• Title/Summary/Keyword: cost rate

Search Result 4,341, Processing Time 0.03 seconds

A Study on the Efficient Applicability of Fenton Oxidation for the Wastewater Containing Non-biodegradable Organics (생물난분해성 유기물질 함유 폐수처리를 위한 Fenton 산화법의 효율적 적용방안에 관한 연구)

  • Jun, Se Jin;Kim, Mi Jeong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.14 no.1
    • /
    • pp.76-83
    • /
    • 2000
  • This research is about wastewater containing non-biodegradable TDI(Toluene Diisocyanate) that is treated by the activated carbon adsorption method. In the case of the Fenton oxidation process being applied to the existing process, optimal pH, reaction time, chemical dosing amount, removal rate, and cost were investigated. A pilot plant test was applied after finding optimal conditions with lab experiments. The optimal conditions were pH 3~5(COD removal rate 84~88%) and reaction time 30min~1hr. In higher $H_2O_2$ dosing amount, COD removal rate was a little higher. But there was little difference in the removal rate according to $FeSO_4{\cdot}7H_2O$ dosing amount. Treatment cost was economical in the case of the Fenton oxidation process being operated earlier than activated carbon adsorption system. But chemical dosing point, chemical mixing effect, chemical dosing amount, removal rate, and the cost of facility and others must be considered in practical process.

  • PDF

The study of stochastic inventory model with setup cost and backorder rate (Setup cost와 Backorder rate를 고려한 확률적 재고모형에 관한 연구)

  • 유승우;서창현;김경섭
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2003.06a
    • /
    • pp.129-134
    • /
    • 2003
  • In this paper, we determine optimal reduction in the lead time and setup cost for some stochastic inventory models. And we propose more general model that allow the backorder rate as a control variable. We first assume that the lead time demand follows a normal distribution. And we assume that the backorder rate is dependent on the length of lead time through the amount of shortages. The stochastic models analyzed in this paper are the classical continuous and periodic review policy models with a mixture of backorders and lost sales. For each of these models, we provide a sufficient conditions for the uniqueness of the optimal operating policy. We also develop algorithms for solving these models and provide illustrative numerical examples.

  • PDF

The Analysis about Construction Costs and Profitability of Direction between Subcontracting Construction in General Construction Industry (일반건설업의 직접시공과 하도급시공의 공사원가 및 수익성 비교분석)

  • Hwang, Ug-Sun;Lee, Hyun-Suk
    • Korean Business Review
    • /
    • v.19 no.1
    • /
    • pp.25-34
    • /
    • 2006
  • This research executed research that analyze construction cost and profitability through construction example of direction and subcontracting construction based on common private construction less than 3 billion. The results of this research, is summarized as follows. (1) Analyzed profitability about construction gross and operating profit of direction and subcontracting construction. The construction gross profit rate is 15.2% direction construction, subcontracting construction was analyzed by 1.3% high by 16.5% subcontracting construction, and the operating profit rate is 9.4% direction construction, subcontracting construction was construed by 2.3% high by 11.7% subcontracting construction. (2) Analyzed profitability about operating profit before and after deduction of 4 insurance cost of direction construction. The direction construction operating profit rate is 9.4% before deduction of 4 insurance cost, after deduction was construed that is 7.3% and operating profit rate difference after and before deduction was construed that is 2.1%. Therefore, subcontracting construction (operating profit rate 11.7%) was analyzed that last operating profitability after 4 insurance cost deduction produces more 4.4% about direction construction.

  • PDF

Application analysis to a shared apartment house of heat storage type GSHP system with dual storage tank (이중 축열조를 갖는 축열식 지열원 히트펌프시스템의 노인공동주택 적용 분석연구)

  • Park, Jong-Woo;Lee, Sang-Hoon;Cho, Sung-Hwan
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.27-32
    • /
    • 2008
  • The present study has been conducted economic analysis of heat storage type ground source heat pump system(HSGSHP) and normal ground source heat pump (GSHP) which are installed at the same building in the shared an apartment house. Cost items, such as initial cost, annual energy cost and maintenance cost of each system are considered to analyze life cycle cost (LCC) and simple payback period (SPP) with initial cost different are compared. The initial cost is a rule to the Government basic unit cost of production. LCC applied present value method is used to assess economical profit of both of them. Variables used to LCC analysis are prices escalation rate and interest rate mean values of during latest 10 years. The LCC result shows that HSGSHP (1,050,910,000won) is more profitable than GSHP by 68.9% initial cost. And SPP appeared 3.0 year overcome the different initial cost by different annual energy cost.

  • PDF

A Study on the Maintenance Policy Considering the Failure Data of the EMU Braking System and the Cost Function (전동차 제동장치의 고장데이터와 비용함수를 고려한 유지보수 정책에 관한 연구)

  • Han, Jae-Hyun;Kim, Jong-Woon;Koo, Jeong-Seo
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.3
    • /
    • pp.13-19
    • /
    • 2015
  • Railway vehicle equipment goes back again to the state just before when failure by the repair. In repairable system, we are interested in the failure interval. As such, a statistical model of the point process, NHPP power law is often used for the reliability analysis of a repairable system. In order to derive a quantitative reliability value of repairable system, we analyze the failure data of the air brake system of the train line 7. The quantitative value is the failure intensity function that was modified, converted into a cost-rate function. Finally we studied the optimal number and optimal interval in which the costs to a minimum consumption point as cost-rate function. The minimum cost point was 194,613 (won/day) during the total life cycle of the braking system, then the optimal interval were 2,251days and the number of optimal preventive maintenance were 7 times. Additionally, we were compared to the cost of a currently fixed interval(4Y) and the optimum interval then the optimal interval is 3,853(won/day) consuming smaller. In addition, judging from the total life, "fixed interval" is smaller than 1,157 days as "optimal interval".

Making Decision of the Maintenance Priority of Power Distribution System using Time Varying Failure Rate and Interruption Cost

  • Chu, Cheol-Min;Kim, Jae-Chul;Yun, Sang-Yun
    • Journal of Electrical Engineering and Technology
    • /
    • v.4 no.1
    • /
    • pp.43-48
    • /
    • 2009
  • The purpose of the this paper is to make decision of the maintenance priority of power distribution system using Time-Varying Failure Rate(TVFR) with interruption cost. This paper emphasizes the practical use of the reliability indices and interruption cost. To make a decision of maintenance priority on power distribution system equipment, the quantification of the reliability level should be represented as a cost. In this paper, the TVFR of power distribution system equipment applied in this paper utilizes analytic method to use the historical data of KEPCO. From this result, the sensitivity analysis on TVFR of equipment was done for the priority, which represents that high priority of the equipment has more effect on system reliability, such as SAIDI or SAIFI, than other equipment. By this priority, the investment plan is established. In this result, customer interruption cost(CIC) could be extracted, and CIC is used as weighting factor to consider a importance of customer. After that, the result calculated the proposal method in this paper is compared with other priority method, such as lifetime, failure rate or only sensitivity.

Improvement of the Calculation Standard for Prolongation cost of Domestic Public Construction Project (국내 공공 공사 공기연장 간접비 산정 기준 개선방안 - 국가계약법 및 지방계약법 산정기준의 비교 고찰 -)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.95-102
    • /
    • 2016
  • Recently, a research regarding calculation of construction time extension-oriented incidental costs has been intensively suggested in quantitative aspect and recent studies on system improvement has been made continuously. In the case of Domestic Public Construction Works, State Contract Act is applied when the client is government whereas Local Government Contract Act is done when the client is local government, but more meticulous study is required because improvement plan is not proposed even there is a clear demand for improvement of these problems on calculation standard. Thus this study suggested appropriate standard by comparing each the calculation standards followed by 'State Contract Act' and 'Local Government Contract Act', considering the problems accorded, and analyzing field cases. Calculation method of other expenses was differently regulated as the revision of each regulation, and this demonstrates that there is a difference of actual cost from 12.37% to 24.95%. It is shown that less cost of construction time were calculated than actual cost according to a problem of calculation method by State Contract Act as the rate at the time of contract to be applied in other expense rate. This study suggested the rate against incidental cost and the rate of other expense per day against total construction cost as an appropriate rate calculation for other expense based on field database.

Determination of Optimum Batch Size and Fuel Enrichment for OPR1000 NPP Based on Nuclear Fuel Cycle Cost Analysis (OPR1000 발전소의 핵연료 주기비분석을 통한 최적 배취 크기와 핵연료 농축도 결정)

  • Cho, Sung Ju;Hah, Chang Joo
    • Journal of Energy Engineering
    • /
    • v.23 no.4
    • /
    • pp.256-262
    • /
    • 2014
  • Cycle length of domestic nuclear power plants is determined by the demand-supply plan of utility company. The target cycle length is achieved by adjusting the number of feed fuel assembly and fuel enrichment. Traditionally, utility company first select the number of feed fuel assembly and then find out the fuel enrichment to achieve the special cycle length. But it is difficult to find out if this method is most economical than any other combinations of the enrichment and batch size satisfying the same cycle length. In this paper, core depletion calculation is performed to find out the optimum combination of the enrichment and batch size for given target cycle length in terms of fuel cycle cost using commercial core design code; CASMO/MASTER code. To minimize the uncertainty resulting from transition core analysis, levelized fuel cycle cost analysis was applied to the equilibrium cycle core in order to determine the optimum combination. The sensitivity study of discount rate was also carried out to analyze the levelized fuel cycle cost applicable to countries with different discount rates. From the levelized fuel cycle cost analysis results, the combination with smaller batch size and higher fuel enrichment becomes more economical as the discount rate becomes lower. On the other hand, the combination with higher batch size and lower fuel enrichment becomes more economical as the discount rate becomes higher.

A Study on the Factors Influencing Cost-per-Click of Sponsored Search Advertising (키워드 검색광고에서 클릭당 단가 결정에 영향을 미치는 요인에 대한 연구)

  • Sim, Gwang-Seop;Kim, Jong-U
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2007.11a
    • /
    • pp.425-434
    • /
    • 2007
  • The sponsored search has become significant channel of online advertising, and the large sized advertisers have appeared, so the sponsored search strategy is becoming more important. Since CPC(Cost-per-Click) advertising has different price according to keyword, it is difficult to manage the a lot of keywords at one time. So, the purpose of this study is to investigate the factors which influence on the cost-per-click of sponsored search advertising. That is, there are four factors: impression, CTR(Click through Rate), conversion rate, and keyword's length. for the regression analysis, we use the actual data which is gotten from an ad agency. The result of that, the impression and keyword's length influence cost-per-click positively. However, CTR & conversion rate have no influence on it unexpectedly.

  • PDF

Optimal replacement policy following the expiration of payable RRNMW (유료 재생교체-비재생수리보증이 종료된 이후의 최적의 교체정책)

  • Jung, Ki-Mun
    • Journal of Applied Reliability
    • /
    • v.11 no.4
    • /
    • pp.409-417
    • /
    • 2011
  • In this paper, we consider a replacement model following the expiration of warranty. In other words, this paper proposes the optimal replacement policy for a repairable system following the expiration of payable renewing replacement-non-renewing minimal repair warranty. The expected cost rate per unit time from the user's perspective is used to determine the optimality of the replacement policy. Thus, we derive the expressions for the expected cycle length and the expected total cost to obtain the expected cost rate per unit time. Finally, the numerical examples are presented for illustrative purpose.