• Title/Summary/Keyword: cost-schedule data

Search Result 189, Processing Time 0.029 seconds

A Study on the Utilization Improvements by Function Analysis of the Construction CALS (건설 CALS 시스템의 기능분석을 통한 활용성 개선방안 연구)

  • Kang, LeenSeok;Han, DongHo;Park, NamJin;Moon, HyounSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3D
    • /
    • pp.441-450
    • /
    • 2011
  • Recent construction projects consist of large and complex facilities, which project management information system (PMIS) is used for managing construction cost and schedule. The ministry of land, transport and maritime affairs (MLTM) is using a continuous acquisition and life-cycle support (CALS) system for managing the public construction projects. This study attempts to survey some problems of the CALS system in practical application, and then suggests the new functions to improve practical application of the CALS system. All functions in each menu were analyzed in the practical application aspect. All projects ordered from MLTM should use the CALS system as a PMIS, but the practical application is limited in partial functions and special working group. And the utilization of system is focused on simple tasks and report process. One of main reason is that the system is using numerical data rather than graphical data. This study suggests new functions and a visualized management method that can improve the practical applicability using a 4D object in each current functions.

An Integrated Maintenance in Injection Molding Processes (사출성형 공정에서의 통합정비방법에 관한 연구)

  • Park, Chulsoon;Moon, Dug Hee;Sung, Hongsuk;Song, Junyeop;Jung, Jongyun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.3
    • /
    • pp.100-107
    • /
    • 2015
  • Recently as the manufacturers want competitiveness in dynamically changing environment, they are trying a lot of efforts to be efficient with their production systems, which may be achieved by diminishing unplanned operation stops. The operation stops and maintenance cost are known to be significantly decreased by adopting proper maintenance strategy. Therefore, the manufacturers were more getting interested in scheduling of exact maintenance scheduling to keep smooth operation and prevent unexpected stops. In this paper, we proposedan integrated maintenance approach in injection molding manufacturing line. It consists of predictive and preventive maintenance approach. The predictive maintenance uses the statistical process control technique with the real-time data and the preventive maintenance is based on the checking period of machine components or equipment. For the predictive maintenance approach, firstly, we identified components or equipment that are required maintenance, and then machine parameters that are related with the identified components or equipment. Second, we performed regression analysis to select the machine parameters that affect the quality of the manufactured products and are significant to the quality of the products. By this analysis, we can exclude the insignificant parameters from monitoring parameters and focus on the significant parameters. Third, we developed the statistical prediction models for the selected machine parameters. Current models include regression, exponential smoothing and so on. We used these models to decide abnormal patternand to schedule maintenance. Finally, for other components or equipment which is not covered by predictive approach, we adoptedpreventive maintenance approach. To show feasibility we developed an integrated maintenance support system in LabView Watchdog Agent and SQL Server environment and validated our proposed methodology with experimental data.

An Analysis on the Effect of the Increase in the Fee of Magnetic Resonance Imaging Deciphering of the External Hospital: Focusing on the Brain Magnetic Resonance Imaging (MRI 외부병원 판독 수가 인상의 효과 분석: 뇌 관련 자기공명영상을 중심으로)

  • Kim, Logyoung;Sakong, Jin;Jo, Minho;Wee, Seah;Lee, Jinyong;Kim, Yongkyu
    • Health Policy and Management
    • /
    • v.31 no.3
    • /
    • pp.261-271
    • /
    • 2021
  • Background: In 2018, the government increased the fee for the magnetic resonance imaging (MRI) image deciphering services of the external hospital to discourage the redundant MRI scan and to induce appropriate use of the MRI services. It is important to evaluate the effect of the policy to provide the basis for establishing other MRI-related policies. Methods: The healthcare data of the patients who had brain MRI scans were organized by episode and analyzed using the panel study in order to find out the effect of the MRI-related policy on the substitution effect and the medical expenses. Results: As a result of the increase in the fee of deciphering the MRI image, there has been an uplift in deciphering the MRI scan of the external hospital. It implies that more hospitals chose to use the MRI scan taken by other clinics or hospitals, rather than the MRI scan taken at their own facilities. Conclusion: The research results imply that a policy that facilitates the exchange of the medical image data between the hospitals is needed in order to establish an efficient management system of the healthcare resources. Such improvement is expected to reduce the social cost and contribute to the stability in the finance of national health insurance.

An Analysis of the Construction Period Extension Causes of Environmental Improvement in School Facilities (학교시설 환경개선 공사사례의 공기연장 원인 분석)

  • Maeng, Joon-Ho;Kim, Sung-Joon ;Song, Byung-Joon ;Kim, Jae-Young
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.22 no.1
    • /
    • pp.13-27
    • /
    • 2023
  • This study analyzed the reasons for extending the construction period considering factors such as the quality of construction materials, safety and cost-effectiveness of construction, size of construction, academic schedule, and local conditions (complaints) when determining the appropriate period for school construction projects tailored to a specific region or educational office. Based on the example of construction projects for school facility improvement by education office A, this study conducted a case study to identify the motives for construction period extension. To determine the appropriate construction period for school facilities, this study conducted a comprehensive review of construction projects under the jurisdiction of education office A, examined data from the Meteorological Data Open Portal, and performed advanced statistical analysis. Future case studies must determine the appropriate construction period for school facilities in a rational and systematics.

Estimation of Nursing costs for Hospitalized Patients Based on the KDRG Classification (5개 KDRG(한국형진단명기준환자군)에 대한 간호원가 산정)

  • Park, Jung-Ho;Song, Mi-Sook;Sung, Young-Hee;Ham, Myoung-Lim;Yun, Seon-Ok
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.3 no.2
    • /
    • pp.151-165
    • /
    • 1997
  • A cost analysis for hospitalized patients was performed based on the KDRG classification in order to determine an appropriate nursing fee under the PPS(Prospective Payment System). The data was collected from 20 nursing units of three tertiary hospitals and two secondary hospitals from August 26 to September 15, 1996. The study consisted of 148 inpatients diagnosed for lens procedures(KDRG 03900), tonsillectomy &/or adenoidectomy(KDRG 16100), Cesarean section(KDRG 37000), or vaginal delivery(KDRG 37300) without any complications. The direct or indirect nursing hours of each patients were measured. Then, direct or indirect nursing expenditures of four nursing units, operating room and delivery room were computed. Finally, the resources used including average total nursing hours, average length of stay and average nursing cost of each KDRG were estimated as follows; 1) The average total nursing hours were 640 minutes for lens procedures, 403 minutes for tonsillectomy &/or adenoidectomy, 934 minutes for appendectomy with complicated principal diagnosis, 1,094 minutes for Cesarean section and 631 minutes for vaginal delivery. Significant differences were found in average total nursing hours among hospitals. 2) The average length of stay in lens procedures were 5 days, 4 days for tonsillectomy &/or adenoidectomy, 6 days for appendectomy with complicated principal diagnosis, 8 days for Cesarean section and 3 days for vaginal delivery. All results were within normal determined by the Ministry of Health and Welfare although significant differences existed among hospitals, especially with average length of stay for leng procedures between tertiary hospitals and secondary hospitals which was greater than for those of others. 3) The average nursing cost were 87,146 Won for lens procedures, 69,600 Won for tonsillectomy &/or adenoidectomy, 128,337 Won for appendectomy with complicated principal diagnosis, 151,769 Won for Cesarean section and 85,403 Won for vaginal delivery. These costs were 7.6%, 13.0%, 13.0%, 16.0% and 22.0%, respectively, of the official price fixed by the Ministry of Health and Welfare under the prospective payment system. Research for the analysis of nursing costs according to the severity of illness for those KDRGs shoud be carried out within the period of the PPS pilot project. In addition, a proper nursing fee schedule for a new reimbursement system based upon the result of the above research should be prepared in the near future.

  • PDF

Tobacco Control Law Enforcement and Compliance in Odisha, India - Implications for Tobacco Control Policy and Practice

  • Panda, Bhuputra;Rout, Anita;Pati, Sanghamitra;Chauhan, Abhimanyu Singh;Tripathy, Asima;Shrivastava, Radhika;Bassi, Abhinav
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.13 no.9
    • /
    • pp.4631-4637
    • /
    • 2012
  • Introduction: Tobacco use is a leading cause of deaths and disabilities in India, killing about 1.2 lakh people in 2010. About 29% of adults use tobacco on a daily basis and an additional 5% use it occasionally. In Odisha, non-smoking forms are more prevalent than smoking forms. The habit has very high opportunity cost as it reduces the capacity to seek better nutrition, medical care and education. In line with the WHO Framework Convention on Tobacco Control (FCTC), the Cigarettes and Other Tobacco Products Act (COTPA) is a powerful Indian national law on tobacco control. The Government of Odisha has shown its commitment towards enforcement and compliance of COTPA provisions. In order to gauge the perceptions and practices related to tobacco control efforts and level of enforcement of COTPA in the State, this cross-sectional study was carried out in seven selected districts. Materials and methods: A semi-structured interview schedule was developed, translated into Odiya and field-tested for data collection. It mainly contained questions related to knowledge on provisions of section 4-7 of COTPA 2003, perception about smoking, chewing tobacco and practices with respect to compliance of selected provisions of the Act. 1414 samples were interviewed. Results: The highest percentage of respondents was from the government departments. 73% of the illiterates consumed tobacco as compared to 34% post graduates. 52.1% of the respondents were aware of Indian tobacco control laws, while 80.8% had knowledge about the provision of the law prohibiting smoking in public places. However, 36.6% of the respondents reported that they had 'very often' seen tobacco products being sold 'to a minor', while 31.2% had seen tobacco products being sold 'by a minor'. In addition, 24.8% had 'very often' seen tobacco products being sold within a radius of 100 yards of educational institutions.

Management System of On-line Mode Client-cluster (온라인 모드 클라이언트-클러스터 운영 시스템)

  • 박제호;박용범
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.4 no.2
    • /
    • pp.108-113
    • /
    • 2003
  • Research results have demonstrated that conventional client-server databases have scalability problem in the presence of many concurrent clients. The multi-tier architecture that exploits similarities in clients' object access behavior partitions clients into logical clusters according to their object request pattern. As a result, object requests that are served inside the clusters, server load and request response time can be optimized. Management of clustering by utilizing clients' access pattern-based is an important component for the system's goal. Off-line methods optimizes the quality of the global clustering, the necessary cost and clustering schedule needs to be considered and planned carefully in respect of stable system's performance. In this paper, we propose methods that detect changes in access behavior and optimize system configuration in real time. Finally this paper demonstrates the effectiveness of on-line change detection and results of experimental investigation concerning reconfiguration.

  • PDF

National Cultural Dimensions and their Impact on Quality Management Maturity and Project Quality Performance: Focusing on ITER Project (국가의 문화차원이 품질경영 성숙도 수준과 프로젝트 품질에 미치는 영향: ITER 프로젝트를 중심으로)

  • Hyun, Young-Jun;Song, Haegeun;Park, Young-Taek
    • Journal of Korean Society for Quality Management
    • /
    • v.45 no.2
    • /
    • pp.247-260
    • /
    • 2017
  • Purpose: The study is aimed to identify the national cultural dimensions that are affecting the quality management (QM) maturity level and the project quality performance, and analyze their relationships. Methods: This study collected the data of QM Maturity level based on Crosby's QM maturity model and the project quality performance using the Iron Triangle (Quality, Time/Schedule and Cost) from the employees who are participating in the ITER Project across the major 8 countries (China, France, Italy, Japan, Korea, Russia, U.K. and U.S.A.). Three research hypotheses are proposed concerning the national cultural dimensions in this study and Hofstede's five cultural dimensions framework are used for the statistical test. Results: The results are two folds in the study: First, there is a significant positive correlation between the QM maturity level and the project quality performance. Second, three cultural dimensions (Collectivism, Large Power Distance and Strong Uncertainty Avoidance) and five cultural dimensions (Collectivism, Large Power Distance, Strong Uncertainty Avoidance, Feminity and Long Term Orientation) have a positive impact on the QM maturity level and the project quality performance respectively. Conclusion: From the results, the understanding and consideration of the culture difference among the countries participating International Collaboration R&D project are recommended.

Optimal Berth and Crane Scheduling Using Constraint Satisfaction Search and Heuristic Repair (제약만족 탐색과 휴리스틱 교정기법을 이용한 최적 선석 및 크레인 일정계획)

  • 류광렬;김갑환;백영수;황준하;박영만
    • Journal of Intelligence and Information Systems
    • /
    • v.6 no.2
    • /
    • pp.1-14
    • /
    • 2000
  • The berth and crane scheduling problem in a container terminal encompasses the whole process of assigning berth to each ship, determining the duration of berthing, assigning container cranes to each ship, and determining the specific start and end time of each crane service, for all the ships scheduled to be arriving at the terminal during a certain scheduling horizon. This problem is basically a constraint satisfaction problem in which cranes and berths should be assigned in such a way that all the spatial and temporal constraints are satisfied without any interference. However, it is also an optimization problem because the requested arrival and departure time should be met for as many of the scheduled ships as possible, while the operation cost of the terminal should be minimized. In this paper, we present an effective and efficient approach to solving this type of problem, which combines constrain satisfaction search and heuristic repair. We first employ a constraint satisfaction search to find a feasib1e solution. Then, the feasible solution is modified to a more optimal one by iteratively applying our heuristic repair operations within the framework of constraint satisfaction search. Experimental results with a real data from Pusan East Container Terminal showed that our approach can derive a schedule of satisfactory quality in a very short time.

  • PDF

DEVELOPMENT OF AN AUTOMATIC OBSERVATION SYSTEM FOR KOREAN e-CALLISTO STATION (한국 e-CALLISTO 관측소 자동 관측 시스템 개발)

  • PARK, JONGYEOB;CHOI, SEONGHWAN;BONG, SU-CHAN;KWON, YONGJUN;BAEK, JI-HYE;JANG, BI-HO;CHO, KYUNG-SUK;MOON, YONG-JAE;Monstein, Christian
    • Publications of The Korean Astronomical Society
    • /
    • v.30 no.3
    • /
    • pp.811-819
    • /
    • 2015
  • The e-CALLISTO is a network of CALLISTO (Compact Astronomical Low-frequency, Low-cost Instrument for Spectroscopy in Transportable Observatories) spectrometers which detect solar radio bursts 24 hours a day in frequency range 45-870 MHz. The number of channels per spectrum is 200 and the time resolution of whole spectrum is 0.25 second. The Korean e-CALLISTO station was developed by Korea Astronomy and Space Science Institute (KASI) collaborating with Swiss Federal Institute of Technology Zurich (ETH Zurich) since 2007. In this paper, we report replacement of the tracking mount and development of the control program using Visual C++/MFC. The program can make the tracking mount track the Sun and schedule CALLISTO to start and to finish its observation automatically using the Solar Position Algorithm (SPA). Daily tracking errors (RMSE) are 0.0028 degree in azimuthal axis and 0.0019 degree in elevational axis between 2014 January and 2015 July. We expect that the program can save time and labor to make the observations of solar activity for space weather monitoring, and improve CALLISTO data quality due to the stable and precise tracking methods.