The current building energy efficiency rating certification regulation on apartment houses evaluates only the saving rate of energy consumed during operation, i.e. use, of a building, but doesn't consider the energy consumptions and environmental load($CO_2$) emissions occurring during the whole lifetime of a building. So this study calculated the energy consumptions and environmental load emissions occurring during the whole lifetime of a building, selected reference schemes and alternative items by design variables to present a design draft considering energy efficiency and environmental performance, and evaluated the total cost by combining and calculating its direct cost(material and heating cost) and indirect cost(environmental cost), for an existing apartment house as an evaluation object. As a result of analysis, the change of heating cost by alternative items of design variables showed a 4~8% change rate compared to the reference scheme, and the material cost of design variable 7 showed a maximum 4.4 times change rate in the alternative plan 6 compared to the reference scheme. The environmental cost showed a similar change rate to the material cost change rate in general, but showed a similar environmental cost change rate to the heating cost change rate in case of design variables 4-1, 4-2, 7.
Environmental pressures from such sources an economic condition, the government and inter-institutional competition create managerial challenges. Economic pressures may be forcing dietetic dept, in hospital to utilize cost∙benefit analysis to assist them in their problem solving. Cost∙benefit analysis have been widely used in business, industry and many other fields with only limited application to foodservice. Due to the lack or this information the purposes of this study were to identify use of cost∙benefit analysis in hospital foodservice system to evaluate the economic efficiency of alternatives, and to make recommendation for operation system change. Using the cost∙benefit method, cash flows are separated into cost and benefits. For an alternative to be selected, indicators, such as NPV, benefit-cost ratio (B/C ratio) with 5% discount rate per annum. The sensitivity analysis was also conducted with difference rate 3%, 7% respectively and reduced employee payroll change. The result of this study can be summarized as follows : 1. The total cost of investment for operation system change was 390,570 thousand won and the total benefit through operation system change was 865,808 thousand won. 2. Net present value(NPV) for 5 years was 475,239 thousand won and benefit-cost ratio was 2.22. 3. In sensitivity analysis with different discount rate 3%, 7%, benefit-cost ratio was 2.25, 2.18 respectively, with total reduced employee payroll change, benefit-cost ratio was 2.86. In conclusion, total benefits were exceeded total costs. Therefore, the project of operation system change in hospital foodservice was found to be economically efficient.
During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.
The 9th International Conference on Construction Engineering and Project Management
/
pp.50-56
/
2022
Change Orders generally impact cost and schedule performance of highway projects. However, highway projects that do not have any change orders also face cost growth and schedule delays. This study seeks to determine the cost and schedule performance of Texas DOT projects by collecting project data for 120 highway projects completed between 2016 to 2020. For the study, we selected project data that has zero or negative change orders which were then grouped and analyzed based on their Project Types i.e., maintenance works; structural works; restoration and rehabilitation works; and safety works. The study found that performance of Maintenance and Safety type projects had less cost and schedule growth among the data analyzed. Statistical tests also found that even though the projects have no change orders, Rehabilitation and Restoration type projects experienced significant schedule growth compared to others. However, the data did not show any significant cost and schedule growth for the projects when statistical tests were performed on overall data. The study concluded that highway projects are experiencing schedule growth even though the projects had no change orders. Results from the study can help planners, engineers, and administrators to gain better insight on how different types of highway projects are performing in terms of cost and schedule and eventually derive appropriate solutions to minimize cost and schedule growth in such projects.
For the relationship between conformance cost and the individual elements of non-conformance, an analysis was made of the relationship between inspection cost and training cost and scrap cost. As a result it was explained that there was all a positive correlation between training cost and scrap cost, and between inspection cost and scrap cost. Like this, training and inspection cost and scrap cost have a positive correlation. Judging from the fact that the coefficient of inspection cost is lower than that of training cost in the comparison of the coefficient of each cost, it can be analyzed that the change in scrap cost is influenced by the change in training cost more greatly than the change in inspection cost. If doing so, it can be interpreted that scrap cost and rework cost do not still decrease in spite of increasing in education and training cost and prevention cost. This result may represent the problem as to whether education and training cost is effectively expended for prevention activity. Accordingly, to cope with this situation, it is thought that scrap cost should be cut by establishing the effective prevention measure for causing the increase of scrap cost.
The purpose of this study is to analyze the cost-effectiveness of four medications for treating and preventing osteoporosis -HRT therapy(conjugated equine estrogen 0.625mg for 25 days and medroxyprogesterone acetate 5mg for 01112 days), Alendronate(10mg and 5mg), Active Vitamin D(Calcitriol), and Calcium. Total costs include the direct medical cost -examination fee, consultation fee, prescription fee, fee for preparing medications, and the price of pharmaceuticals- and the indirect cost of patients such as traffic expenses and time cost. In addition, the costs of monitoring in adverse reactions are added. The effects of four medications are expressed as BMD(Bone Mineral Density) percent change measured by DEXA(Dual Energy X-ray Absorptiometry) in lumbar spine(L2-L4) and femoral neck site. A mixed model based on meta analysis provides the estimates of effectiveness, which are then appled to the hypothetical cohort consisting of postmenopausal women at the age of 50-59. HRT therapy is the most cost-effective medication at 172,433.64 won (lumbar spine site) and 546,328.28 won (femoral neck site) per BMD percent change for osteoporosis. Alendronate 10mg is more cost-effective than Alendronate 5mg as 345,971.23 won and 378,441.63 won per lumbar BMD percent change at 0.991g/$cm^2$, respectively. Alendronate 10mg is more cost-effective than Alendronate 5mg as 1,329,257.89 won and 1,467,291.23 won per femoral neck BMD percent change at 0.834g/$cm^2$, respectively.
The author has intended to seek for the usefulness of price-level change accounting information through financial statements of general price level. The accounting information obtained from financial statements of general price level, must be useful to the reasonable judgment of financial statement users or to the economic decision making, This thesis may be summarized as follows : 1. Financial statements arranged by historical cost accompany many problems as accounting information. In other words, at the time of inflation, they have little usefulness as accounting information. 2. In order to correct the little usefulness of the financial statements arranged by historical cost, the author examined this matter centering around FASB statement No. 33. 3. The price level change accounting eliminates the contradiction of the accounting information obtained from the financial statements arranged by historical cost. 4. In the general price level change accounting, money value is presumed to change according to the level of general price and, then, the money value for goods must be revised. 5. In the general price level change accounting, the division between monetary items of asset and debt, and non-monetary items, is important. 6. The general price level change accounting based upon historical cost accounting, has objectivity as accounting information like the cost basis accounting and larger usefulness than the cost basis accounting. In conclusion, the price level change accounting increases its usefulness as accounting information and, therefore. (1) the information on the general price level change accounting is desirable to be disclosed as supplementary information for the traditional financial statements, and (2) the general price level change accounting should be induced to the listed Companies in Korea under continuing inflation for improving the usefulness of financial statements as accounting information.
기업의 상호는 기업의 성공적인 수많은 요인 중에서도 타기업과 경쟁기업을 차별화시키는 무형의 자산으로 기업의 이미지와 강하게 관련되어 있다고 볼 수 있다(Akerlof, 1970). 지금까지 상호변경에 관한 연구는 기업가치에 긍정적인 영향을 미친다는 연구와 부정적인 영향을 미치거나 영향을 미치지 않는다는 연구로 대별된다. 긍정적인 영향을 미친다는 연구는 상호변경이 투자자의 투자욕구에 영향을 미치거나 미래현금흐름에 대한 투자자의 기대를 변하게 하는 신호로 작용하여 기업가치가 증가한다는 것이다. 상호변경 자체가 기업 내외의 이해 관계자들에게 긍정적인 신호로 작용하여 기업의 미래가치를 높일 수 있고 이러한 신호효과가 신뢰성이 높다면 투자자들의 정보비용을 절감시켜 정보비대칭이 감소함으로서 내재자본비용의 감소를 가져올 수 있다. 한편, 반대되는 연구결과로 부정적인 성과를 오도하기 위해 상호를 변경하는 경우 시장에 악재로 작용할 수 있으며 도리어 상호변경에 수반되는 추가적인 비용으로 인하여 주가에 부정적인 영향을 미친다는 연구와 시장균형하에서 상호변경은 기업가치에 어떠한 영향도 미치지 않는다는 연구이다. 상호변경이 기업이미지 개선, 합병 등 과거와의 단절 및 기업이미지 세탁을 위하여 이루어진다면 상호변경 자체에 대해 투자자들은 조심스럽게 받아들일 수밖에 없다. 즉 시장의 관점에서 보면 기업의 상호변경에 대하여 기업의 내재가치 및 이와 관련된 정보의 비대칭성이 크다는 특성을 가지며 새로운 상호로의 교체가 위험을 의미한다면 상대적으로 기업과 기업외부의 이해관계자들과의 정보비대칭이 증가함으로서 정보위험에 대한 대가로 기업의 내재자본비용은 증가할 수밖에 없다. 이렇듯 현재까지 상반된 연구결과가 존재하는 상황에서 본 연구는 2005년부터 2010년까지 국내 유가증권시장 상장기업을 대상으로 상호변경이 내재자본비용에 미치는 영향을 분석한다. 분석결과, 상호변경은 내재자본비용에 유의적인 양(+)의 영향을 미치는 것으로 나타났다. 이러한 결과는 상호변경은 경영자와 외부투자자자간의 정보비대칭을 증가시키고 이에 대해 시장에서는 정보위험에 대한 추가적인 위험프리미엄을 요구한다고 볼 수 있다. 결과적으로 상호가 기업에 대한 인지도 및 신뢰성의 척도로 작용하여 상호변경이 투자자들의 정보비용을 절감시키는 효과보다 상호변경을 미래에 대한 불확실성이라는 위험으로 인지하여 추가적인 프리미엄을 요구하고 있는 것으로 나타났다.
Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
국제학술발표논문집
/
The 6th International Conference on Construction Engineering and Project Management
/
pp.371-375
/
2015
Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.
The 3th International Conference on Construction Engineering and Project Management
/
pp.203-211
/
2009
Korean public owners who order public multi-family housing construction projects have yet to gain access to a model for predicting construction cost. For this reason, their construction cost prediction is mainly dependent upon historic data and experience. In this paper, a cost-prediction model based on Case-Based Reasoning (CBR) in the design phase of public multi-family housing construction projects was developed. The developed model can determine the total construction cost by estimating the different Building, Civil, Mechanical, Electronic and Telecommunication, and Landscaping work costs. Model validation showed an accuracy of 97.56%, confirming the model's excellent viability. The developed model can thus be used to predict the construction cost to be shouldered by public owners before the design is completed. Moreover, any change orders during the design phase can be immediately applied to the model, and various construction costs by design alternative can be verified using this model. Therefore, it is expected that public owners can exercise effective design management by using the developed cost prediction model. The use of such an effective cost prediction model can enable the owners to accurately determine in advance the construction cost and prevent increase or decrease in cost arising from the design changes in the design phase, such as change order. The model can also prevent the untoward increase in the duration of the design phase as it can effectively control unnecessary change orders.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.