• 제목/요약/키워드: cost volume

검색결과 1,159건 처리시간 0.028초

어류양식장 생산계획에 관한 연구 (Production planning in fish farm)

  • 어은양
    • 수산경영론집
    • /
    • 제46권3호
    • /
    • pp.129-141
    • /
    • 2015
  • Because land based aquaculture is restricted by high investment per rearing volume and control cost, good management planning is important in Land-based aquaculture system case. In this paper master production planning was made to decide the number of rearing, production schedule and efficient allocation of water resources considering biological and economic condition. The purpose of this article is to build the mathematical decision making model that finds the value of decision variable to maximize profit under the constraints. Stocking and harvesting decisions that are made by master production planning are affected by the price system, feed cost, labour cost, power cost and investment cost. To solve the proposed mathematical model, heuristic search algorithm is proposed. The model Input variables are (1) the fish price (2) the fish growth rate (3) critical standing corp (4) labour cost (5) power cost (6) feed coefficient (7) fixed cost. The model outputs are (1) number of rearing fish (2) sales price (3) efficient allocation of water pool.

Safer Zone Analysis for Multiple Investment Alternatives on the Total-Cost Unit-Cost Domain

  • Kono, Hirokazu
    • Industrial Engineering and Management Systems
    • /
    • 제11권1호
    • /
    • pp.11-17
    • /
    • 2012
  • Along with the recent trend toward increasing variety and shorter life of products in the market, evaluation of risk for economic investment alternatives is of practical importance in manufacturing companies. This paper assumes that each alternative is composed of demand volume and unit sales price as income factors, and unit variable cost and fixed cost as expense factors. The paper assumes that these four factors move worse from the originally expected values, toward the direction of decreasing profit. Values of these four factors are also assumed to fluctuate from year to year over the entire multi-period. By applying the analysis of the breakeven points to each of the four factors, safer area against these changes is represented on the two dimensional domain called normalized total-cost unit-cost domain. A practical numerical example is analyzed to verify the validity of the proposed method.

The Analysis of User Cost according to Timing of National Highway Pavement Maintenance-Focusing on the Maesang Bidge Section in Korea

  • Kim, Yunsik;Lee, Minjae
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.606-607
    • /
    • 2015
  • The traffic volume on the road shows various trends reflecting regional characteristics for monthly and hourly, and economic loss affecting users varies according to the selected period for the maintenance of road pavements. Therefore, in this study, the user cost (or delay cost) for monthly and hourly on the work zone near the Maesang Bridge Section on Poseung-Gu, Pyeongtaek-si, Gyeonggi-do was calculated using the time series models and VISSIM, and based on the result, the effect of user cost reduction according to the selection of best maintenance period was examined. The analysis result showed that the month of the lowest user cost occurred due to the maintenance of target section was January (10,293,258 KRW/Day×1km) and the month of the greatest user cost occurred was November (13,337,495 KRW/Day×1km).

  • PDF

Development of safety-Based Guidelines for Cost-Effective Utility Pole Treatment along Highway Rights-of-Way

  • 김정현
    • 대한교통학회:학술대회논문집
    • /
    • 대한교통학회 1997년도 제32회 학술발표회
    • /
    • pp.33-69
    • /
    • 1997
  • This study was conducted to develop a methodology to predict utility pole accident rates and to evaluate cost-effectiveness for safety improvement for utility pole accidents. The utility pole accident rate prediction model was based on the encroachment rate approach introduced in the Transportation Research Board Special Report 214. The utility pole accident rate on a section of highway depends on the roadside encroachment rate and the lateral extent of encroachment. The encroachment rate is influenced by the horizontal and vertical alignment of the highway as well as traffic volume and mean speed. The lateral extent of encroachment is affected by the horizontal and vertical alignment, the mean speed and the roadside slope. An analytical method to generate the probability distribution function for the lateral extent of encroachment was developed for six kinds of encroachment types by the horizontal alignment and encroachment direction. The encroachment rate was calibrated with the information on highway and roadside conditions and the utility pole accident records collected on the sections of 55mph speed limit of the State Trunk Highway 12 in Wisconsin. The encroachment rate on a tangent segment was calibrated as a function of traffic volume with the actual average utility pole accident rates by traffic volume strategies. The adjustment factors for horizontal and vertical alignment were then derived by comparing the actual average utility pole accident rates to the estimations from the model calibrated for tangent and level sections. A computerized benefit-cost analysis procedure was then developed as a means of evaluating alternative countermeasures. The program calculates the benefit-cost ratio and the percent of reduction of utility pole accidents resulting from the implementation of a safety improvement. This program can be used to develop safety improvement: alternatives for utility pole accidents when a predetermined performance level is specified.

  • PDF

CVP 분석을 이용한 면허어업 손실보상액 평가 모형의 도출 (The Derivation of a Model to Estimate Compensation for Damages in Chartered Fisheries by Using CVP Analysis)

  • 정형찬
    • 수산경영론집
    • /
    • 제31권2호
    • /
    • pp.133-153
    • /
    • 2000
  • During the last several decades, Korea has been regarded as one of the fastest growing economies in the world. However, the small size of national land has not met the vigorous demand for land necessary to develop economic infra-structures such as large-scale harbors airports and highways. In order to satisfy the growing demand for land, the Korean government and industry have implemented the national land development programs to reclaim land from the sea fur the several decades. It is certain that these land development programs have resulted in a lot of property disputes between fishermen and public project administrators. This paper is to develop a quantitative model to estimate compensation for damages or restriction of charted fisheries resulting from large-scale public projects. In this paper, the compensation model is derived by using cost-volume-profit analysis framework because the compensation for charted fisheries basically depends on the factors such as the costs, production volume, profit of charted fisheries damaged or restricted by public projects. The model shows that the compensation for damages or restriction of charted fisheries is determined by the average annual profit, damage duration period, and the degree of fishery damages. In addition, the degree of fishery damages measured by the ratio of lost profit to annual average profit turns out to be determined by the following factors: annul profit, unit variable cost, decrease in production volume, the rate of increase in variable cost, and a change in fixed cost. Furthermore, this parer discusses the nam issues related to practices and regulation of the compensation for fishery damages in the current Fishery Act of Korea and suggests some appraisal methods which will be able to lead to theoretically correct and fair compensation for fisheries damages resulting from large-scale public projects.

  • PDF

Development of safety-Based Guidelines for Cost-Effective Utility Pole Treatment along Highway Rights-of-way

  • 김정현
    • 대한교통학회:학술대회논문집
    • /
    • 대한교통학회 1997년도 제32회 학술발표회
    • /
    • pp.35-72
    • /
    • 1997
  • This study was conducted to develop a methodology to predict utility pole accident rates and to evaluate cost-effectiveness for safety improvement for utility pole accidents. The utility pole accident rate prediction model was based on the encroachment rate approach introduced in the Transportation Research Board special Report 214. The utility pole accident rate on a section of highway depends on the roadside encroachment rate and the lateral extent of encroachment. The encroachment rate is influenced by the horizontal and vertical alignment of the highway as well as traffic volume and mean speed. The lateral extent of encroachment is affected by the horizontal and vertical alignment, the mean speed and the roadside slope. An analytical method to generate the probability distribution function for the lateral extent of encroachment was developed for six kinds of encroachment types by the horizontal alignment and encroachment direction. The encroachment rate was calibrated with the information on highway and roadside conditions and the utility pole accident records collected on the sections of 55mph speed limit of the State Trunk Highway 12 in Wisconsin. The encroachment rate on tangent segment was calibrated as a function of traffic volume with the actual average utility pole accident rates by traffic volume strategies. The adjustment factors for horizontal and vertical alignment were when derived by comparing the actual average utility pole accident rates to the estimations from the model calibrated for tangent and level sections. A computerized benefit-cost analysis procedure was then developed as a means of evaluating alternative countermeasures. The program calculates the benefit-cost ratio and the percent of reduction of utility pole accidents resulting from the implementation of a safety improvement. This program can be used to develop safety improvement alternatives for utility pole accidents when a predetermined performance level is specified.

  • PDF

보전비용 증가와 생산량 감소를 고려한 공정평균이동 모형 (A Process Mean Shift Model Considering The Increasing Maintenance Cost and The Decreasing Production Volume)

  • 이도경
    • 융합정보논문지
    • /
    • 제11권3호
    • /
    • pp.125-131
    • /
    • 2021
  • 모든 장비는 지속적인 사용에 의해 공정의 생산성과 경제성은 감소한다. 그러므로 일정 시점에서는 공정평균이동 문제라는 설비에 대한 예방보전이 필요하다. 설비의 보전시기를 결정함에 있어, 우리는 기존 연구에서 부분적으로 진행되어 온 보전모형들을 확장하고 통합함으로써 다양한 상황이 발생하는 생산 현장을 반영한 보전모형을 제시하고자 한다. 이를 구현하기 위해 제품규격은 상하한의 양쪽을 설정했으며, 적합품에 대해 품질손실함수를 도입했다. 마모수준에 대한 공정분산은 상수가 아닌 함수로 설정했으며, 특히 제품생산량과 보전비용에 있어서는 마모수준에 대한 함수를 개발하여 적용했다. 이로써 본 연구는 현장의 다양한 공정에 대부분 적용할 수 있는 보전모형이 될 것으로 생각한다. 추후 연구에서는 보전모형을 구성하는 부적합비용, 품질손실비용, 보전비용에 더하여 제품판매로 인한 수익 항목을 추가한 전체 수익 최대화 문제로 전개할 수 있을 것이며, 크게는 본 연구의 모형에 고장률을 도입한 보전모형으로의 확장도 생각해 볼 수 있을 것이다.

CCD 카메라를 사용한 저가형 Digital X-Ray 영상취득 시스템 (Low Cost Digital X-Ray Image Capture System Using CCD Camera)

  • 강용철
    • 전기학회논문지P
    • /
    • 제56권1호
    • /
    • pp.19-22
    • /
    • 2007
  • We developed a low cost digital X-Ray image capturing system using a CCD camera, instead of using the high cost image plate and image intensifier. In order to reduce the system volume, we directly made the dark box shorter than the previous model. Using the graphic language, we developed a program in order for post-processing the images captured by the CCD camera. This program improves the image resolving power.

작업처리능력 제약하에서 자동창고 건설비용 최소화를 위한 연구 (A Solution Procedure for Minimizing AS/RS Construction Costs under Throughput Rate Requirement Constraint)

  • 나윤균;이동하;오근태
    • 산업경영시스템학회지
    • /
    • 제25권4호
    • /
    • pp.40-45
    • /
    • 2002
  • An AS/RS construction cost minimization model under throughput rate requirement constraint has been developed, whose objective function includes S/R machine cost, storage rack cost, and interrace conveyor cost. S/R machine cost is a function of the storage rack height, the unit load weight, and the control logic used by the system, while storage rack cost is a function of the storage rack height, the weight and the volume of the unit load. Since the model is a nonlinear integer programming problem which is very hard to solve exactly with large problem size, a solution procedure is developed to determine the height and the length of the storage rack with a fixed number of S/R machines, while increasing the number of S/R machines one by one to meet the throughput rate requirement.

소규모 시공현장 적정공사비 확보를 위한 원가기준 마련 연구 (A Study on Cost Standards for Securing Appropriate Construction Costs for Small-Scale Construction Sites)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.347-348
    • /
    • 2023
  • In construction sites, small-scale construction quantities or limited work hours below the daily work volume may occur due to on-site conditions. For small-scale quantities, the input of equipment and labor is designed based on an hourly basis in the invoice, resulting in a difference from the actual cost. In this study, we aim to explore solutions from the perspective of construction cost standards to secure appropriate construction costs for small-scale and time-limited construction sites. Firstly, to preserve the basic construction costs on-site, we established standards where half the cost would be charged for construction quantities below four hours and a full day's cost would be designed for construction quantities between four to eight hours. Additionally, realistic construction cost calculation standards are expected to be provided by realizing a surcharge rate for work hour limitations to secure appropriate construction costs.

  • PDF