Direction of CM Services Defect Liability in the CM Contract

  • Cho, Young-Jun
    • 한국건축시공학회지
    • /
    • 제13권3호
    • /
    • pp.209-217
    • /
    • 2013
  • The execution of a construction project involves the engagement of many participants. Generally, the Authority uses CM to certify that the Work is built according to the contract documents. The CM work scope is expressed in the Construction Technology Management Act and its Regulation. The mandated and delegated CM services are limited to the construction period. If Contractor is required to repair a construction defect, the Contractor should bear the burden of the inspection service for the defect repair, because it is associated with him. Nevertheless, CM should submit a bond to provide the inspection and supervision service for the defect repair. These may result in conflict with each liability. Therefore, CM service in the law and regulation was investigated and analyzed in this study to classify the characteristics of CM contracts, and it was suggested that the CM liability for the inspection and supervision service for the defect repair should be reconsidered.

지역 소규모 환경건설회사의 제출/승인 절차 분석에 관한 사례 연구 (Analysis on the submittal process for a small local environmental construction company: a case study)

  • 이도균
    • 도시과학
    • /
    • 제6권2호
    • /
    • pp.73-80
    • /
    • 2017
  • A submittal, as a part of three main project management processes: production control, submittals and change orders, is the transmission of information from the subcontractor to the general contractor to the owner, architect, and structural engineer, for review and approval. The purpose of the submittal process is for submittals to be approved in order to start construction. This benefits the contractor by ensuring that the finished project will meet the expectations of the owner. This paper analyzed a case study regarding the submittal process for the local-based environmental construction company, which typically works as a subcontractor and may hire other subcontractors for additional work when applicable. The aim of this study was to roughly evaluate a project management process and understand the submittal process through the study of a case involving the local company.

  • PDF

Firms' Diversification Strategy and Long-Term Performance

  • 최종수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.88-95
    • /
    • 2003
  • A firm's business composition and the sales volume of each business segment are subject to change depending, to a considerable extent, on the firm's business strategy. These changes were weighted and represented as a single index, referred to by scholars in strategic management and industrial organization research fields as 'firm entropy' then its impact on firms' profitability was assessed over twelve years. The performance differences between contractor and non-contractor firms, as well as focused and diversified firms, were compared through a Longitudinal Data Analysis Technique within a Hierarchical Linear Modeling framework. Hypothesis was formulated based on firm diversification theories and previous research findings. The hypothesis was tested according to the modeling outcomes, and implications are presented. The research findings indicate that the level of firms' long-term profitability supports the argument that the construction industry is highly competitive and mature.

  • PDF

공공건설사업에서의 사전분쟁해결(ADR)방법 도입방안 (A Suggestion of the ADR in Public Construction Disputes)

  • 조영준
    • 한국콘텐츠학회:학술대회논문집
    • /
    • 한국콘텐츠학회 2006년도 춘계 종합학술대회 논문집
    • /
    • pp.356-359
    • /
    • 2006
  • 건설공사를 수행하는 도중에 건설분쟁을 거의 필연적으로 발생하고 있다. 이러한 건설분쟁이 발생하게 되면 계약당사자들은 심각한 어려움에 처해질 수 있다. 발주자의 경우 시공자가 청구하는 비용을 제대로 지급하지 않을 경우 부실공사로 이어지지 않을까 염려하게 되고, 시공자의 경우 추가공사를 했는데도 제대로 대가를 받을 수 없는 것이 아닌지 염려하게 되는 현상이 발생하게 된다. 이러한 문제를 해소하기 위해서는 건설분쟁이 발생하였을 때 장기화시키는 것이 아니라 조속히 우선 해결하도록 할 필요가 있고, 이에 본 연구에서는 공공건설사업에서 ADR(DAB: Dispute Ajudication Board))의 적용방안을 제시하였다.

  • PDF

CITIS 시스템의 프로토타입 개발 방안 - 웹 개발 도구 사용을 중심으로 - (A Study on the Development of CITIS System Prototype - Using a Web Development Tool -)

  • 박정선;김성희
    • 한국전자거래학회지
    • /
    • 제2권1호
    • /
    • pp.117-129
    • /
    • 1997
  • As the lifecycle of a product becomes shorter, the communication between a contractor and a supplier in product information has got more importance. The CITIS(Contractor Integrated Technical Information Service) is required to provide authorized users with access to both data and applications they need to complete a task for contract. With the growth of WWW, there has been much study for the use of WWW for the implementation of CALS. The WWW has been proved as an efficient tool for CALS implementation due to its of publicity, openness, and free accessibility. In this study, we suggest using WWW tools, here, an intranet tool, as a basis for the implementation of CITIS

  • PDF

On-Site Manpower Increasing Impact on Labor Productivity

  • Chang, Chul-Ki
    • 한국건설관리학회논문집
    • /
    • 제6권5호
    • /
    • pp.139-147
    • /
    • 2005
  • During a typical construction project, a contractor nay often find that the time originally available or normally expected to perform its work has been severely reduced. To finish the project by the completion date, the contractor is forced to find a way to speed up the progress of its work to compensate for the reduction in available time. The most frequent initial reaction of contractors to this situation is to increase on-site manpower by working longer time (overtime), adding more workers (overmanning), or implementing shift work (shift work) to increase the rate of progress. The goals of this study were to investigate how these three methods affect labor productivity and to quantify their impact on labor productivity by analyzing real project data collected from sheet metal contractors and mechanical contractors in the US.

건설현장 공사주체간 위험성관리의식의 중요도 설정에 관한 연구 (Weighting Factor of Consciousness between Main and Sub Contractor for Establishing an Effective Risk Management in Construction Industry)

  • 손기상;은남권
    • 한국안전학회지
    • /
    • 제28권4호
    • /
    • pp.72-80
    • /
    • 2013
  • Accident prevention plan it a construction site should be analyzed and made with risk evaluation and management, from recent year, in Korea. Accidents occurred in construction site are related to all parties such as owner, main and subcontractor, labour. But analyzing some relationship between main and subcontractor is very important to estimate what risk between then are existed in a site. There are some different aspects concerning with risk management between them. Everywork has its own risk in there, This is the reason why everywork which are made by subcontractor himself should be evaluated for risk level. And main contractor should provide for subcontractor to prevent each risk at the work, all the time.

친환경 건설장비 선정을 위한 체크리스트 (Checklist for Green Construction Equipment Selection)

  • 원명균;이명도;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.141-142
    • /
    • 2012
  • Using green construction equipment, there are some disadvantages like increasing construction costs and delaying the schedule. Despites of disadvantages, green construction equipment is necessary for decreasing environmental load in construction industry. Therefore, this study proposed checklist for green construction equipment selection. For the checklists, criteria of the checklist were drawn by literature review in the aspects of contractor and a survey was performed in order to measure weights of the criteria. When a contractor choose the green construction equipment, this checklist can support an objective decision-making.

  • PDF

보다 나은 건축을 위한 과제들 -시장개방과 우리 건축의 문제점들- (Subjects for the Better Architecture)

  • 이학영
    • 기술사
    • /
    • 제30권2호
    • /
    • pp.52-60
    • /
    • 1997
  • As a matter of fact, the better architecture is very important things to create our generation and culture. Also, construction quality improvement is critical necessary to keep the culture and international competition which must be obtained through the consciousness reform of persons concerned. Therefore, the purpose of this proposal is to provide the basic point for establishing a practical compaign against construction failures. In this year, we have to remember the facts that's faced on market opening in construction market which is agreed in WTO. The contents of subject are as follows : 1 ) Subconscious reform of technician and projector concerned 2) Responsable consciousness of original contractor 3) Workmanship of skilled labor 4) Reasonable budget and bidding included sub-contractor 5) Advanced design and engineering quality 6) Certification of consulting engineer

  • PDF

An Experimental Study on Resisting Force of Scaffolding Frames using Buckled Pipe

  • Na, Young-Chan;Son, Ki-Sang
    • International Journal of Safety
    • /
    • 제5권2호
    • /
    • pp.24-28
    • /
    • 2006
  • There are many structural problems when the scaffolding frame is applied to a construction site contractor may use a used pipe or buckled pipe which they lended them from commercial firms without any inspection of those materials even though they have been used and exposed to weather for a long times. Therefore, they should be checked of their current capacity, comparing with the original one so that construction contractor can apply their capacity to a temporary frame depending on the site situation against collapsion of those. This study is mainly focused on the behavior of a scaffolding frame using prebuckled pipes. Additionally, standard frame with bracing and without bracing case are also tested for comparing with the prebuckled case. Prebuckled case has its capacity less approximately 20 % than the standard frame.