• Title/Summary/Keyword: decision making speed

Search Result 170, Processing Time 0.025 seconds

An algorithm of detecting changed intervals with step-type shape in motor's speed response data (모터 스텝 응답에서 변동 구간 검출 기법)

  • Kim, Tae-Eun;Lee, Hai-Young
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.11a
    • /
    • pp.309-313
    • /
    • 2004
  • This paper presents an algorithm of detecting changed intervals with step-type shape in motor's speed response data. The proposed method is composed of 4 parts such as noise filtering, decision making of reference value's change, finding entrance point of steady state and detecting changed intervals. According to simulation results for three cases, we see that changed intervals can be found well.

  • PDF

Using real time data with rigorous models to optimize plant performance

  • Clemmons, Josh
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1989.10a
    • /
    • pp.828-834
    • /
    • 1989
  • On-Line optimization of process units has heretofore been restricted to the individual equipment level using linear approximate models. The advent of the low cost, high speed micro-computer coupled with the speed and robustness of an equation based exact simulator is making real-time optimization of entire process units a reality. The resultant implications for a decision system applied to day-to-day operations, point to a significant change in the way process plants will be managed in the future.

  • PDF

Utilization of Planned Routes and Dead Reckoning Positions to Improve Situation Awareness at Sea

  • Kim, Joo-Sung;Jeong, Jung Sik;Park, Gyei-Kark
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • v.14 no.4
    • /
    • pp.288-294
    • /
    • 2014
  • Understanding a ship's present position has been one of the most important tasks during a ship's voyage, in both ancient and modern times. Particularly, a ship's dead reckoning (DR) has been used for predicting traffic situations and collision avoidance actions. However, the current system that uses the traditional method of calculating DR employs the received position and speed data only. Therefore, it is not applicable for predicting navigation within the harbor limits, owing to the frequent changes in the ship's course and speed in this region. In this study, planned routes were applied for improving the reliability of the proposed system and predicting the traffic patterns in advance. The proposed method of determining the dead reckoning position (DRP) uses not only the ships' received data but also the navigational patterns and tracking data in harbor limits. The Mercator sailing formulas were used for calculating the ships' DRPs and planned routes. The data on the traffic patterns were collected from the automatic identification system and analyzed using MATLAB. Two randomly chosen ships were analyzed for simulating their tracks and comparing the DR method during the timeframes of the ships' movement. The proposed method of calculating DR, combined with the information on planned routes and DRPs, is expected to contribute towards improving the decision-making abilities of operators.

Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF

A Study on the High-Speed Railway Safety Evaluation using the F-AHP

  • Park, Tae-Keun;Park, Choon-Soo;Seo, Seung-Il
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.05a
    • /
    • pp.581-585
    • /
    • 2004
  • The purpose of this study is to suggest a method to support decision making of researchers, when we estimate the safety of the high-speed railway using F-AHP. To apply this method, Korean type of high-speed railway was engaged, and the 8 Stages of accident type and the five criteria were suggested that we must meet. Then, the interview with the researchers working for high-speed railway was used to confirm the alternatives suggested. The employed F-AHP for this study estimate using emotional words based on AHP of Saaty, so it is very good to estimate the high-speed railway safety.

  • PDF

On the Ship's Berthig Control by introducing the Fuzzy Neural Network (선박 접이안의 퍼지학습제어)

  • 구자윤;이철영
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1994.04a
    • /
    • pp.55-67
    • /
    • 1994
  • Studies on the ship's automatic navigation & berthing control have been continued by way of solving the ship's mathematical model but the results of such studies have not reached to our satisfactory level due to its non-linear characteristics ar low speed. In this paper the authors propose a new berthing control system which can evaluate as closely as captain's decision-making by using the FNN(Fuzzy Neural Network) controller which can simulate captain's decision-making by using the FNN(Fuzzy neural Network) controller which can simulate captain's knowledge. This berthing controller consists of the navigation subsystem FNN controller and the berthing subsystem FNN controller. The learning data are drawn from Ship Handling Simulator (NavSim NMS90 MK III) and represent the ship motion characteristics internally According to learning procedure both FNN controllers can tune membership functions and identify fuzzy control rules automatically The verified results show the FNN controllers effective to incorporate captain's knowledge and experience of berthing.

  • PDF

Network Selection Algorithm for Heterogeneous Wireless Networks Based on Multi-Objective Discrete Particle Swarm Optimization

  • Zhang, Wenzhu;Kwak, Kyung-Sup;Feng, Chengxiao
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.6 no.7
    • /
    • pp.1802-1814
    • /
    • 2012
  • In order to guide users to select the most optimal access network in heterogeneous wireless networks, a network selection algorithm is proposed which is designed based on multi-objective discrete particle swarm optimization (Multi-Objective Discrete Particle Swarm Optimization, MODPSO). The proposed algorithm keeps fast convergence speed and strong adaptability features of the particle swarm optimization. In addition, it updates an elite set to achieve multi-objective decision-making. Meanwhile, a mutation operator is adopted to make the algorithm converge to the global optimal. Simulation results show that compared to the single-objective algorithm, the proposed algorithm can obtain the optimal combination performance and take into account both the network state and the user preferences.

Data Mining and Artificial Intelligence Approach for Intelligent Transportation System (ITS를 위한 데이터 마이닝과 인공지능 기법 연구)

  • Sam, Kaung Myat;Rhee, Kyung-Hyune
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2014.11a
    • /
    • pp.894-897
    • /
    • 2014
  • The speed of processes and the extremely large amount of data to be used in Intelligence Transportations System (ITS) cannot be handling by humans without considerable automation. However, it is difficult to develop software with conventional fixed algorithms (hard-wired logic on decision making level) for effectively manipulate dynamically evolving real time transportation environment. This situation can be resolved by applying methods of artificial intelligence and data mining that provide flexibility and learning capability. This paper presents a brief introduction of data mining and artificial intelligence (AI) applications in Intelligence Transportation System (ITS), analyzing the prospects of enhancing the capabilities by means of knowledge discovery and accumulating intelligence to support in decision making.

An Interactive Decision Support System for Truck Dispatching (배차계획을 위한 대화형 의사결정지원시스템)

  • Park, Yang-Byung;Hong, Sung-Chul
    • Korean Management Science Review
    • /
    • v.15 no.2
    • /
    • pp.201-210
    • /
    • 1998
  • Truck dispatching is one of the most commonly occurring problems of transprot management. We developed an interactive decision support system named IDSSTD, for the truck dispatching problem where two conflicting objectives are treated and travel speed varies depending on the passing areas and time of day. The IDSSTD aids the decision-making process by allowing the user to interact directly with the database, to direct data to a decision model, and to portray results in a convenient form. The IDSSTD is consisted of two major interactive phases. The pre-scheduling interactive phase is to reduce the complexity of a given problem before applying the BC-saving heuristic algorithm and the post-scheduling interactive phase is to improve practically the algorithmic solution. The IDSSTD has the capabilities of its own manipulation(analysis and recommendation) and diverse graphic features in order to facilitate a user's interaction.

  • PDF

Monitoring concrete bridge decks using infrared thermography with high speed vehicles

  • Hiasa, Shuhei;Catbas, F. Necati;Matsumoto, Masato;Mitani, Koji
    • Structural Monitoring and Maintenance
    • /
    • v.3 no.3
    • /
    • pp.277-296
    • /
    • 2016
  • There is a need for rapid and objective assessment of concrete bridge decks for maintenance decision making. Infrared Thermography (IRT) has great potential to identify deck delaminations more objectively than routine visual inspections or chain drag tests. In addition, it is possible to collect reliable data rapidly with appropriate IRT cameras attached to vehicles and the data are analyzed effectively. This research compares three infrared cameras with different specifications at different times and speeds for data collection, and explores several factors affecting the utilization of IRT in regards to subsurface damage detection in concrete structures, specifically when the IRT is utilized for high-speed bridge deck inspection at normal driving speeds. These results show that IRT can detect up to 2.54 cm delamination from the concrete surface at any time period. It is observed that nighttime would be the most suitable time frame with less false detections and interferences from the sunlight and less adverse effect due to direct sunlight, making more "noise" for the IRT results. This study also revealed two important factors of camera specifications for high-speed inspection by IRT as shorter integration time and higher pixel resolution.