• Title/Summary/Keyword: cost calculation

Search Result 1,033, Processing Time 0.025 seconds

A Study on the Calculation of Construction Project Cost of Healthcare Facility Business Plan (의료시설 사업계획서의 건축사업비 산정에 관한 연구)

  • Choi, Kwangseok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.27 no.2
    • /
    • pp.7-14
    • /
    • 2021
  • Purpose: The purpose of this study is to provide an effective construction project cost estimation tool for preparing a business plan of healthcare facilities which can be practically used for development projects. Methods: In order to provide a tool for calculating construction project costs, this study analyzed the Building and Related Laws, the Building Technology Promotion Laws, the Ministry of Land, Infrastructure and Transport notifications and directives, the Ministry of Trade, Industry and Energy notifications, the detailed guidelines of the Ministry of Strategy and Finance, the Building Service Industry Promotion Acts, various certification standards, actual project budget calculation cases, etc. with advices from related experts. Results: 1) Construction cost is classified into construction costs, architectural design costs, supervision costs, incidental costs, and each sub-element. In particular, since there are many incidental cost items, essential items to be reviewed during planning are derived and costs are calculated according to appropriate consideration criteria. 2) Criteria for Payment calculation mainly applies the construction cost rate method or the actual cost fixed amount method in consideration of the characteristics and scope of work. Implications: There are many calculation factors that need to be applied to the construction project cost. Therefore, it is necessary to organize the calculation process more clearly.

TDABC Application Case Study of Compounding Company: TDABC Application and Improvement of Profitability of Company K (컴파운딩 업체의 TDABC 적용사례 연구: K사 TDABC 적용 및 수익성 개선)

  • Dae-Young Lyu;Sung-Wook Yi
    • Asia-Pacific Journal of Business
    • /
    • v.14 no.2
    • /
    • pp.101-118
    • /
    • 2023
  • Purpose - The purpose of this study is to find out how a company can do reasonable cost calculations in a simple way and establish profitability improvement strategies based on the results. Design/methodology/approach - In this study, a case that compounding company K applied TDABC was studied. A case study was conducted on the process of company K reviewing and applying TDABC and the process of implementing the cost calculation for each product by applying TDABC, and establishing a profitability improvement strategy for each product based on the results. Findings - Company K rearranged the production standard information of the compounding industry such as productivity and batch size of each product to apply TDABC. Cost calculation was performed for each product according to the revised production standard information. After the cost calculation for each product was carried out, Company K established a strategy to improve profitability of each product. The profitability improvement strategy was implemented in two ways: a cost reduction strategy and a product price increase strategy. As a result of the final strategy execution, the profitability of each product was improved. Research implications or Originality - This study found a reasonable costing standard in consideration of the specificity of the research target company, and applied it to cost calculation cost for each product. It contains the process of establishing production and sales strategies for each product based on the cost calculation results. It is expected that this case study will serve as a good reference material for establishing cost calculation and profitability improvement strategies in similar businesses.

A Study on Calculation of Recycling Standard Cost for Efficient Operation of EPR (효율적인 EPR 운영을 위한 재활용 기준비용 산정에 관한 연구)

  • Lee, Hee-Nahm;Choi, Yoon-Jeong
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.1
    • /
    • pp.121-126
    • /
    • 2011
  • The provisions regarding the standard cost for recycling stated under the Extended Producer Responsibility (EPR) since 2002, include different and complicated obligatory steps to be taken on a variety of subject items regarding the collection, the transportation and the treatment, making the corporations face in their calculating and executing the standard cost. This study presents more objective calculation scope and standard for the purpose of efficient operation of the standard cost for recycling, in consideration of the general industry perception toward cost issue as well as domestic/overseas case studies regarding the standard cost for recycling. Besides, the study presents the checking items and the calculation contents per step to calculate the standard cost for recycling. Therefore, it is expected not only to be used as the objective standard to calculate the standard cost for recycling, but also to contribute to increasing the work efficiency in the following ongoing re-calculation process and to maintaining the consistent operation of the institution.

Calculation of Transmission Cost for Power Sales District Office based on KEPCO Data (실계통자료를 이용한 판매사업소별 송전비용의 계산)

  • NamKung, J.Y.;Moon, Y.H.;Oh, T.K.
    • Proceedings of the KIEE Conference
    • /
    • 2001.11b
    • /
    • pp.266-268
    • /
    • 2001
  • As we move to competition, transmission cost become more and more important. At the wholesale competition market, the process of settlement must include the cost of transport. The aim of this paper is to calculate approximate transmission cost at each power sales district office using KEPCO data. We considered investment cost, transmission constraints and marginal losses as cost elements which must be taken into account in transmission cost calculation.

  • PDF

Essay on the Calculation of Appropriate Working Environment Measurement Fees (적정 작업환경측정수수료 산정을 위한 소고)

  • Park, Ji-Yeon
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.31 no.3
    • /
    • pp.274-285
    • /
    • 2021
  • Objectives: The question of whether the level of fees paid to working environment measurement agencies is appropriate has long been a matter of concern to the government. In addition, measurement institutions express dissatisfaction with their level of compensation, which has a great influence on the evaluation of a subject's policy. This study is intended to find a way to appropriately calculate working environment measurement fees. Methods: We looked at the principle of fee determination as a basic theory of fee calculation used in fee calculation, the legal and academic aspects of the general method of fee calculation, and government cost calculation standards. Furthermore, we reviewed the research methods applied so far to derive a method of calculating fees appropriate for this environment. Results: The working environment measurement environment is different from other commission calculation environments. The other environment is to appropriately calculate the service price provided by a monopoly public enterprise, while the situation is to appropriately calculate the fees provided by competitive private enterprises. Therefore, the service delivery environment and the delivery entity are different. In this case, the appropriate method of calculating service fees would be competitive pricing. There have also been many problems under the method of calculation by service cost. Conclusions: First, the working environment measurement fee requires an accounting correction of endogenous variables. Second, the theory of calculating fees appropriate for this situation is appropriate for competitive pricing that applies to private competitors. Third, the government should make efforts to make the service supply market a fully competitive market while ensuring that the service fee level is determined at the marginal cost level. Fourth, economically, research on marginal cost levels is needed.

A Study on Re-calculation of Recycling Standard Cost through the Analysis on Standard Cost (표준원가 분석을 통한 재활용 기준비용 재산정에 관한 연구)

  • Lee, Hee-Nahm;Choi, Yoon-Jeong
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.1
    • /
    • pp.189-193
    • /
    • 2011
  • The current standard cost for recycling applied under the Extended Producer Responsibility(EPR) institution, is not coping with continuously increased number of obligatory subject items as well as a variety of variable cost changing factors regarding the recycling treatment cost caused by price fluctuation such as increased material and labor cost entirely across the society; changes in recycling treatment process following the developing technologies; and changes in the required work forces and equipments followed by the trends of automated facilities. Despite such various cost fluctuation factors, the current EPR is not coping with the trends, making the re-calculation process difficult, which causes differences between the real treatment cost for recycling. In this study, the analysis was made on main factors affecting on the related cost and the related price changing index was calculated, by conducting the influence evaluation on the standard cost factors of the current standard cost for recycling. Through theses results, more objective standard will be set for the re-calculation of standard cost for recycling to greatly contribute to setting up the midterm and long-term strategies in the future towards efficient institution.

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

Safety Management Cost Accounting for Underground Electric Power Transmission Facility Construction (전력구 설치 공사의 안전관리비 계상 기준에 관한 연구 )

  • Min Ho, Kim;Sung Woo, Shin
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.6
    • /
    • pp.50-59
    • /
    • 2022
  • In the Construction Technology Promotion Act (CTPA) of the Republic of Korea, safety management cost is enforced as a statutory cost that must be included in the budget of construction projects. However, the construction of underground electric power transmission facilities (UEPTFs) is not included in the category of construction works defined in the CTPA. Consequently, the statutory safety management cost does not apply to the construction of UEPTFs. To overcome this limitation, the clients of UEPTF construction projects generally provide internal guidelines enabling the addition of the safety management cost in the project budget. Nevertheless, even after the execution of the internal guidelines, some important cost items are omitted from the budget owing to the incompleteness of the guidelines. In this context, this paper proposes a complete set of accounting items and their calculation methods for appropriate budgeting of the safety management cost of UEPTF construction projects. To this end, the current budgeting method of the safety management cost of UEPTF construction projects is analyzed, and a questionnaire study is performed to confirm the necessary cost items and their appropriate calculation methods. Based on the results of the questionnaire study, a set of accounting items and their calculation criteria for the budgeting of the safety management cost of UEPTF construction projects are proposed.

Improvement of the Calculation Standard for Prolongation cost of Domestic Public Construction Project (국내 공공 공사 공기연장 간접비 산정 기준 개선방안 - 국가계약법 및 지방계약법 산정기준의 비교 고찰 -)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.95-102
    • /
    • 2016
  • Recently, a research regarding calculation of construction time extension-oriented incidental costs has been intensively suggested in quantitative aspect and recent studies on system improvement has been made continuously. In the case of Domestic Public Construction Works, State Contract Act is applied when the client is government whereas Local Government Contract Act is done when the client is local government, but more meticulous study is required because improvement plan is not proposed even there is a clear demand for improvement of these problems on calculation standard. Thus this study suggested appropriate standard by comparing each the calculation standards followed by 'State Contract Act' and 'Local Government Contract Act', considering the problems accorded, and analyzing field cases. Calculation method of other expenses was differently regulated as the revision of each regulation, and this demonstrates that there is a difference of actual cost from 12.37% to 24.95%. It is shown that less cost of construction time were calculated than actual cost according to a problem of calculation method by State Contract Act as the rate at the time of contract to be applied in other expense rate. This study suggested the rate against incidental cost and the rate of other expense per day against total construction cost as an appropriate rate calculation for other expense based on field database.

Calculation of the generator cost functions using the utilization factor of generators and the mixed fuel burning ratio of the generators (이용율과 혼소율을 이용한 발전기의 입출력 특성식 산정)

  • Song, Kyung-Bin;Nam, Jae-Hyun;Park, Si-Woo
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1270-1272
    • /
    • 1999
  • The generator cost function is one of the basic data for the generation scheduling. Generally the cost functions are obtained form design calculations or from heat rate tests. The real operating condition may be different from the condition of design or the tests. Some of the conditions may not be tested during the periodical maintenance. In order to improve the calculation of the generator cost function, this paper presents a new calculation method of the generator cost functions using the utilization factors of generators and the mixed fuel burning ratio of the generators.

  • PDF