to the cultural and geographical conditions and regulations. The key point is to reflect all the given conditions and make a clear design during the design stage, to eliminate the problems after the construction has begun. Another key point is the delivery system, which must be totally managed from the initial design stage until the construction stage by proven companies. Flexibility, quick action, and single responsibility will be the fundamental features in all the steps of the project.

  • PDF

A Simulation Analysis on the Assembly System of Mobile Bath Vehicles (이동식 목욕차량의 조립시스템에 대한 시뮬레이션 분석)

  • Chung, Hoyeon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.2
    • /
    • pp.93-101
    • /
    • 2021
  • The purpose of this study is to analyze the adequacy of production capacity of the assembly process system of mobile bath vehicle's top box panel and process design through a simulation analysis. Towards this end, the layout of the facility designed with pre-verification job using a simulation modeling and an experiment, and facility, logistics process, and personnel input method were made into a simulation model, and the design system's adequacy was evaluated through an experiment. To produce 120 mobile bath vehicles annually, it was analyzed that 14 general workers and seven skilled workers were adequate through the experiment. It was also identified that three painting process lines carried out through outsourcing were adequate. Production lead time was 201.7 hours on average and it was 230 hours maximum. To meet customer delivery service level of 95% within the deadline when establishing a customer order and vehicle delivery plan, it was analyzed that more than 215 hours of lead time is needed minimum. If the process cycle time is reduced to 85% upon system stabilization and skillfulness improvement, it was analyzed that annual output of 147 vehicles can be achieved without additional production line expansion.

Microbiological Assessment of Home-Delivered Meals for Children from Low-income Families during Production and Delivery (결식아동을 위한 가정배달 도시락의 생산과 배달과정 중 미생물적 평가)

  • Moon, Jeong-A;Yoo, Chang-Hee;Lee, Kyung-Eun
    • Journal of the Korean Dietetic Association
    • /
    • v.19 no.3
    • /
    • pp.236-252
    • /
    • 2013
  • The purpose of this study was to assess the microbiological quality of home-delivered meals during production and delivery for children from low-income families. Production flows from a facility in Seoul that provides home-delivered meals were analyzed and the time-temperature of the food was measured. Microbiological assessment was performed for the production environment, personal hygiene, and food samples at each production and delivery step based on the process approach. It took 2 hours or longer from completion of production to meal delivery. An aerobic colony count (ACC) and coliform were not detected at knives, cutting boards, and dish towels. However, ACC (at pre-preparation, preparation, and packing areas) and coliform (at the preparation area) were detected on the hands and gloves of employees. Air-borne bacterial counts varied according to day and preparation area (ND~6 CFU/plate/15 min). Food temperatures, on the completion of production and meal delivery, fell into temperature danger zones. ACC and coliform counts of raw ingredients did not decrease after pre-preparation (washing and sanitizing) for menus involving food preparation with no cook step. ACC decreased after cooking step for menus of food preparation with cook step, but the ACC of the stir-fried and seasoned dried filefish fillet on the completion of cooking was too numerous to count due to improper heating. The ACC of seasoned young Chinese cabbages (a menu with complex food preparation) increased during delivery (from 2.5 log CFU/ml to 5.0 log CFU/ml). This qualitative assessment of foodborne pathogens revealed that B. cereus was detected in vegetable and meat product menus. These results suggest time-temperature control is necessary during production and delivery and management guidelines during production of home-delivered meals are provided for safe production.

A Survey on Status of Pregnancy and Delivery at a Rural Village, Nepal(Dolakha Bazar Area) (네팔 돌카지역의 임신분만 환경)

  • Ahn, Young-Woo;Kang, Yune-Sik;Kam, Sin;Lee, Jong-Young
    • Journal of Preventive Medicine and Public Health
    • /
    • v.29 no.4 s.55
    • /
    • pp.721-732
    • /
    • 1996
  • This study was conducted to investigate the status of pregnancy and delivery and relationship among knowledge, attitude and practice about pregnancy and delivery in poor country, Nepal. A questionnaire survey by interviewer was conducted to examine the general characteristics, knowledge about pregnancy and delivery, attitude about pregnancy and delivery, the rate of prenatal care and delivery condition of women who had an experience of delivery during last year$(1994.4.13\sim1995.4.12)$ at a rural area, nepal(Dolakha Bazar Area). The major findings are as follows ; Among respondents, 87.5 percentage never had health education and the degree of knowledge about pregnancy and delivery was low. Among respondents, 56.6 percentage had the attitude that they didn't want antenatal care, 42.8 % of respondents answered that they wouldn't visit hospital or health center when vaginal bleeding occurred and 82.9% thought that the delivery itself was dirty. The proportion of women who experienced antenatal care was 28.3%, the proportion of health facilities delivery was 5.3%, which was very low and 82.6% of home delivery case didn't sanitate the tool to cut the umbilical cord. The women who had positive attitude about antenatal care and health facility utilization experienced more antenatal care and health facilities delivery. On consideration of above findings, health education for pregnancy and delivery is required to improve mother-child health status in poor country. To make efficient health education, the target population group, such as the uneducated, inhabitants far from health center or medical facility, must be chosen. To help the poor countries in medical field, the study on health status and its related factors on these countries like this article would be required.

  • PDF

Congestion Management with Arrival Estimation of Unit Loads in an Automated Material Handling System (운송시간의 예측을 통한 물류정체 통제 모형)

  • Chung, Jae-Woo;Hur, Yeon-Ho
    • Korean Management Science Review
    • /
    • v.29 no.1
    • /
    • pp.131-141
    • /
    • 2012
  • The automated material handling systems today are playing ever more important roles in semiconductor/LCD fabrication facilities. Recently they became more flexible, intelligent, and speedy than in the past. The facilities have been fully automated because the size and weight of the unit loads used in the facilities were being increased beyond the limits that a human operator can handle. This research develops an efficient procedure to streamline the delivery of unit loads by the automated material handling system (AMHS). For this task, the research employs the event scheduling theory that has been successfully used in the both academia and industry. The developed procedure was applied to an actual LCD fabrication facility and improved the performance of an existing material handling system.

A Study on the Optimal Investment Method for Distribution Systems Interconnected with Dispersed Generations (분산전원이 연계된 배전계통의 최적 설비투자 방안에 관한 연구)

  • Rho, Dae-Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.12
    • /
    • pp.2179-2185
    • /
    • 2008
  • This paper deals with the optimal investment method for distribution facilities, based on the analytical approach for the reliability assessment in distribution systems interconnected with new dispersed generations. The existing approach can estimate the expected reliability performance of distribution systems by a direct assessment of the configuration of the systems using the reliability indexes such as NDP(Non-Delivery Power) and NDE(Non-Delivery Energy). The indexes can only consider the number and configuration of the load, but can not consider the characteristics of the load which is the one of the most important factor in the investment cost for the distribution systems. Therefore, this paper presents the new performance indexes for the investment of the distribution facilities considering both the expected interruption cost for the load section and the operation characteristics of dispersed generations. The results from a case study show that the proposed methods can be a practical tool for the voltage management in distribution systems including dispersed sources.