• 제목/요약/키워드: cost-analysis

검색결과 11,987건 처리시간 0.036초

Minimum Expected Cost based Design of Vertical Drain Systems (최소기대비용에 의한 연직배수시설의 설계)

  • Kim, Seong-Pil;Son, Young-Hwan;Chang, Pyung-Wook
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • 제49권6호
    • /
    • pp.93-101
    • /
    • 2007
  • In general, geotechnical properties have many uncertain aspects, thus probabilistic analysis have been used to consider these aspects. It is, however, quite difficult to select an appropriate target probability for a certain structure or construction process. In this study, minimum expected cost design method based on probabilistic analysis is suggested for design of vertical drains generally used to accelerate consolidation in soft clayey soils. A sensitivity analysis is performed to select the most important uncertain parameters for the design of vertical drains. Monte Carlo simulation is used in sensitivity analysis and probabilistic analysis. Total expected cost, defined as the sum of initial cost and expected additive cost, varies widely with variation of input parameters used in design of vertical drain systems. And probability of failure to get the minimum total expected cost varies under the different design conditions. A minimum value of total expected cost is suggested as a design value in this study. The proposed design concept is applicable to unit construction process because this approach is to consider the uncertainties using probabilistic analysis and uncertainties of geotechnical properties.

Cost Analysis for Assessment of Reconstruction Projects (재건축사업의 진단평가를 위한 비용분석)

  • Kwon Dong-Chan;Lee Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.477-480
    • /
    • 2003
  • The objective procedure and criterion needs to efficiently perform the safety assessment and improve reliability for results of the cost analysis. There are many studies about cost analysis of safety assessment, but the these studies have problems such as non-quantification of criterions and methods. The purpose of this study to suggest the procedure and criterion for successful cost analysis and quantify cost factors. First, in the cost analysis of the housing reconstruction that is presented this study, determinate the life-cycle and the discount rate, then estimate reconstruction cost and remodeling cost. Finally, compare the annual equivalent LCC of two costs for decision malting to reconstruction or remodeling.

  • PDF

The Benefit Cost Analysis of the Accident Prevention Cost in Construction Work(I) (건설공사의 사고예방비용에 대한 효과분석(I))

  • Lim Heon-Jin;Kim Chang-Eun;Kim Jin-Soo
    • Journal of the Korea Safety Management & Science
    • /
    • 제7권5호
    • /
    • pp.9-18
    • /
    • 2005
  • This study delivers the actual condition of investment for industrial accident prevention based on survey of 526 construction sites. The various research techniques were used such as technical statistic analysis for construction industry, construction and civil engineering works, cost comparison of industrial accident prevention and accident loss. A formula was deduced to calculate accident loss and accident frequency by accident prevention cost through regression analysis.

DEVELOPMENT OF LIFE CYCLE COST ANALYSIS SYSTEM FOR THE BUILD-TRANSFER-LEASE PROJECTS

  • Chun-kyong Lee;Bong-ho Cho;Tae-keun Park
    • International conference on construction engineering and project management
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.119-129
    • /
    • 2007
  • In January 2005, the BTL private investment project was introduced in the Korean construction market as part of the plan to provide high-quality public service and expand the required facilities in a timely manner. Nonetheless, problems such as the low earning rate at the beginning of the business, burden of service compared to the cost of the proposed business, and limitations of the local small and medium-sized companies in relation to their participation in the project arose. The LCC analysis system for the BTL projects was developed as part of efforts toward efficiently investigating the investment eligibility. Specifically, methods for LCC analysis were selected for each stage of the BTL project in relation to the requests of experts for military residential facilities and public educational facilities. Variables were then extracted to derive an accurate analysis value, LCC for the 5 cost items (initial investment cost, operating expenses, maintenance expenses, energy cost, and disposal cost), analyzed, and system enabling comparative analysis for single and multiple initiatives by year and item, developed. Thus, we have to clearly require the accumulation of data to examine the appropriateness of the results of LCC analysis based on data and results.

  • PDF

A Study on Feasibility Analysis and Alternatives for Infrared Detector Development (적외선 검출기 개발가능성 및 대안분석 연구)

  • Min, Sung Ki;Kim, Chul Whan;Kim, Kyoung Su
    • Journal of the Korean Society of Systems Engineering
    • /
    • 제1권1호
    • /
    • pp.1-13
    • /
    • 2005
  • The purpose of this paper analyze development feasibility and alternatives for infrared detector development in both technology and cost. Infrared Detector is core component of Thermal Imaging System and developed by ADD from 2006 10 2008 year. We got raw input data from development and technical expert, and then analyze cost and technology for development feasibility, and alternatives study. Technology level is analyzed by TRL(Technology Readiness Level) and AOA(Analysis of Alternatives) is done by development cost estimate. Estimating the development cost, we use SEER-H that is parametric cost estimating tool based on Knowledge Base. This study can help those who are related to the cost and development feasibility analysis of other weapon systems.

  • PDF

Evaluation Standard of Cost-Effectiveness Analysis for Renew of Architectural Equipment in Public Building (공공건물 건축설비 갱신 계획시 비용-효율분석 평가기준에 관한 연구)

  • Jung, Soon-Sung
    • Journal of Power System Engineering
    • /
    • 제17권4호
    • /
    • pp.131-138
    • /
    • 2013
  • The purpose of this study is to suggest the evaluation standard of cost-effectiveness analysis for renew of architectural equipment in public building. Evaluation items of cost-effectiveness analysis for renew of architectural equipment in public building were used life cycle cost, energy consumption(ton of oil equivalent), green house gas emissions(ton of carbon dioxide) and maximum power demand. Life cycle cost is the process of making an economic assessment of an item, area, system, or facility by considering all significant costs of ownership over an economic life, expressed in terms of equivalent costs. The essence of life cycle costing is the analysis of equivalent costs of various alternative proposals. The social concern with green house gas and maximum power demand of architectural equipment field has been growing for the last several years.

Cost Analysis Study : Development of HVAC&R System Cost Estimation and Prediction Methodology for Office Buildings (사무소 건물의 HVAC&R 시스템 공사비 분석방법 및 예측에 관한 연구)

  • Cho, Jinkyun;Shin, Seungho;Kim, Jonghurn
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • 제26권3호
    • /
    • pp.115-121
    • /
    • 2014
  • HVAC&R system costs can often be one of the most expensive components, representing approximately 15% of the total construction cost for office buildings. Despite their significant importance, there is a lack of a consistent and homogeneous framework to approximate the estimate research. This research deals with the prediction methodology of HVAC&R system cost with the aim of establishing a common idea for the analysis of the construction cost estimate. Our approach deals with the concept of an HVAC&R set that is composed of subsystems. The matrix combination analysis is examined, and total 960 HVAC&R system cost estimation can be implemented to large scale office buildings.

Analysis on the Construction Cost of Steel Truss Stadium (철골 트러스 스타디움 구조물의 공사비 분석)

  • Jang, Myung-Ho;Sur, Sam-Yeol
    • Journal of Korean Association for Spatial Structures
    • /
    • 제7권2호
    • /
    • pp.75-82
    • /
    • 2007
  • Building costs means capital costs which include cost of land, cost of acquiring and preparing the site, construction costs, engineering fees, furnishings, cost of financing the project, and cost of management required to run and maintenance the building for use. An economic analysis is one of the most important factor to determine the project feasibility. The purpose of the this study is to analysis on the construction cost structure of steel truss stadium.

  • PDF

The analysis of cost-effectiveness of implant and conventional fixed dental prosthesis

  • Chun, June Sang;Har, Alix;Lim, Hyun-Pil;Lim, Hoi-Jeong
    • The Journal of Advanced Prosthodontics
    • /
    • 제8권1호
    • /
    • pp.53-61
    • /
    • 2016
  • PURPOSE. This study conducted an analysis of cost-effectiveness of the implant and conventional fixed dental prosthesis (CFDP) from a single treatment perspective. MATERIALS AND METHODS. The Markov model for cost-effectiveness analysis of the implant and CFDP was carried out over maximum 50 years. The probabilistic sensitivity analysis was performed by the 10,000 Monte-Carlo simulations, and cost-effectiveness acceptability curves (CEAC) were also presented. The results from meta-analysis studies were used to determine the survival rates and complication rates of the implant and CFDP. Data regarding the cost of each treatment method were collected from University Dental Hospital and Statistics Korea for 2013. Using the results of the patient satisfaction survey study, quality-adjusted prosthesis year (QAPY) of the implant and CFDP strategy was evaluated with annual discount rate. RESULTS. When only the direct cost was considered, implants were more cost-effective when the willingness to pay (WTP) was more than 10,000 won at $10^{th}$ year after the treatment, and more cost-effective regardless of the WTP from $20^{th}$ year after the prosthodontic treatment. When the indirect cost was added to the direct cost, implants were more cost-effective only when the WTP was more than 75,000 won at the $10^{th}$ year after the prosthodontic treatment, more than 35,000 won at the $20^{th}$ year after prosthodontic treatment. CONCLUSION. The CFDP was more cost-effective unless the WTP was more than 75,000 won at the $10^{th}$ year after prosthodontic treatment. But the cost-effectivenss tendency changed from CFDP to implant as time passed.

A Study on Building of Underpass for Small Vehicles by Benefit and Cost Analysis (편익과 비용 분석을 통한 소형차전용지하차도 도입에 관한 연구)

  • Lee, Young Woo
    • International Journal of Highway Engineering
    • /
    • 제15권2호
    • /
    • pp.149-157
    • /
    • 2013
  • PURPOSES : This study is to analysis for benefit and construction cost in underpass for small vehicles. METHODS : The study was performed using the traffic software VISSIM 5.20 for analysis on a variety of traffic conditions and analysed of benefits of changes through analysis of travel speed and travel time after modeling of existing underpass and small vehicle underpass. RESULTS : Results of this study, the benefits will be reduced by the introduction underpass for small vehicles were analyzed because heavy vehicles use the intersection above the underpass. However, it was required economic analysis considering both the benefits reduction and the construction costs reduction because it has the effect of reducing the construction cost. Showed that the difference in benefit changes depending on the v/c and heavy vehicles ratio and construction cost was difference by types of underpass. As a result of performing economic analysis with total benefits and construction cost, it was analyzed to be economical in underpass over a certain size. CONCLUSIONS : The result of this study are expected to be able to contribute to reviewing for feasibility due to the small vehicles underpass introduction and economic analysis. The study is case study to the underpass in Daegu. Therefore, the future requires the calculation of benefits reflect a wider range of traffic conditions and the economic analysis to construction cost calculation for various types of grad separation facilities.