• Title/Summary/Keyword: cost control

Search Result 5,839, Processing Time 0.042 seconds

A Performance Analysis on a Heat pump with Thermal Storage Adopting Load Response Control Method (부하 대응 제어방식을 적용한 축열식 히트펌프시스템의 성능 해석)

  • Kim, Dong Jun;Kang, Byung Ha;Chang, Young Soo
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.30 no.3
    • /
    • pp.130-142
    • /
    • 2018
  • We use heat pumps with thermal storage system to reduce peak usage of electric power during winters and summers. A heat pump stores thermal energy in a thermal storage tank during the night, to meet load requirements during the day. This system stabilizes the supply and demand of electric power; moreover by utilizing the inexpensive midnight electric power, thus making it cost effective. In this study, we propose a system wherein the thermal storage tank and heat pump are modeled using the TRNSYS, whereas the control simulations are performed by (i) conventional control methods (i.e., thermal storage priority method and heat pump priority method); (ii) region control method, which operates at the optimal part load ratio of the heat pump; (iii) load response control method, which minimizes operating cost responding to load; and (iv) dynamic programming method, which runs the system by following the minimum cost path. We observed that the electricity cost using the region control method, load response control approach, and dynamic programing method was lower compared to using conventional control techniques. According to the annual simulation results, the electricity cost utilizing the load response control method is 43% and 4.4% lower than those obtained by the conventional techniques. We can note that the result related to the power cost was similar to that obtained by the dynamic programming method based on the load prediction. We can, therefore, conclude that the load response control method turned out to be more advantageous when compared to the conventional techniques regarding power consumption and electricity costs.

Guaranteed Cost Output Feedback Control for Time Delay Systems with Parameter Uncertainties (파라미터 불확실성을 가지는 시간 지연 시스템에 대한 보장비용 출력궤환제어)

  • 박재훈;정상섭;오도창;박홍배
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.271-271
    • /
    • 2000
  • This paper considers guaranteed cost output feedback controller for the uncertain time-varying delay systems with delays in state and control input. The uncertainty in the system is assumed to be norm-bounded and time-varying. The sufficient condition for the existence of controller and the guaranteed cost output feedback controller design method are presented. Also, using some changes of variables and Schur complements, the obtained sufficient condition can be reformulated as LMI forms in terms of transformed variables. Using the obtained LMI variables, we derive guaranteed cost controller gain and guaranteed cost.

  • PDF

STATISTICAL PROCESS CONTROL FOR MULTIPLE DEPENDENT SUBPROCESSES

  • Yang Su-Fen
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 1998.11a
    • /
    • pp.217-224
    • /
    • 1998
  • A cost model, controlling multiple dependent subprocesses with minimum cost, is derived by renewal theory approach. The optimal multiple cause-selecting control chart and individual Y control chart are thus constructed to monitor the specific product quality and overall product quality contributed by the multiple dependent subprocesses. They may be used to maintain the process with minimum cost and effectively distinguish which component of the subprocesses is out of control. The optimal design parameters of the proposed control charts can be determined by minimizing the cost model using simple grid search method, An example is given to illustrate the application of the optimal multiple cause-selecting control chart and individual Y control chart.

  • PDF

A Study on the Improvement of Total Cost Change Control in Private Investment Projects (민간투자시설사업에 있어 총사업비 변경관리의 개선방안 연구 - 고속도로 민간투자시설사업을 중심으로)

  • Kim Se-Jong;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.119-126
    • /
    • 2001
  • This paper analyzes problems related to total cost changes in private investment projects, and then proposes an improvement measure for the control of cost changes within the framework of the project management, contract, human resource, project communication, cost, and time management. From the viewpoint of contract management, the basis of cost change ought to be cleared up with standardization of related provisions in the concession agreement, and potentiality of change ought to be excluded with prescription of the private investor's leading role from the design phase. Regarding human resource management, this paper proposes a standard work flow granting much sovereign rights to private parts by putting restriction on work scopes of the entrusted authority of government, and transferring the rights of assignment, contract, and control about the responsible supervisor to the concessionaire. With regard to project communication management the notification of changes on drawings and technical documents ought to be automated and the realtime database ought to be established with DMIS (Drawings & Documents Management Information System). From the cost management point of view, this thesis integrates the control of cost-change-approved items and disapproved items to one cost breakdown system, and then harmonizes the actual progress with EVMS in time management.

  • PDF

Non-fragile guaranteed cost control of delayed descriptor systems (시간지연 특이시스템의 비약성 보장비용 제어)

  • Kim, Jong-Hae
    • Proceedings of the KIEE Conference
    • /
    • 2006.04a
    • /
    • pp.246-248
    • /
    • 2006
  • This paper is concerned with non-fragile guaranteed cost state feedback controller design algorithm for descriptor systems with time-varying delay and static state feedback controller with multiplicative uncertainty. The considered uncertainties are norm-bounded and time delay is time-varying. Under the condition of controller gain variations, conditions for the existence of controller satisfying asymptotic stability and non-fragility and controller design method are derived via LMI approach. Moreover, the measure of non-fragility and the upper bound to minimize guaranteed cost function are given.

  • PDF

Cost Estimation System for Design Evalution (설계평가를 위한 제조비용산정 시스템)

  • 박홍석;이규봉
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.281-284
    • /
    • 2000
  • For estimation manufacturing cost during the early design stage, desingers have to know compositon of manufacturmg cost. Manufacturing cost is summalion of material cost and processmg cost. To be able to control the manufacturmg cost, it is necessary to estimate the costs adequately and to store the cost data in a generic way. a generic system, which is the basis for the control of the production costs, takes into account geometric information, material information, process information and production planning information Manufacturing cost is summation of material cost and processing cost.

  • PDF

Development of Low-Cost Automatic Flight Control System for Unmanned Target Drone

  • Lee, Jang-Ho;Ryu, Hyeok;Kim, Jae-Eun;Ahn, Iee-Ki
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.367-371
    • /
    • 2004
  • This paper describes development of automatic flight control system for an unmanned target drone which is operated by Korean army as for anti-air gun shooting training. Current target drone is operated by pilot control of on-board servo motor via remote control system. Automatic flight control system for the target drone greatly reduces work load of ground pilot and can increase application area of the drone. Most UAVs being operated now days use high-priced sensors as AHRS and IMU to measure the attitude, but those are costly. This paper introduces the development of low-cost automatic flight control system with low-cost sensors. The integrated automatic flight control system has been developed by integrating combining power module, switching module, monitoring module and RC receiver as an one module. The performance of automatic flight control system is verified by flight test.

  • PDF

A Study on Cost-Benefit Analysis of Noise Control Facilities using Road Traffic Noise Map (도로교통 소음지도를 이용한 소음저감시설의 비용 / 효과 분석방법 연구)

  • Kim, Ji-Yoon;Park, Sang-Kyu
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2008.11a
    • /
    • pp.303-310
    • /
    • 2008
  • In Korea, the current noise impact assessment has not yet considered the vertical noise propagation property by buildings and other obstacles. And noise control plan has been established without conducting the economic assessment for the noise control facilities. A noise map is used to calculate the noise level based on a theoretical formula or an empirical formula, and also predict the characteristics of vertical propagation by linking with a geometry data. And It is Possible to analyze cost-effect of noise control facilities by consider installation costs. In this study, we addressed the application of noise map for noise impact assessment and cost-effect analysis of noise control facilities.

  • PDF

Guaranteed Cost Control for a Class of Uncertain Delay Systems with Actuator Failures Based on Switching Method

  • Wang, Rui;Zhao, Jun
    • International Journal of Control, Automation, and Systems
    • /
    • v.5 no.5
    • /
    • pp.492-500
    • /
    • 2007
  • This paper focuses on the problem of guaranteed cost control for a class of uncertain linear delay systems with actuator failures. When actuators suffer "serious failure" the never failed actuators can not stabilize the system, based on switching strategy of average dwell time method, under the condition that activation time ratio between the system without actuator failure and the system with actuator failures is not less than a specified constant, a sufficient condition for exponential stability and weighted guaranteed cost performance are developed in terms of linear matrix inequalities (LMIs). Finally, as an example, a river pollution control problem illustrates the effectiveness of the proposed approach.

A Simulation based Study on the Economical Operating Strategies for a Residential Fuel Cell System (시뮬레이션 기반 가정용 연료전지 시스템의 경제적 운전전략에 관한 연구)

  • Hwang, Su-Young;Kim, Min-Jin;Lee, Jin-Ho;Lee, Won-Yong
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.20 no.2
    • /
    • pp.104-115
    • /
    • 2009
  • In case of residential fuel cell system, it is significant to stably supply heat and power to a house with high efficiency and low cost for the successful commercialization. In this paper, the control strategy analysis has been performed to minimize the total cost including capital and operating cost of the residential fuel cell system. The proposed analysis methodology is based on the simulator including the efficiency models as well as the cost data for fuel cell components. The load control strategy is the key factor to decide the system efficiency and thus the cost analysis is performed when the fuel cell system is operated for several different load control logics. Additionally, annual efficiency of the system based on the seasonal load data is calculated since system efficiency is changeable according to the electric and heat demand change. As a result, the hybrid load control combined electricity oriented control and heat oriented control has the most economical operation.