• 제목/요약/키워드: cost-analysis system

검색결과 4,377건 처리시간 0.034초

정보보안 예산 수립에서 퍼지 AHP의 적용을 통한 위험 비용 분석 (Cost Risk Analysis for Preparing Budgets of Information Security using Fuzzy AHP)

  • 류시욱;허덕규
    • 대한안전경영과학회지
    • /
    • 제14권3호
    • /
    • pp.119-126
    • /
    • 2012
  • Recently, the breakdown of online banking servers and the leakage of customer information give rise to much concern about the security of information systems in financial and banking companies in Korea. The enforcement of security for information system becomes much more important issue than earlier. However, the security reinforcement of information system is restricted by a budget. In addition, the activities' cost to secure information system from threatening are under uncertain circumstances and should be established by a human decision maker who is basically uncertain and vague. Thus, making the budget for information system is exposed to any extent of the risk for these reasons. First, we introduce brief fuzzy set theory and fuzzy AHP (Analytic Hierarchy Process) methodology. Then, the cost elements that comprise yearly budget are presented and the priorities among the cost elements are calculated by fuzzy AHP. The cost elements that are exposed to risk are evaluated from the both perspectives of the risk impact and risk occurrence possibility which are expressed as linguistic terms. To get information on the risk profiles-pessimistic, most likely, and optimistic-for each cost element, the evaluation is accomplished and the result is presented. At last, the budget ranges-minimum, mode, maximum-for each cost element are estimated with the consideration of the risk profiles.

Warranty Cost Models for a Second-Hand Products

  • Kim, Che-Soong
    • 산업경영시스템학회지
    • /
    • 제22권53호
    • /
    • pp.1-12
    • /
    • 1999
  • A warranty cost analysis for new products have received a lot of attention. In contrast, there is hardly any literature on similar analysis for second-hand products. The market of second-hand products has been increasing and along with that the importance of warranties for second-hand products has also been increasing. However, warranty policies similar to new products are not economically acceptable to dealers. One needs to formulate new warranty policies and models to estimate expected warranty costs for second-hand products. This paper proposes one-dimensional cost sharing warranty policies and develops models at system level to analysis warranty cost for second-hand products sold with these policies.

  • PDF

시뮬레이션 기반 가정용 연료전지 시스템의 경제적 운전전략에 관한 연구 (A Simulation based Study on the Economical Operating Strategies for a Residential Fuel Cell System)

  • 황수영;김민진;이진호;이원용
    • 한국수소및신에너지학회논문집
    • /
    • 제20권2호
    • /
    • pp.104-115
    • /
    • 2009
  • In case of residential fuel cell system, it is significant to stably supply heat and power to a house with high efficiency and low cost for the successful commercialization. In this paper, the control strategy analysis has been performed to minimize the total cost including capital and operating cost of the residential fuel cell system. The proposed analysis methodology is based on the simulator including the efficiency models as well as the cost data for fuel cell components. The load control strategy is the key factor to decide the system efficiency and thus the cost analysis is performed when the fuel cell system is operated for several different load control logics. Additionally, annual efficiency of the system based on the seasonal load data is calculated since system efficiency is changeable according to the electric and heat demand change. As a result, the hybrid load control combined electricity oriented control and heat oriented control has the most economical operation.

A Study on Life Cycle Cost on Railway Locomotive Systems

  • Egamberdiev, Bunyod;Lee, Kookchan;Lee, Jongwoo;Burnashev, Shamil
    • International Journal of Railway
    • /
    • 제9권1호
    • /
    • pp.10-14
    • /
    • 2016
  • Life cycle cost analysis is compulsively required for the system operation. System operation costs are consisted of acquisition, operation, maintenance and so on. In the beginning of the system planning, we need to take into account of various costs following the system operating. To implement LCC, we need to analyze system life cycle to identify all costs during system life. The costs can be divided into three parts. The first part is purchasing cost, the second for operating cost and the last for disposal cost. The second operating cost can be decomposed of operating cost included labor, energy consumption cost for system running, maintenance costs to keep systems healthy, delay cost caused from maintenance and hazard cost, and so on. In this paper, we carried out for railway locomotives which operate over more 30years and which cost about 10 million USD. We decompose the life cycle of the locomotives and break down the locomotives into subsystems to require maintenance or not, and subsystems to need energy or not. We showed how to decide optimal locomotives through cost identification and system breakdown.

제조산업에서의 인간-기계시스템과 관연된 품질비용분석에 관한 연구 (A Study on the Analysis of Quality Cost in the Man-Machine System)

  • 김형준
    • 산업경영시스템학회지
    • /
    • 제18권34호
    • /
    • pp.155-159
    • /
    • 1995
  • For the relationship between conformance cost and the individual elements of non-conformance, an analysis was made of the relationship between inspection cost and training cost and scrap cost. As a result it was explained that there was all a positive correlation between training cost and scrap cost, and between inspection cost and scrap cost. Like this, training and inspection cost and scrap cost have a positive correlation. Judging from the fact that the coefficient of inspection cost is lower than that of training cost in the comparison of the coefficient of each cost, it can be analyzed that the change in scrap cost is influenced by the change in training cost more greatly than the change in inspection cost. If doing so, it can be interpreted that scrap cost and rework cost do not still decrease in spite of increasing in education and training cost and prevention cost. This result may represent the problem as to whether education and training cost is effectively expended for prevention activity. Accordingly, to cope with this situation, it is thought that scrap cost should be cut by establishing the effective prevention measure for causing the increase of scrap cost.

  • PDF

Sunbelt 지역의 태양광발전 경제성분석 (Economic Analysis on VLS-PV System from Sunbelt Region)

  • 최봉하;박수억;이덕기;김석기;송진수
    • 신재생에너지
    • /
    • 제2권4호
    • /
    • pp.86-92
    • /
    • 2006
  • This paper analyses the economics of 50kW PV system installed in Tibet and using domestic technology. We show that this system can be expanded to very large-scale photovoltaic power generation [VLS-PV] system successfully. Based on this result, we conduct the economic analysis of 100MW VLS-PV system designed assuming that it will be installed from 2008 to 2017 in Tibet. In this analysis, future price of PV module and system are estimated based on the methodology of experience curve. In 50kW PV system, the generation cost is calculated at 567.2 won/kWh and this is lower than the one of domestic PV system. In future 100MW VLS-PV system. the generation cost is calculated at 305.4 won/kWh by declining system price. If the lifetime and efficiency of the system goes up, due to future technological improvements, the generation cost can be lowered. Moreover, under the environmental and political effect, VLS-PV system can be as competitive as the conventional energy within 20 years.

  • PDF

부품소재 산업 통합 정보화 비용 편익 분석 (Cost-Benefit Analysis of Integrated Information System for Materials & Parts Industry)

  • 김윤종;문영호
    • 한국콘텐츠학회논문지
    • /
    • 제2권1호
    • /
    • pp.52-58
    • /
    • 2002
  • 정부의 부품ㆍ소재 산업 육성 방침에 따라 중소기업의 비중이 높은 부품ㆍ소재 산업의 정보화 지원 사업에 대한 타당성을 비용편익분석으로 검토하였다. 비용편익분석에서 비용부문은 한국과학기술정보연구원의 사업내용과 예산을 인용하여 현가 계산하였고 편익부문은 각 산업별 생산액을 예측하고, 생산액 대비 정보화 투자비율을 이용하여 각 산업별 정보화 비용을 산출하여 현가 계산하였다. 비용편익 비율은 4.67로 계산되어 사업타당성이 있는 것으로 검토되었다.

  • PDF

전력산업에서의 품질경영활동의 평가척도 (Assessment of Quality Management Activities in Power Industries)

  • 정영배
    • 산업경영시스템학회지
    • /
    • 제24권63호
    • /
    • pp.89-99
    • /
    • 2001
  • This paper proposes assessment of quality management activities based on cost of quality. Cost of quality is considered prevention cost, appraisal cost, internal failure cost, external failure cost in this paper. This paper shows quality cost magement system in thermal power site devision according to activity analysis. Cost of quality in power industries provides a valuable method of both proving the need for improvement and giving a starting point for projects.

  • PDF

히트 펌프 냉난방 시스템의 실사용을 통한 경제성 분석 (Economic Analysis of Heat Pump System through Actual Operation)

  • 신규원;김길태;주호영;이재근
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2006년도 하계학술발표대회 논문집
    • /
    • pp.921-926
    • /
    • 2006
  • The present study has been conducted economic analysis through actual operation of EHP and GHP which are installed at the same building of an university Cost items, such as initial cost, annual energy cost and maintenance cost of each system are considered to analyze LCC and economical efficiency is compared. The initial cost is considered on the basis of actual costs, and annual energy cost is converted into the cost after measuring electricity and gas consumption a day. LCC applied present value method is used to assess economical efficiency of both them. Variables used to LCC analysis are electricity cost escalation rate, natural gas cost escalation rate, interest rate, and service lives and when each of them are 4%, 2%, 8%, and 20 years, results of analysis short that EHP(148,257,306 won) is 8.05%(12,981,990 won) more profitable than GHP(161,239,295 won).

  • PDF

LCC 분석을 고려한 일반 시설물에서 소형열병합발전의 최적 설계 (Optimal Design of Cogeneration System for General Facilities Considering LCC Analysis)

  • 강율호;구본철;황유진;송재도;정성일;이재근
    • 설비공학논문집
    • /
    • 제21권8호
    • /
    • pp.439-447
    • /
    • 2009
  • Cogeneration system produces power as well as heat recovered from waste heat during power generation process. This system has higher energy efficiency than that of the power plant. In this study the optimal design for the cogeneration system with the increase of the capacity considering life cycle cost(LCC) analysis has been performed in the general facilities such as hotels and hospitals under the assumption of electricity cost of 95 won/kWh, the initial cost of cogeneration system of 1,500,000 won!kW and the value of 0.5${\sim}$1.0 in the ratio of heat to power. The optimal ratio of cogeneration capacity divided by average electricity load of facility was found out more than 0.5 in case of electricity cost with the increase of>30%, and the percentage of $CO_2$ reduction was about 9%. The most important factors in the economic analysis of cogeneration system was found out the electrity cost and the initial cost of cogeneration system. Also the ratio of heat to power at the value of>0.5 was not affected in the economy of cogeneration system, but was very important in the $CO_2$ reduction.