• 제목/요약/키워드: cost calculation

검색결과 1,040건 처리시간 0.03초

최적의 정비대체장비(M/F) 산출방안 비교 연구 (Study of Optimal Maintenance Float(M/F) Calculation Method)

  • 이학재;정광균;김재황;이종신;이명진
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제16권3호
    • /
    • pp.192-201
    • /
    • 2016
  • Purpose: In this paper, we propose the output model of the optimal inventory requirements of the Maintenance Float (M/F). Weapon systems were modernized and increased costs. Thus, the complexity increases with. Alternatives to achieve the goal of availability of weapon systems and to reduce life-cycle cost are required. Especially, securing spare parts is more effective than adding the amount of equipment or maintenance facilities to achieve the goal of availability and reduce life cycle costs. However, securing spare parts and repair costs are directly related, so exact requirements are needed. Methods: Three kinds of methods (Calculation method of applying the Poisson distribution, Calculation method of considering the number of CSP, and Calculation method of applying M&S program) that this paper proposed compare the influence of the availability and the amount of spare parts. Result: We calculate the cost of M/F when the operational availability is over than 80% and compare that result. The biggest cost was calculated from the Poisson distribution method. We found that requirements and unit price is the key factor that gives a significant effect. Conclusion: These three kinds of methods can be used as a basis for Maintenance Float calculation. Among them, the calculation method based on CSP is optimal replacement equipment requirements calculation method.

국가 및 전력회사의 관점에서 열병합발전의 편익산정에 관한 연구 (A Study on Calculation of Combined Heat and Power on Standpoint of Nation and Independent Power Producers)

  • 김용하;이평호;김영길;조현미;우성민
    • 전기학회논문지
    • /
    • 제60권5호
    • /
    • pp.905-912
    • /
    • 2011
  • In this paper, the method on calculating benefits of combined heat and power is introduced for standard evaluation in electrical power system. This paper calculates benefits about new national viewpoint and viewpoint of independent power producers and assesses benefits of combined heat and power in Korea and In Seoul national capital area. Benefit costs are composed of avoid cost of centralized generation, line upgrading adjustment, loss adjustment and electrical power trade cost per year in earlier study, in addition trade cost of $CO_2$, construction cost of combined heat and power for accurate calculation. Benefit of combined heat and power is calculated by simulation results of real electrical power system.

에너지 시스템에 대한 전력 및 열 비용산정 (Suggestion of Power and Heat Costing for an Energy System)

  • 김덕진
    • 설비공학논문집
    • /
    • 제15권5호
    • /
    • pp.360-371
    • /
    • 2003
  • The calculation of each unit cost of productions is very important for evaluating the economical efficiency and deciding the reasonable sale price. In the present, two methods of exergy costing on multiple energy systems are suggested to reduce the complexities of conventional SPECO method and MOPSA method and to improve the calculation efficiency of exergoeconomics. The suggested methods were applied to a gas-turbine cogeneration and the unit costs of the power and the steam energy were calculated as an example. The main points of our methods are the following three. First, one exergetic cost is applied to one cycle or system. Second, the suggested equations are the internal cost balance equation and the production cost balance equation. Third, necessary states in a system are only inlet and exit states of 1ha components producing energy.

부하의 전압특성을 고려한 모선별 전력품질 지표 및 가격 산정기법 (Power Quality Index and Cost based on Load-Voltage Characteristics)

  • 이근준
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권4호
    • /
    • pp.213-218
    • /
    • 2003
  • In front of the opening of electric distribution market in 2004, it is indispensable to have a proper estimation of power quality index and rower quality cost calculation mechanism which are indispensable to stabilize highly industrialized society and to vitalize the Investment lot electric power system. However, there were not enough measures to reflect the voltage characteristics such as voltage sags and Interruptions which make electric load in unstable operation. This paper suggests power quality index and power quality cost which translate various kinds of voltage records into bus load drop index(BLDI) and bus power quality cost(BPQC) based on aggregated load CBEMA curve. A sample calculation result shows that this method can produces the acceptable power Quality index and costs for utilities and customers requirements.

산업안전보건관리비 계상기준 개선방안 연구 (A Study on Improving the Occupational Safety and Health Management Cost Calculation Standards)

  • 안방율;송태석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.169-170
    • /
    • 2020
  • Occupational Safety and Health Management Cost, used to protect workers in Korean construction worksites and to create safe working environments, is a legally managed expense item. As this cost item is grounded on the Occupational Safety and Health Act, it is always implemented. However, because there is a ceiling on its rates, insufficient amounts of Safety Management Costs are often allocated to worksites, with the money not being used to areas essential to worker safety. As such, the current study raises the need to develop a set of standards to enable some items under the Occupational Safety and Health Management Costs-appropriated under the rate of indirect costs-to be appropriated as direct construction costs. As a preliminary step in this effort, the current study will provide basic data that can be used to create construction cost calculation standards for items that can be calculated as direct construction costs.

  • PDF

BIM기반 확률론적 GMP 산정방안에 관한 연구 (Probabilistic GMP Calculation Method based on BIM)

  • 고건호;김정훈;김현주;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.122-123
    • /
    • 2018
  • Recently, CM at Risk delivery system(CM@R) that could solve the problems of Design Bid Build delivery(DBB) system has been emerging. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the contractor carries out the construction within the GMP. In CM @ R, the construction company with expertise in construction participates from the design stage to reflects the construction know-how in the design. On the other hand, the modification design frequently occurs due to the change of the construction cost when negotiating the GMP. In addition, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. This study proposes a probabilistic GMP estimation method applying MCS to the BIM - based cost prediction model, in order to extract the accurate quantity information when estimating the GMP and to cope with the change of the construction cost inherent in uncertainty.

  • PDF

LNG내부탱크 Stiffener 판재 비용의 최소화 분석 연구 (Study on the Lowest Cost Analysis of Steel Plates for Stiffener Installed on the Side Wall of LNG Tank)

  • 윤상국
    • 한국가스학회지
    • /
    • 제18권2호
    • /
    • pp.81-86
    • /
    • 2014
  • 대형 LNG 내부 탱크의 내측 벽체에 가설되는 스티프너의 제작에 있어 판재 비용을 최소화하기 위하여 다양한 스티프너 규격에 따른 원 판재의 소요 중량과 비용을 분석하였다. 이를 위하여 판재 물량 산정 프로그램을 개발하여 자동화함으로써 설계자가 수작업으로 수행하는 물량 산정을 작업시간의 단축과 함께, 다양한 중량과 비용의 분석이 가능하도록 하였다. 분석결과, 판재 폭이 큰 것을 사용할수록 스티프너를 제작하는데 사용되는 원 판재의 총 소요개수, 중량 및 비용이 감소하였으나, 최적의 LNG탱크용 스티프너 판재 폭을 결정하기 위해서는 소요 판재의 중량과 함께 비용의 분석이 필요하였다.

A STUDY ON THE LIFE CYCLE COST ANALYSIS IN LIGHT RAIL TRANSIT BRIDGES: FOCUSED ON SUPERSTRUCTURE

  • Lee Du-heon;Kim Kyoon-tai;Kim Hyun Bae;Jun Jin-taek;Han Choong-hee
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.30-40
    • /
    • 2007
  • The demand for light-rail construction projects has recently been increasing, and they are mostly supervised by private construction companies. Therefore, a private construction company that aim to raise gains from the operation of the facilities during the contract period greater than what they invested should b able to accurately calculate the costs from the aspect of Life Cycle Cost (LCC). In particular, a light-rail transit bridge that has a heavier portion from the aspect of the cost of light-rail transit construction requires a more accurate calculation method than the conventional LCC calculation method. For this, an LCC analysis model was developed and a cost breakdown structure was suggested based on literature review. The construction costs by shape of the upper part of a light-rail transit were calculated based on the cost breakdown system presented in this paper, and the cost generation cycle and cost unit price were collected and analyzed based on records on maintenance costs, rehabilitation and replacement. In addition, after forming some hypotheses in order to perform the LCC analysis, economic evaluation was conducted from the aspect of the LCC by using performance data by item.

  • PDF

2D 도면 인식을 통한 부재 물량 산출 자동화 기술 개발 (Development of Automation Technology for Structural Members Quantity Calculation through 2D Drawing Recognition)

  • 선우효빈;최고훈;허석재
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.227-228
    • /
    • 2022
  • In order to achieve the goal of cost management, which is one of the three major management goals of building production, this paper introduces an approximate cost estimating automation technology in the design stage as the importance of predicting construction costs increases. BIM is used for accurate estimating, and the quantity of structural members and finishing materials is calculated by creating a 3D model of the actual building. However, only 2D basic design drawings are provided when making an estimating. Therefore, for accurate quantity calculation, digitization of 2D drawings is required. Therefore, this research calculates the quantity of concrete structural members by calculating the area for the recognition area through 2D drawing recognition technology incorporating computer vision. It is judged that the development technology of this research can be used as an important decision-making tool when predicting the construction cost in the design stage. In addition, it is expected that 3D modeling automation and 3D structural analysis will be possible through the digitization of 2D drawings.

  • PDF

Genetic Algorithm을 이용한 상수관망의 최적설계: (I) -비용 최적화를 중심으로- (Optimal Design of Water Distribution Networks using the Genetic Algorithms: (I) -Cost optimization-)

  • 신현곤;박희경
    • 상하수도학회지
    • /
    • 제12권1호
    • /
    • pp.70-80
    • /
    • 1998
  • Many algorithms to find a minimum cost design of water distribution network (WDN) have been developed during the last decades. Most of them have tried to optimize cost only while satisfying other constraining conditions. For this, a certain degree of simplification is required in their calculation process which inevitably limits the real application of the algorithms, especially, to large networks. In this paper, an optimum design method using the Genetic Algorithms (GA) is developed which is designed to increase the applicability, especially for the real world large WDN. The increased to applicability is due to the inherent characteristics of GA consisting of selection, reproduction, crossover and mutation. Just for illustration, the GA method is applied to find an optimal solution of the New York City water supply tunnel. For the calculation, the parameter of population size and generation number is fixed to 100 and the probability of crossover is 0.7, the probability of mutation is 0.01. The yielded optimal design is found to be superior to the least cost design obtained from the Linear Program method by $4.276 million.

  • PDF