• Title/Summary/Keyword: cost-schedule data

Search Result 188, Processing Time 0.027 seconds

Project Schedule Risk Assessment Based on Bayesian Nets (베이지안넷 기반의 프로젝트 일정리스크 평가)

  • Sung, Hongsuk;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.1
    • /
    • pp.9-16
    • /
    • 2016
  • The project schedule risk in the engineering and facility construction industry is increasingly considered as important management factor because the risks in terms of schedule or deadline may significantly affect the project cost. Especially, the project-based operating companies attempt to find the best estimate of the project completion time for use at their proposals, and therefore, usually have much interest in accurate estimation of the duration of the projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, and then performing risk assessment with simulation such as Monte-Carlo simulation method. However, since these approaches require the accumulated executional data, which are not usually available in project-based operating company, and, further, they cannot reflect various schedule constraints, which usually are met during the project execution, the project managers have difficulty in preparing for the project risks in advance of their occurrence in the project execution. As these constraints may affect time and cost which role as the crucial evaluation factors to the quality of the project result, they must be identified and described in advance of their occurrence in the project management. This paper proposes a Bayesian Net based methodology for estimating project schedule risk by identifying and enforcing the project risks and its response plan which may occur in storage tank engineering and construction project environment. First, we translated the schedule network with the project risks and its response plan into Bayesian Net. Second, we analyzed the integrated Bayesian Net and suggested an estimate of project schedule risk with simulation approach. Finally, we applied our approach to a storage tank construction project to validate its feasibility.

An Integrated Construction Management System Based on the Earned Value Concept (EV개념에 의한 통합건설공사관리시스템)

  • Chung Chul-Won;Lee Jeom-Su;Oh Kyu-Whan;Chang Jin-Sik;Lee Yu-Seop;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.155-162
    • /
    • 2001
  • Recently, in Korea, a few construction companies have been tried to develop a management system, which is able to integrate schedule and cost. In spite of these attempts, however, advanced management techniques can be hardly applied under the BoQ based management system. In order to improve these problems, many studies have been peformed, but yet could not overcome practical limitations. Besides, the application of historical data is below the level since it is so difficult to accumulate and feed-back historical data under the unique character of construction industry. Consequently, lots of time and effort have being wasted to establish control criteria. The newly generated Information is not systematically managed as well. Therefore, this study suggests Integrated Construction Management System complemented the existing practical problems.

  • PDF

The Establishment of an Activity-Based EVM - PMIS Integration Model (액티비티 기반의 EVM - PMIS 통합모델 구축)

  • Na, Kwang-Tae;Kang, Byeung-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.199-212
    • /
    • 2010
  • To establish an infrastructure for technology and information in the domestic construction industry, several construction regulations pertaining to construction information have been institutionalized. However, there are major problems with the domestic information classification system, earned value management (EVM) and project management information system (PMIS). In particular, the functions of the current PMIS have consisted of a builder-oriented system, and as EVM is not applied to PMIS, the functions of reporting, analysis and forecast for owners are lacking. Moreover, owners cannot confirm information on construction schedule and cost in real time due to the differences between the EVM and PMIS operation systems. The purpose of this study is to provide a framework that is capable of operating PMIS efficiently under an e-business environment, by providing a proposal on how to establish a work breakdown structure (WBS) and an EVM - PMIS integration model, so that PMIS may provide the function of EVM, and stakeholders may have all information in common. At the core of EVM - PMIS integration is the idea that EVM and PMIS have the same operation system, in order to be an activity-based system. The principle of the integration is data integration, in which the information field of an activity is connected with the field of a relational database table consisting of sub-modules for the schedule and cost management function of PMIS using a relational database management system. Therefore, the planned value (PV), cost value (CV), actual cost (AC), schedule variance (SV), schedule performance index (SPI), cost variance (CV) and cost performance index (CPI) of an activity are connected with the field of the relational database table for the schedule and cost sub-modules of PMIS.

Cockpit Crew Scheduling using Set Partitioning Problem (집합분할모형을 이용한 운항승무원의 승무경로 일정계획)

  • 김국연;이영훈
    • Korean Management Science Review
    • /
    • v.21 no.1
    • /
    • pp.39-55
    • /
    • 2004
  • Efficient crew scheduling for cockpit crew is important in airline industry due to operational safety and cost associated with the flight duty time. Because of complexity of regulations imposed to the cockpit crew. it is complicated to generate an efficient schedule. Schedule of cockpit crew can be generated through two steps; selecting of flight patterns. and scheduling of them to the specific time horizon. Heuristic method is developed and applied with massive data in a limited time of computation. A set of flight patterns is selected from all possible flight patterns. which are generated by composing the flight leg based on regulations. by using the set partitioning problem with objective function of oversea stay cost. The selected set of flight patterns found at the first step is allocated to 4 week crew schedule to minimize the variance of total fight time assigned to each crew. The crew schedules obtained are evaluated and compared with the ones currently used in one of major airline company.

Work Management Model to Integrate Schedule and Bill of Quantity (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • Park, Hong-Tae;Park, Chan-Jeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

A Study on Accounting for Nursing Cost by Korean Diagnosis Related Groups (K - DRGs) (종합병원(綜合病院)의 간호행위양상(看護行爲樣相)에 따른 간호원가(看護原價) 산정(算定)에 관(關)한 연구(硏究))

  • Oh, Hyo-Sook
    • Journal of Korean Public Health Nursing
    • /
    • v.3 no.2
    • /
    • pp.5-46
    • /
    • 1989
  • The current medical payment Insurance Rates in Korea stipulate charges for medical treatment by the doctor, pharmaceutist, medical technician and maternity nurse. But unfortunately didn't specify those charges for nursing done by the professional nurse. Only basic nursing fee is accounted insufficiently in current medical insurance fee schedule. therefore, Being face with covering entire people by medical insurance by 1991, It seems that the problems pertaining to operating the hospital and medical insurance system would be incessantly expanded in that no mention is made of medical charges rendered by major medical producer service in the current system, For that reason, this study made an attempt to clarify the importance the professional nursing puts of the current medical payment. The purpose of this study was to accounting nursing fee which diveded into the current medical fee schedule. (Method) 1. Data collection; Importance and difficulties in nursing activities was conducted in 'S' National University Hospital. Total nursing activities were selected 72 items which included direct care and indirect care. This study was conducted to evaluating the degree of importance and difficulties according to nursing activities through questionnaire to 204 RN. and so relative difficulties (acuity) were computered because the nursing cost level of each nursing service was differently established by the equivalent coefficient according to degree of relative difficulty and time required. 2. Calculation of cost according to nursing activities; After 47 nursing activities were selected in General surgery nursing units, calculation of nursing cost was as follows Cost of Nursing activity = (relative difficulty X Average hourly wage and benefits of nurse) + material cost of nursing -t- Average nursing administration cost So, Calculated cost by nursing activities was compared to current non-insured and insurance rate. 3. Calculation of nursing cost by K - DRG ; Total of 578 patients who were hospitalized in General Surgery units from January to March 1988 ware classified by K - DRG After estimation of total nursing cost based on the K-DRG, verified the appropriateness of basic nursing fee in medical insurance rate (Results) 1. Analysis of degree of importance and difficulties were 4.16 and 3.67 based on 5 point scale. This score were judged that it is worthy specifying the nursing fee 2. The nursing cost of 47 nursing service items in general surgery patients showed that the average cost of nursing activity was \1374.5 and The lowest cost was \217 of 'oral administration nursing' item, The highest cost was \11,025 of 'saline enematill clear' item 3. The result of comparison between the calculated cost by nursing activities against the current non-insured and insurance rate showed that 13 items(27.7%) involved to payment of insurance rate, 9 items(19.1%) involved to non-insured rate, remainder 25 items (53.2%) were not charged anywhere of total 47 nursing activities 4. When calculated cost by nursing activities was 100. current insurance rate was 62.3, non-insured rate was 176.6. Therefore this showed that most of non-insured rate were higher than calculated nursing cost. The insurance rate, however, were lower than it. Reim-bursement was imputed to non-insured patients. So the current rate system became estrainged from cost system. When Remainder 25 items of nursing activities compared' to \1390 of daily basic nursing fee per patient belonged to payment as a insurance fee schedule, basic nursing fee schedule was 1-2% of calculated cost of nursing activities. Therefore it showed that nursing fee was not counted adequately in it. 5. Nursing cost by K-DRG estimated in chart review based on counting number of nursing activities and length of stay The result showed that average amount of total nursing cost was \183828.1 Comparison of nursing cost calculated by K- DRG and basic nursing fee schedule showed that only 12.3% of nursing cost was charged (Conclusion) From the above research result, It is fact that nursing prime cost should be estimated more accurately and included adequately in current medical payment system. The payment system of nursing activities should be introduced not only nursing activities of drug administration and injection fee belonged to insurance fee schedule but also most nursing activities belonged not to mekical fee schedule. Even if introducing payment system of nursing activities, It should be estimated scientific method of Accounting nursing cost So nurses could offer nursing care of good quality, thereby they could make a great contribution not merely to the convalescence of the patient but to the promotion of the people's health.

  • PDF

Sensititivity Analysis For Development Of Gulf Of Alaska

  • Pak, Ee-Tong
    • 한국해양학회지
    • /
    • v.11 no.2
    • /
    • pp.57-63
    • /
    • 1976
  • It was attempted to analyze the sensitivity of the oil prospect place named MARIA which placed inside Gulf of Alaska. For the analysis, P6031090, ECOANA( computer) which installed in the head office, Shell Oil Co was used and the data needed for computer programming were 1) Unit of Production data 2) Production Schedule 3) Total Gross Yearly Expenses and 4) Total Gross Capital and so on. The important data among the computer output 1) PVPAT (Present Value After Tax): $1,167,077,500 2) Payout After Tax: 3.14 Years (256,284,810 BBL Production) 3) Earning Power: 42% (After Tax) 4) PVPAT/BBL : $1.22 5) Capital/BBL : $2.00. On the other hand, the effect acted upon PVPAT with varying the Platform cost, Facility cost, Pipeline cost and Well cost was observed in comparion with the basic for range from 50% to 200%. Resultantly, the order was 1) Pipeline cost 2) Facility cost 3) Well cost 4) Platform cost for range form 100% to 200%. This project was completed by the contract with Shell Oil Co., and the geological data needed for this analysis were given by the head office and the development project started from Jan. 1976.

  • PDF

소프트웨어 비용추정 모형에 관한 소고

  • Kim, In-Su;Lee, Dae-Gi
    • ETRI Journal
    • /
    • v.9 no.3
    • /
    • pp.139-156
    • /
    • 1987
  • The problems in software cost management are well known. Cost estimates are too low. Software development projects frequently have cost overruns, which are due to poor estimates. A fair amount of work have been done toward developing cost estimation models. These models vary in their outputs (e. g., total cost, manning schedule) and in the factors used to calculate their estimates. They also vary with regard to the type of formula, parameters, use of previous data, and staffing considerations. This paper will distinguish them by the type of formula they use to calculate total effort and staffing level, and will discuss enough models to demonstrate the characteristics of each model category.

  • PDF

A Study on the Connection Model for Attribute Code of Earned Value Management System (정보화된 EVMS 구축을 위한 속성코드 연계모형 구성 연구)

  • Lee, Woo-Sik;Kang, Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.362-365
    • /
    • 2004
  • This study suggests an attribute code system for earned value management system (EVMS). The attribute code system can be used for integrating various EYM data from construction schedule and cost. If the suggested attribute code is used in EVM, sorting and typical classifying of EVM data is possible in the computerized system. Those functions are an effective management tool for construction manager comparing with other EVM tools.

  • PDF

Stochastic Programming Approach to Scheduling Elective Surgeries and the Effects of Newsvendor Ratio on Operating Room Utilization (추계적 계획법을 이용한 수술실 예약 모델과 Newsvendor 비율의 자원 효율성에 대한 영향 분석)

  • Min, Dai-Ki
    • Korean Management Science Review
    • /
    • v.28 no.2
    • /
    • pp.17-29
    • /
    • 2011
  • The purpose of this paper is to schedule elective surgery patients using a stochastic programming approach and to illustrate how operating room utilization behaves when a decision-maker varies costs associated with utilization. Because of the uncertainty in surgery durations, the underage and overage costs that a decision-maker considers plays an important role in allocating surgery cases into available operating room capacity. We formulate the problem as a stochastic mixed integer programming and propose a sampling-based approximation method for a computational purpose. Newsvendor model is employed to explain the results from numerical experiments that are conducted with the actual data from a hospital. The results show that the operating room utilization is more sensitive when the unit overtime cost is relatively larger than the unit cost for underutilized time.