• Title/Summary/Keyword: cost-benefit analysis method

Search Result 268, Processing Time 0.034 seconds

The Study of Financing for Energy Efficiency Homes (주택 에너지효율향상을 위한 재정지원 방안에 관한 연구)

  • Park, Kihyun
    • KIEAE Journal
    • /
    • v.12 no.6
    • /
    • pp.63-68
    • /
    • 2012
  • The aim of this study is to evaluate current policies and suggest the way of overcome financial impediments to the energy efficiency function of residential buildings. Based on this analysis the paper enumerates policy recommendations for enhancing how energy efficiency is addressed in building codes and other policies for residential buildings. For achieving this goal, this study conducts the cost-benefit analysis to measure total energy savings and associated total cost. The results of study shows that the cost is greater than the benefit from 1st to 4th year but the benefit will be greater than the cost for the rest of the year. In addition, this study designs a financial support method and an implementation mechanism. Investment from the capital market will take place with the government's interest subsidy. Home retrofit will be undertaken with low interest rate with 2.5% and the return will be paid by a monthly energy bill. The results of this study provides some useful insights for the policy design, including the importance of developing information tools for providing appropriate information to households.

Comparison of Benefit Estimation Models in Cost-Benefit Analysis: A Case of Chronic Hypertension Management Programs

  • Lim, Ji-Young;Kim, Mi-Ja;Park, Chang-Gi;Kim, Jung-Yun
    • Journal of Korean Academy of Nursing
    • /
    • v.41 no.6
    • /
    • pp.750-757
    • /
    • 2011
  • Purpose: Cost-benefit analysis is one of the most commonly used economic evaluation methods, which helps to inform the economic value of a program to decision makers. However, the selection of a correct benefit estimation method remains critical for accurate cost-benefit analysis. This paper compared benefit estimations among three different benefit estimation models. Methods: Data from community-based chronic hypertension management programs in a city in South Korea were used. Three different benefit estimation methods were compared. The first was a standard deterministic estimation model; second, a repeated-measures deterministic estimation model; and third, a transitional probability estimation model. Results: The estimated net benefit of the three different methods were $1,273.01, $-3,749.42, and $-5,122.55 respectively. Conclusion: The transitional probability estimation model showed the most correct and realistic benefit estimation, as it traced possible paths of changing status between time points and it accounted for both positive and negative benefits.

A Study On Cost/Benefit Analysis in the Economic Evaluation of GSIS Implementation (GSIS 도입의 경제적 평가에 있어서 비용/효과 분석에 관한 연구)

  • Kim, Joo-Hwan;Yom, Jae-Hong;Sohn, Duk-Jae;Yeon, Sang-Ho
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.1 no.1 s.1
    • /
    • pp.217-225
    • /
    • 1993
  • The cost/benefit analysis method is frequently used in the feasibility study of investments on geo-spatial information system. The cost/benefit analysis method has been applied extensively in the feasibility study of conventional information systems and recently efforts has been made to apply this method to geo-spatial information systems as well. This study efforts were made to present a cost/benefit model suitable for Korean GSIS and this model was then applied to Facility Management. In establishment of the cost model, the items of various costs were defined and a survey was made to find the average unit cost of each item. For the benefit model, the benefits of implementing a geo-spatial information system is classified into tangible and intangible benefits and only th tangible benefits were further classified. The established cost/benefit model was then applied to a gas distribution company with more than 100 employees and more than 300,000 customers. A GSIS was designed and the cost its implementation was compared to the present manual method of operation.

  • PDF

Benefit analysis model of the national map revision program using replacement cost method (대체비용법을 이용한 수치지형도 갱신사업의 편익분석 모형 연구)

  • Son, Hwamin;Yang, Sungchul;Ga, Chillo;Yu, Kiyun;Huh, Yong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.31 no.1
    • /
    • pp.79-87
    • /
    • 2013
  • This study proposed a method to analyze the economic benefit of the national map revision program using the replacement cost method. The replacement cost method measures the benefit of a project as the minimum cost to replace functions of the project with those of alternative goods or services in an existing market. Thus, the demands on 1/5,000 topographic map revision in 18 administrative tasks such as city and district management planning were surveyed in three local autonomous entities. Then the cost to alternatively fulfill the demands was estimated with the standard construction estimating system for the field surveying and surveying results in commercial GIS companies for the site investigation. With this cost estimation model, the benefit of the current national map revision program to the local autonomous entities was estimated as 265,960,999 won. And cost benefit ratios according to several revision frequencies from 0.5 to 4 year were also compared to find the optimal frequency.

Economic Analysis of Pleurotus Eryngii Cultivation Facilities (큰느타리버섯 재배사의 경제성 분석)

  • Suh, Won-Myung;Yoon, Yong-Cheol
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.48 no.6
    • /
    • pp.31-41
    • /
    • 2006
  • The analysis used in this work was cost-benefit analysis method. All future costs and returns of a given mushroom house were discounted to the time of initial investment (present) by means of 3.5% discount rate. Then the cost of ownership was compared to the return from the system. This analysis method has been developed and coded into a balance sheet for use on a EXCEL program. Using this programmed analysis,a large number of the case studies were examined using different combinations of economic conditions. These results will be very useful to individuals considering investment in a mushroom house, or any similar production system. By the way of the sensitivity analysis for each important parameter, the change of the marginal cost-benefit period could be finally determined. These parameters were typically construction cost of mushroom house, cost of cooling system, required cooling and heating energy amounts, unit price of mushroom media bottle, growing number of media bottles, production weight per unit bottle, sale price of mushroom, and annual number of growing period, etc.

Cost-Benefit based User Review Selection Method

  • Neung-Hoe Kim;Man-Soo Hwang
    • International journal of advanced smart convergence
    • /
    • v.12 no.4
    • /
    • pp.177-181
    • /
    • 2023
  • User reviews posted in the application market show high relevance with the satisfaction of application users and its significance has been proven from numerous studies. User reviews are also crucial data as they are essential for improving applications after its release. However, as infinite amounts of user reviews are posted per day, application developers are unable to examine every user review and address them. Simply addressing the reviews in a chronological order will not be enough for an adequate user satisfaction given the limited resources of the developers. As such, the following research suggests a systematical method of analyzing user reviews with a cost-benefit analysis, in which the benefit of each user review is quantified based on the number of positive/negative words and the cost of each user review is quantified by using function point, a technique that measures software size.

An Economic Evaluation of the Home Nursing Care Services: Public Health Center Versus Private Hospital (일개 보건소의 가정간호사업 위탁운영에 관한 경제성 평가)

  • Kim, Jin-Hyun;Lee, In-Sook;Joo, Mee-Kyoung
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.16 no.4
    • /
    • pp.409-418
    • /
    • 2010
  • Purpose: The purpose of this study was to compare the costs and benefits of home nursing care services between public health centers (PHC) and private hospitals. Method: Participants were 105 patients who had received home nursing care services from a private hospital or public health center. From a societal perspective, the researcher identified the costs and benefits of the services using performance data and calculated the net benefit and benefit/cost ratio. Result: The net benefit of the home nursing care service based in the PHC was 165.9 million won and benefit/cost ratio was 2.0, while the net benefit of the home nursing care services by the private hospital was 141.1 million won and benefit/cost ratio was 1.7. Both types of programs were economically validated. Conclusion: Home nursing care services were basically efficient as the results showed a positive net benefit. A cost-benefit analysis indicated that the PHC-based home nursing care services were more efficient than that of the private hospital. With limited human resources and management standards in public health centers, results suggest the need for a more systematic management of the home nursing care service to improve the health of this vulnerable community population.

Economic Analysis of Zero Energy Building in South Korea - focusing on Cost-Benefit analysis considering Social Cost - (공사비 변화에 따른 제로에너지건축물 경제성 분석 - 사회적비용을 고려한 비용편익 분석을 중심으로 -)

  • Kim, Jae-Moon
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.147-157
    • /
    • 2020
  • With the increasing obligation to reduce greenhouse gas emissions to the building sector, the government has been gradually expanding its obligation to zero-energy buildings since 2020. Since the ZEB certification took effect in 2017, 48 preliminary and main certifications have been completed as of March 2019, and most of them are public buildings or even certified, but have earned Grade 5 of ZEB. This means that compared with the number of annual building permits registered in Korea, the figure is insignificant, and that it receives little if not mandatory. Therefore, this study investigated empirical cases of ZEB additional construction cost and conducted cost benefit analysis according to changes in ZEB additional construction cost based on a preliminary feasibility analysis project recently conducted by the KDI. In addition, considering the public buildings, the social costs were considered, and the cost-benefit analysis method was the same as the KDI's preliminary feasibility analysis method. The analysis shows that if the ratio of ZEB additional construction cost is more than 5 percent, it is analyzed that there is no economic feasibility, and considering that the ratio of additional construction cost in the cases of ZEB in Korea is 17 percent to 38 percent, it will not be easy to obtain ZEB certification in terms of cost. Finally, to narrow these differences in cost and economic aspects, the overseas low energy and ZEB incentive examples proposed measures such as the concept of subsidy payment in Illinois and the compensation of social costs to private ZEB.

A Study on Cost-benefit analysis of Defense Improvement Project for Acquisition Alternative Analysis (방위력개선사업의 비용편익 분석을 통한 획득대안 분석 연구)

  • Kim, Byung-Chan;An, Dan
    • Journal of Convergence for Information Technology
    • /
    • v.11 no.6
    • /
    • pp.113-119
    • /
    • 2021
  • Since the weapon system project has a large ripple effect on the country by investing a huge budget, analysis of acquisition methods that secured economic feasibility is required in the planning stage to promote the weapon acquisition project. In response to this demand, economic analysis for acquisition method is preformed in the research stage of previous studies, but the analysis on economic analysis for acquisition alternative is imperfect at the present. In this research, we identify the limitations of the effect analysis and propose an additional cost-benefit analysis method to analyze the economic feasibility of the acquisition alternative. It is possible to present the universal results of economic feasibility analysis for not only multiple alternatives but also single alternatives by presenting benefit/cost ratio. It is applied to research on acquisition project of OO guided rocket, and the result of economic analysis for each alternative is presented.

Analysis of Air Traffic Delays at an Airpor (공항에서의 항공교통 지체현상 분석)

  • Kim, B.J.
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.8 no.1
    • /
    • pp.57-66
    • /
    • 2000
  • Benefit-cost analysis is one of key elements of feasibility study on a large scale investment for transportation infrastructure improvements. Benefit-cost analysis requires measuring expected benefits after the investment is completed. Reduction of delays is the major source for the benefit among other measurable benefits. Measurement methods for delays reduction have been reviewed and two methods were recommended for passenger delay and aircraft operation delay. Using these method, the effects of Cheju International Airport Improvement Projects were evaluated.

  • PDF