• Title/Summary/Keyword: defence project

Search Result 36, Processing Time 0.028 seconds

A Scheme of the defence project analysis and evaluation using a systems engineering process (시스템 엔지니어링 프로세스를 적용한 사전/사후분석 방안)

  • Min, Seong-Gi;Gwon, Yong-Su;Lee, Im-Su
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.32-39
    • /
    • 2003
  • This work describes a study of analysis and evaluation activities applied systems engineering approach. It is presented technique of derivation and management requirement. A scheme of the defence project analysis and evaluation using a systems engineering process is described.

  • PDF

A Study on the Definition Method for Integrated Development Project using QFD (QFD를 활용한 통합된 개발프로젝트 정의 방법 연구)

  • Kim, Jin Hoon;Park, Young Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.1
    • /
    • pp.63-75
    • /
    • 2012
  • For the definition of development project, this paper proposes an integrated design model for the project 3P's(Products, Process, and People) architecture solutions balancing the originating requirements as well as the design targets of product, process, and IPDT. The model is suggested to develop the integrated design method with trade-off analysis and alternatives evaluation of products, processes, and IPDT using QFD.

A Study on the Risk Management of Core Technology R&D Project using Degree of Difficulty and Technology Readiness Level (기술난이도와 기술성숙도를 이용한 핵심기술 연구개발 위험도 관리에 관한 연구)

  • Lee, Taehyung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.19 no.6
    • /
    • pp.789-796
    • /
    • 2016
  • In the Core Technology R&D of the defence area, the development of the related core element technology could be the foundation to develop advanced weapon system in the future. But it might make various problems if you can not accurately define the TRL of the element technology. In other words, if the technology is not sufficiently mature and then the project starts, it might require an increase in the development period and additional cost. Finally the system will be in an incomplete state and result in user dissatisfaction and the project failure. Therefore it is a very important task to properly assess the TRL for a successful project. In this study, We propose the method for risk management of core technology R&D project of the defence area using the QFD process with degree of difficulty and technology readiness level. It is also presented the process to determine the risk level using TRL and Degree of difficulty. Finally We apply this method to UGV system for verifying the result of this study.

A Study on Measurement of Gun's Attitude of K2 MBT Using Inertial Navigation System and Its Effects on the Hit Probability (관성항법장치를 이용한 K2전차 전차포 자세측정 방법 및 명중률에 미치는 영향에 대한 연구)

  • Kim, Sungho;Kim, GunKook;Kwon, Hyukmin;Yu, Sukjin;Park, Byunghoon;Lee, Byunggil;Kim, Euiwhan
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.19 no.2
    • /
    • pp.218-226
    • /
    • 2016
  • In the original design of K2 tank the Vertical Sensor Unit(VSU) was mounted to measure the attitude of the main gun to enhance the hit probability. In this research, as a part of efforts to reduce the cost of K2, it was theoretically simulated and evaluated to use the data from Inertial Navigation System(INS) for the calculation of the gun attitude instead of the direct measurement using VSU. It was found that the negative effect of INS approach is negligible and the elimination of VSU is technically possible and beneficial to the system.

Methodologies to Decide the Number of Samples and to Verify an Accuracy Rate of the Precise Guided Missiles for Test and Evaluation (정밀유도무기 시험평가 수량 결정 및 명중률 검증 방법론)

  • Lee, Moon-gul;Hwang, Seung-hoon;Baek, Seung-Ryoung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.18 no.5
    • /
    • pp.558-565
    • /
    • 2015
  • The current methods, such as Binomial Probability Distribution or T-test, to calculate the number of samples of Precise Guided Missiles(PGMs) for test and evaluation are statistically problematic to make reasonable decisions thus use the budget efficiently. Also, the method to verify an accuracy rate of the PGMs using these old methods seems to be lack of objectiveness. This paper presents an effective, efficient solution adapted from the clinical medicine testing method of healthcare industry research, which may overcome our problems. This method considers and addresses both manufacturers' and consumers' risk simultaneously. By taking into account the weapon system project characteristics which take a relatively longer time and require higher-level budget, this approach also suggests a reasonable and feasible method to determine the amount of samples of the PGMs and making a criterion to verify an accuracy rate of the missiles that are required to test. Thus, this method is expected to contribute to acquisition and operations of high-reliability PGMs by MND and its field-users.

A Systems Engineering Case Study to Improve Defence R&D Program Effectiveness (국방 R&D사업 시스템엔지니어링 적용사례 및 발전방안 연구 - 저고도레이더 업체주관 연구개발사업 사례 중심으로 -)

  • Park, Kyeong-Il;Pyun, Wan-Joo;Park, Young-Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.4 no.2
    • /
    • pp.35-43
    • /
    • 2008
  • Application of system engineering should be realized on necessary condition being to propel National Defense R&D Program. But, these necessity is yet not realized easily to many project managers of Defense Acquisition Program Administration(DAPA). As one person of DAPA project manager, system engineering hard to approaches easily by the word itself. There are a lot of difficult sections where should apply how. This paper established DAPA Project Manager and Acquisition Point of Contact of demand Military by main customer (reader), and wished to make understood more easily and approach system engineering application to these. Also, this paper studied project management example that scientific project management techniques of Earned Value Management(EVM) and Cost As an Independent Variable(CAIV) etc. is taken abuzz in DAPA inside by Project management technique that become reform, arc Integrated in system engineering.

  • PDF

The Development Option for Korea Air Defense Identification Zone(KADIZ) (한국방공식별구역(KADIZ) 발전방안)

  • Kim, Dongsoo;Hong, Sungpyo;Chong, Mangseok
    • Journal of Aerospace System Engineering
    • /
    • v.10 no.1
    • /
    • pp.127-132
    • /
    • 2016
  • Recently, China & Japan have expanded their responding ADIZ(Air Defence Identification Zone) to implement each Government's maritime policy and to project their Air Power in preparation for maritime provocation & contingency, especially over the piled area where East Asia countries have claimed to have maritime jurisdiction one another. So this is to guide the Development Option for Korea Air Defence Identification Zone to cope with the maritime intentions of the neighboring countries, considering the international law for ADIZ, the maritime policy and the maritime sovereign & jurisdiction area of the Republic of Korea, etc.

Embedded Software Development Process and Systematic Technical Information Management (내장형 소프트웨어 개발 프로세스와 기술자료 관리)

  • Jeong, Chang-Min;Pyun, Jai-Jeong
    • Journal of Information Technology Services
    • /
    • v.2 no.1
    • /
    • pp.135-143
    • /
    • 2003
  • As the functional and nonfunctional requirements of defence systems become more complex and precise, concerning about the systematic development of software embedded into the defence systems has become surged up. In order to develop more reliable and correct software, and to extend the life cycle of the developing software, adoption of some engineering technologies such as development process, methodology, CASE tools and documentation is essentially required. This paper introduce an approach to technical information management in embedded software development process, with an instance, airborne ECM system development project. Particularly, we suggest and explain how to guide the software development according to process and methodology, and how to generate technical documents using CASE tool.

The Cost Monitoring of Construction Projects through Earned Value Analysis

  • Waris, Muhammad;Khamidi, Mohd Faris;Idrus, Arazi
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.4
    • /
    • pp.42-45
    • /
    • 2012
  • In construction industry, the term 'procurement' is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators such as cost monitoring is an ongoing process and its importance cannot be undermined during the project life cycle. It can be monitored by using traditional approach of direct reporting of actual cost against budget. However, the comparison of budget versus actual spending does not indicate the worth of the work which is completed at any given time. This approach does not represent the true cost performance of the project. Because of these limitations, this paper discusses the applications of Earned Value Analysis (EVA) for cost monitoring of construction projects in Malaysia. Besides traditional approach, EVA is a three-dimensional approach that compares three cost indicators i.e. the budgeted value of work scheduled with the earned value of physical work completed and the actual cost of work completed. Therefore, cost monitoring by EVA is an objective measure of actual work performed. This paper uses a case study, an example application of EVA as a cost monitoring tool. This case study reaffirms the benefits of using EVA for project cash flow analysis and forecasting.