• Title/Summary/Keyword: defect management

Search Result 633, Processing Time 0.036 seconds

Comparative Review on Term of Warranty Liability of Reinforced Concrete Work through Occurred Defect Data Analysis in Apartment Building (공동주택 하자실적자료 분석을 통한 철근콘크리트 공사의 하자담보책임기간 비교연구)

  • Seo, Deok-Seok;Park, Jun-Mo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.266-267
    • /
    • 2017
  • As apartment buildings defect lawsuits become socioeconomic problems, an objective basis system for the term of warranty liability of reinforced concrete constructions is urgent. This study was carried out as a basic study for developing a basis system for the term of warranty liability. To do this, defect data actual collected in apartment complexes were collected and analyzed. As the result of checking the cumulative rate of defect occurrence in reinforced concrete construction by year, the point of time of reaching the 90% level was the 5th years, which was similar with the provision of the Apartment Building Management Act. However, the current Supreme Court precedent has decided that the term of warranty liability for the main structural parts in reinforced concrete construction shall be 10 years and the dispute is expected to continue in the future in the defect lawsuit.

  • PDF

Analysis of Defect Risk by Work Types based on Warranty Liability Period in Apartments (공동주택 하자보수보증기간에 기초한 공종별 하자위험 분석)

  • Kim, Sang-Hyeon;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.34-42
    • /
    • 2018
  • Apartment is a typical type of housing preferred by the majority of people. However, and defect disputes occur because various defects such as cracks, subsidence, breakage, water leakage, dew condensation and dropout are confirmed with numerous structures and finishing materials. From this point of view, this paper analyzes defect frequency and costs of each warranty period by work types, and estimates defect risks by using defect dispute cases. It examined about 5,337 defect items for 32 apartment over ten years old. In this paper, there are 10 types of work types and the warranty liability period is divided into 6 categories. Based on these categories, defect frequency and costs are investigated, and finally defect risk of the warranty liability period by work types confirmed. As a result of this analysis, it was found that defect risk in RC and finishing work is very high. Especially the RC work revealed that there is a high risk of trying from the third year onwards and it was found that the defect risk up to the second year is high in the finishing work. Due to aging of RC structure, the defect risk gradually increases, and finishing work initially cause defect disputes because of the housing environment.

A Study on Software Fault Analysis and Management Method using Defect Tracking System (결함 추적 시스템에 의한 소프트웨어 결함 분석 및 관리기법 연구)

  • Joon, Moon-Young;Yul, Rhew-Sung
    • The KIPS Transactions:PartD
    • /
    • v.15D no.3
    • /
    • pp.321-326
    • /
    • 2008
  • The software defects that are not found in the course of a project frequently appear during the conduct of the maintenance procedure after the complete development of the software. As the frequency of surfacing of defects during the maintenance procedure increases, the cost likewise increases, and the quality and customer reliability decreases. The defect rate will go down only if cause analysis and process improvement are constantly performed. This study embodies the defect tracking system (DTS) by considering the Pareto principle: that most defects are repetitions of defects that have previously occurred. Based on the records of previously occurring defects found during the conduct of a maintenance procedure, DTS tracks the causes of the software defects and provides the developer, operator, and maintenance engineer with the basic data for the improvement of the software concerned so that the defect will no longer be manifested or repeated. The basic function of DTS is to analyze the defect type, provide the measurement index for it, and aggregate the program defect type. Doing these will pave the way for the full correction of all the defects of a software as it will enable the defect correction team to check the measured defect type. When DTS was applied in the software configuration management system of the W company, around 65% of all its software defects were corrected.

A Study on Extraction of Defect Causal Variables for Defect Management in Financial Information System (금융정보시스템의 장애관리를 위한 장애요인변수 추출에 관한 연구)

  • Kang, Tae-Hong;Rhew, Sung-Yul
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.2 no.6
    • /
    • pp.369-376
    • /
    • 2013
  • Finance Information System is critical national infrastructure. Therefore it is important to select variables of defect causal factor for the system defect management effectively. We research and analyze detected errors in A Company's Finance Information System for three years. In the result of research and analysis, we have selected 9 variables of defect factor: the trading volume, the fluctuation of KOSDAQ index, and the number of public announcements, etc. Then we have assumed that these variables affect real system errors and analyzed correlation between the hypothesis and the detected system errors. After analyzing, we have extracted the trading volume, the number of orders and fills, changing tasks, and the fluctuations of NASDAQ index as valid variables of defect factor. These variables are proposed for failure prediction model as the variables to manage defects in the finance information system afterward.

Urethroplasty of Urethral Defect with Longitudinal Tubed Flap of Scrotal Skin after Fournier's Gangrene (Necrotizing Fascitis) (회음부 괴사성 근막염후 발생한 요도 결손의 치료를 위한 음낭피부 종축관피판을 이용한 요도성형술)

  • Min, Hee-Joon;Roh, Tai-Suk;Kim, Ji-Ye;Kim, Sug-Won
    • Archives of Plastic Surgery
    • /
    • v.37 no.5
    • /
    • pp.667-670
    • /
    • 2010
  • Purpose: The management of urethral defect represents one of the most challenging clinical problems in uroplastic surgery. Especially for defect after Fournier's Gangrene, optimal management is still a hard problem. During extensive urethral reconstruction, to overcome the poor vascularity due to periurethral scarred tissue and limitation of the choice of local flap, we report our experience with one-stage reconstruction of urethral defect using a longitudinal tubed flap of scrotal skin. Methods: A 72-year-old man with several years of diabetes mellitus history visited for swelling and pain of scrotal area. After diagnosis of Fournier's Gangrene, radical debridement was performed and 6 cm of urethral defect on border of penile-scrotal ventral area was made. Rectangular scrotal skin flap ($6{\times}2.5\;cm$) based on external spermatic fascia was elevated and tubed longitudinally. After transfer the flap to the defect area, end-to-end anastomosis was performed bilaterally. Results: 4 weeks after the operation, the patient started voiding him-self and urethrography showed good fluence of contrast agent. Long term evaluation reveals stable performance characteristics without any complications. Conclusion: We suggest a one-stage reconstruction of extensive urethral defect using a longitudinal tubed flap of scrotal skin. Advantages of this procedures are simple, one-stage reconstruction with the reliable scrotal skin flap based on external spermatic fascial vasculature, and no donor morbidity.

A Study on the Defect Causes Type for Poly-Urethane Waterproofing in Roof (옥상 방수에 있어서 폴리우레탄 도막방수의 하자발생 유형에 관한 연구)

  • Shin, Hyung-John
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.128-134
    • /
    • 2005
  • Up to now, the various water proofing methods and materials have been developed. For the water proofing methods, poly-urethane membrane method is one of the commonly used and increase market share in water proofing industry due to it's many advantages. However, in spite of it's many advantages over other water proofing methods, water proofing defect occurs frequently. With this respect, the study investigate water proofing defect causes in roof water proofing. The study investigate 13 water proofing construction site in Sunchon city in oder to find urethane membrane defection causes and their type. As a results of the study, the followings are founded. 1) Among various water proofing defection causes, problems of water remain phenomenon due to surface horizontal level defect which occupy $25\;\%$ of total defect causes is the most commonly occur. 2) The second defect cause which occupy $15\;\%$ of total defect causes is the swell up phenomenon due to surface dry problem. For the prevention of water proofing defection in roof using urethane membrane, the followings are recommended. 1) Faultless surface treatment before using urethane membrane 2) Develop improved urethane membrane material 3) Improve urethane membrane construction technique

Assessment of Defect Risks in Apartment Projects based on the Defect Classification Framework (공동주택 하자분류체계 기반 하자위험 평가)

  • Jang, Ho-Myun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • In general, defects cause a lot of maintenance costs and serious damage to various stakeholders, such as the owners, contractors or occupants of apartments. For this reason, a systematic and efficient defect management method is needed to minimize defect disputes. This paper derives a defect classification framework and proposes a defect risk assessment model for different types of defects. For this purpose, 6,000 defect items are allocated to the defect classification framework; these items are associated with 34 apartment projects over ten years old. As a result of this analysis, it was confirmed that the defect risks are concentrated in the areas of RC and finishing work. Based on these results, it is necessary to prevent the major risks of defects according to their priority. Based on this research, it is judged that further research to develop a method of managing the risks of defects may be necessary.

Pipeline defect detection with depth identification using PZT array and time-reversal method

  • Yang Xu;Mingzhang Luo;Guofeng Du
    • Smart Structures and Systems
    • /
    • v.32 no.4
    • /
    • pp.253-266
    • /
    • 2023
  • The time-reversal method is employed to improve the ability of pipeline defect detection, and a new approach of identifying the pipeline defect depth is proposed in this research. When the L(0,2) mode ultrasonic guided wave excited through a lead zirconate titinate (PZT) transduce array propagates along the pipeline with a defect, it will interact with the defect and be partially converted to flexural F(n, m) modes and longitudinal L(0,1) mode. Using a receiving PZT array attached axisymmetrically around the pipeline, the L(0,2) reflection signal as well as the mode conversion signals at the defect are obtained. An appropriate rectangle window is used to intercept the L(0,2) reflection signal and the mode conversion signals from the obtained direct detection signals. The intercepted signals are time reversed and re-excited in the pipeline again, result in the guided wave energy focusing on the pipeline defect, the L(0,2) reflection and the L(0,1) mode conversion signals being enhanced to a higher level, especially for the small defect in the early crack stage. Besides the L(0,2) reflection signal, the L(0,1) mode conversion signal also contains useful pipeline defect information. It is possible to identify the pipeline defect depth by monitoring the variation trend of L(0,2) and L(0,1) reflection coefficients. The finite element method (FEM) simulation and experiment results are given in the paper, the enhancement of pipeline defect reflection signals by time-reversal method is obvious, and the way to identify pipeline defect depth is demonstrated to be effective.

A Proposal for Improvement and Current Situation of Risk Management on Financial Information System (금융정보시스템 위험관리의 현황 및 개선을 위한 제언)

  • Kang, TaeHong;Rhew, SungYul
    • Information Systems Review
    • /
    • v.14 no.2
    • /
    • pp.103-115
    • /
    • 2012
  • Improvement of the capability to cope with risk based on prior preventive management is very important for efficient operation of financial information system. In order to do this, understanding, analysis, and countermeasures for the risk that happened already in the past is essential. In this study, the defect data which happened in the financial information system including account system, business system and data feeding system during 4 years and 5 months were categorized and analyzed by the domain, defect factors, period, day of the week, phases of software development, and defect cause. As a result, it was identified that the defect data had characteristics and trends along the phase of software development, day of the week, and the cause, also that building risk prediction model was necessary for the risk management of whole financial domain due to the relation of the information systems.

  • PDF

Selection of Tree History Management System Items for Analyzing the Causes of Landscape Tree Defects in an Apartment Complex

  • Park, Sang Wook
    • Journal of People, Plants, and Environment
    • /
    • v.23 no.3
    • /
    • pp.347-362
    • /
    • 2020
  • Background and objective: It is difficult to conclusively determine the exact cause of tree defects since multiple causes are involved such as climate change, plantation, tree quality and planting time, construction, planting base, drainage, sunshine conditions, maintenance, and microclimate. The data related to landscaping construction defects are scattered or fragmented by companies and years, but not managed systematically by the defect information management system. Most of the earlier studies associated with tree defects in apartment complexes suggested defect rates after examining tree defects in the completed construction site and proposed fragmentary and subjective conclusions about the causes of defects observed in trees with high defect rates. It is proposed to continue to conduct studies on the establishment and analysis of systematic databases to identify the exact causes of tree defects and measures to improve, and the need to accumulate systematic data in the construction process where many defects arises. This study was conducted to reduce the defects of trees planted in apartment complexes. Methods: Main factors related to tree defects were subdivided based on the results of literature review and a defect investigation at the completion site, and tree history management items were selected and subdivided during the construction stage. Results: The criteria for the preparation of subdivided items were obtained, and the tree history management checklist was written for the site under actual construction and a systematic database was established. Items that are categorized based to the causes of defects include the location of nurseries, date, tree quality, site conditions, planting techniques, microclimates, and maintenance. Conclusion: This study suggested tree history management items based on the tree defects that can be identified at the construction stage and applied them to the selected study site, which differentiates this study from earlier studies. It will be necessary to conduct a comprehensive and objective time series analysis on tree defects that occur over time by continuously monitoring and collecting data after construction.