Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. The domestic system of standard safety management costs is not considered in the foreign country, while only related subjective items have been investigated and evaluated for this study. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basial data and material to be systemized.
Proceedings of the Korean Geotechical Society Conference
/
1991.10a
/
pp.34-46
/
1991
The slope stabi1ity analyses for Carsington dam were performed by using the computer program STABL and PC-SLOPE. The slip surface predicted by STABL can differ from the true slip surface. This is due to the characteristics of searching technique of the program STABL. Hence various possible potential slip surfaces must be examined using the program STABL. Various methods of analysis are employed in the program PC-SLOPE. A resonable factor of safety can be obtained by comparing the various values, and the potential slip surface can be predicted well relatively. The shear strength parameters of ctitical or residual state must be investigated as well as the peak strength for the case of the Carsington dam, where the deformation took place over long periods.
Proceedings of the Korean Geotechical Society Conference
/
1991.10a
/
pp.25-33
/
1991
The slope stability analysis of Carsington dam is performed, considering the effects of pore water pressure, slip surface configuration, lateral stress and various shear strengths. Without yellow clay layer, the Bowles' and STABR programs were used to find the circular slip surface which has the maximum safety factor. At last using the Morgenstern-Price method, the effects of rainfall and strength of yellow clay were mainly considered in the back analyses after failure. It was found that (1) the potential slip was not predicted in the analysis based on the modified Bishop method without considering the yellow clay layer, and (2) the crllapse of dam had been occurred according to the critical shear strength of the yellow clay and pore water pressure increase.
Proceedings of the Korean Nuclear Society Conference
/
1996.05b
/
pp.657-662
/
1996
Venting capability to prevent excess pressurization caused by loss of Residual Heat Removal System (RHRS) during mid-loop operation hat been evaluated analytically and the peak Reactor Coolant System (RCS) pressure was compared with the results of the MIDLOOP computer code. Even though analytical method if relatively simple, the results are in a good agreement with those of the computer code. For both methods, the peak pressures have not, exceeded the nozzle dam design pressure, if the vent paths such as pressurizer safety valves or a pressurizer manway are available in a closed RCS configuration with the nozzle dam installed.
Proceedings of the Computational Structural Engineering Institute Conference
/
2003.04a
/
pp.103-110
/
2003
A hybrid structural reliability analysis method that integrates a commercial finite element program and a reliability analysis algorithm is proposed to estimate the safety of real structures in this paper. Since finite element method (FEM) is most commonly and widely used in the analysis and design practice of real structures, it appears to be necessary to use general FEM program in the structural reliability analysis. In this case, simple conventional reliability methods cannot be used because the limit state function can only be expressed in an algorithmic form. The response surface method(RSM)-based reliability algorithm with the first-order reliability method (FORM) found to be ideal in this respect and is used in this paper. The intention of use of RSM is to develop, albeit approximately, an explicit expression of the limit state function for real structures. The applicability of the proposed method to real structures is examined with help of the example in consideration of a concrete dam. Both the strength and serviceability limit states are considered in this example.
Of the Korean military's 3,959 ammunition depots, 1,007 - more than 25% - violate safety requirements for distance and equipment. There is a risk of explosion in old depots that are vulnerable to various interior and exterior accidents. This paper examines 10 scenarios, with varying values for ammunition amount and safety distance. The study calculated the overpressure that can be applied to risk-exposure objects, based on the safety distance; expected damage was predicted using constructed spatial information from 3D explosion simulations. The simulations confirmed that explosion overpressure increased the most when the safety distance violation rate increased from 80% to 90%. It also confirmed that secondary damage such as fire and explosion can cause casualties and property damage when the violation rate is 60% or higher. The results show that building collapse becomes a risk with a violation rate of 70% or higher. We conclude that taking ammunition depot safety distance violation into account when planning military facilities and their land utilization could better protect life and property.
A accurate reservoir inflow is very important as providing information for decision making about the water balance and the flood control, as well as for dam safety. The methods to calculate the inflow were divided by the directed method to measure streamflow from upstream reservoirs and the indirected method to estimate using the correlation of reservoir water level and release. Currently, the inflow of multi-purpose dam is being calculated by the indirect method and the reservoir water level to calculate the storage capacity is being used by centimeters(cm) units. Corresponding to the storage volume of 1cm according to scale and water level of multi-purpose dam comes up to from several 10 thousand tons to several million tons. If it converts to inflow during 1 hour, and it comes to several hundred $m^3/sec$(CMS). Therefore, the inflow calculated on the hourly is largely deviated along the water level changes and is occurred minus value as the case. In this research, the water level gage has been developed so that it can measure a accurate water level for the improvement for the error and derivation of inflow, even though there might be various hydrology and meteorologic considerations to analyse the water balance of reservoir. Also, it is confirmed that the error and the standard derivation of data observed by the new gage is decreased by 89,6% and 1/3 & 87% and 2/3 compared to that observed by the existing gage of Daecheong and Juam multi-purpose dam.
Ha, Ik Soo;Lee, Soo Gwun;Lim, Jeong Yeul;Jung, Young Hoon
KSCE Journal of Civil and Environmental Engineering Research
/
v.36
no.3
/
pp.451-461
/
2016
The objective of this study is to illustrate the methods and procedures for estimating the failure probability of small fill dams subjected to earthquake events and to estimate the seismic failure probability of the Korean disaster risk fill dams where geotechnical information is not available. In this study, first of all, seismic failure probabilities of 7 disaster risk small fill dams, where geotechnical information is available, were evaluated using event tree analysis. Also, the methods and procedures for evaluating probabilities are illustrated. The relationship between dam height and freeboard for 84 disaster risk small dams, for which the safety diagnosis reports are available, was examined. This relationship was associated with the failure computation equation contained in the toolbox of US Army corps of engineers. From this association, the dam height-freeborard critical curve, which represents 'zero' failure probability, was derived. The seismic failure probability of the Korean disaster risk fill dams was estimated using the critical curve and the failure probabilities computed for 7 small dams.
Kim, Kyeong-Hwan;Choo, Yun-Wook;Kim, Dong-Soo;Park, Han-Kyu;Shin, Dong-Hoon;Cho, Sung-Eun;Lim, Eun-Sang
Proceedings of the Korean Geotechical Society Conference
/
2009.03a
/
pp.278-287
/
2009
This thesis studied effect of zoning on seepage flow in concrete faced gravel-fill dam (CFGD) designed to have selected main rockfill or gravel-fill zone, Zone 3Bs with higher permeability to enhance the safety against accidental water infiltration into the dam. For this purpose, centrifuge model tests with two cases, with and without Zone 3Bs, were performed in order to investigate the necessity and the function of Zone 3Bs. Model dams were made by soil samples with modified coefficients of permeability and concrete faced slab was simulated with aluminum alloy. Water infiltration was simulated by rising water table over cracks on the facing. Behaviors of model dams were measured by LVDTs, strain gages, pore water pressures and cameras. Form the results of centrifuge tests, it was found out that the Zone 3Bs acts as a protection of main gravel-fill zone by inducing flow paths for infiltrated water into it as well as by draining off the infiltrated water out of the dam in a short time.
KSCE Journal of Civil and Environmental Engineering Research
/
v.34
no.6
/
pp.1815-1829
/
2014
Recently frequent collapse of old fill dams has taken place, which increases social awareness in the safety of the infrastructure. Fill dams in Korea has been incautiously regarded as safe once the fill dam is considered to have a full capacity to retain a conservative design flood determined by government authorities. However, developed foreign countries has been managing their fill dams by introducing systematic risk assessment techniques over a long period of time. In this study, the system response probabilities of the deteriorated old fill dams in Korea were systematically evaluated and analyzed by using the internal erosion toolbox based on the event tree analysis technique. The probability of the existence of flaw and the magnitude of the hydraulic gradient through a potential crack can significantly influence the geotechnical system response probability. The results of this study show that the probability of the existence of flaw and the magnitude of the hydraulic gradient through a potential crack can significantly influence the geotechnical system response probability and the risk of the deteriorated fill dam can be quantitatively assessed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.