• 제목/요약/키워드: contractor

검색결과 537건 처리시간 0.027초

A Fuzzy AHP Model for Selection of Consultant Contractor in Bidding Phase in Vietnam

  • Ha, Tran Thanh;Hoai, Long Le;Lee, Young Dai
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권2호
    • /
    • pp.35-43
    • /
    • 2015
  • Project Management Consultant (PMC) plays a vital role in the overall performance of any project. Selecting right PMC for right project is the most crucial challenge for any construction owner. Thus, PMC selection is one of the main decisions made by owners at the early phase of construction project. It is not easy for the project owner to select a competent PMC due to the fuzziness, imprecision, vagueness, incomplete and qualitative criteria of the decision. This paper presents a model for selecting PMC contractor using the Fuzzy Analytical Hierarchy Process (FAHP). And a fuzzy number based framework is proposed to be a viable method for PMC contractor selection. A case study to illustrate the application of the model is also presented in this paper.

전문건설업체와의 상생협력을 위한 일반건설업체의 재무지원 분석틀 개발에 관한 연구 (Analysis Framework of General Contractors' Financial Supports for Specialty Contractors)

  • 이상옥;김한수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.459-462
    • /
    • 2008
  • 건설산업의 지속적 발전과 상생을 위해 일반건설업체와 전문건설업체의 파트너링 형성이 절실히 요구되고 있다. 일반건설업체에서는 협력사와의 상생협력을 위해 다양한 지원활동을 펼치고 있으며, 특히 재무지원이 가장 효과적인 지원으로 주목받고 있다. 본 연구의 목적은 전문건설업체와의 상생협력을 위한 일반건설업체의 재무지원 현황 및 특징을 분석하기 위해 사용될 수 있는 분석 기본틀(analysis framework)을 개발하는데 있다.

  • PDF

CITIS(Contractor Integrated Technical Information Services)구현에 관한 연구 (A Study on the Development of CITIS(Contractor Integrated Technical Information Services))

  • 정석찬;우훈식;조장혁;백종명;주경준
    • 산업공학
    • /
    • 제10권3호
    • /
    • pp.1-10
    • /
    • 1997
  • CALS, being widely adopted by industry, is a strategy to share integrated digital product data through a set of standards to achieve effieciencies and competition in business. For CALS implemetation, creating a shared information system is necessary and CITIS is proposed for that. CITIS shall provide on-line access and automated exchange of all the technical information between contractor and service provider, and the function of CITIS is difined in MIL-STD-974. In this paper, regarding CITIS as a infrastructure of information for CALS, we proposed CITIS server system which comprise global data sharing software, global data management system, workflow manager, and configuration management maneger.

  • PDF

Assessing Contractor Competition in Competitive Bidding for Highway Construction Projects Using Network Analysis

  • Le, Chau;Arya, Minakshi;Moriyani, Muhammad Ali;Le, Tuyen
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.18-24
    • /
    • 2022
  • State highway agencies (SHAs) typically apply a competitive procurement procedure to select contractors for their design-bid-build projects. Since the level of competition affects construction bid prices and project outcomes, the Federal Highway Agency (FHWA) suggests SHAs seek ways to improve competition among contractors continuously. However, they rarely conduct an empirical assessment of the current competition level necessary to identify room for improvement. Besides the number of bidders on a project, other factors such as winning or losing rates among the contractors in previous projects can also indicate the degree of competition; only a few contractors may have won the majority of the projects in a specific region. However, few studies have investigated such factors. This paper proposes a network analysis-based approach to evaluating contractor competition levels of highway projects using historical bid tabulation data. The proposed method provides insights into overall competition levels, the determination of competitive contractors, and winning rate distribution among contractors.

  • PDF

Development of Review Processes and Tools for Liquidated Damages for EPC/Turnkey Project: Contractor's Perspective

  • Hahn, Ki Jeong;Lee, Eul-Bum;Kim, Young Ho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.718-719
    • /
    • 2015
  • As a recent global trend, the majority of plant projects are delivered through EPC or EPC-turnkey contracts, where a contractor's liability is more complicated because of the mega size scale and financing method. Previous researches have been lacking a practical usability for project members for liabilities of contracts. Those were focused on solving the claims or schedule calculation issues only. The objective of the present study was to develop a validation process for LDs (liquidated damages) in contractor's liabilities with various case studies and expert judgments. As summarized in this paper, the processes and tools were developed with project life cycle process. The project preparation phase includes 3 step check lists to determine the Go or No-go for projects. In progress phase, contractors should focus on the response strategies for claims with liabilities. The study concludes that those developed processes and tools will help to manage risk of LDs for the contractors in the overseas projects.

  • PDF

건설산업 생산체계 개편에 따른 건설보증시장 변화 예측 조사 (Prediction Survey on Construction Guarantee Market Due to the Restructuring of the Construction Industry's Production System)

  • 김성일;장철기;유현지
    • 한국건설관리학회논문집
    • /
    • 제22권1호
    • /
    • pp.63-71
    • /
    • 2021
  • 건설보증시장은 건설산업 및 건설시장의 변화에 영향을 받는 후방시장으로서의 특성을 갖고 있다. 최근 종합건설업체와 전문건설업체간의 업역 규제가 폐지되는 등 건설산업 생산체계의 대대적 개편이 추진됨에 따라 건설시장 뿐만 아니라 건설보증시장에도 큰 변화가 예상된다. 건설보증시장에는 현재 업역과 업종을 기반으로 구분된 종합·전문·기계설비의 3개 공제조합이 운영되고 있다. 업역이 폐지되고 나면 3개 공제조합 간 경쟁구조가 형성되는 등 건설보증시장에 여러 영향을 미칠 것이고, 따라서 시장 변화에 따라 건설보증기관의 역할에도 변화가 필요하다. 본 연구는 건설산업 생산체계 개편이 건설보증시장에 불러올 변화를 분석·예측하고, 건설보증시장에 미치는 파급효과를 분석하였다. '건설산업 생산체계 개편안'과 건설보증 관련 법령 및 제도· 정책, 건설 보증기관 관련 통계자료를 검토하여 건설보증시장의 현황을 파악하고, 3개 공제 조합원을 대상으로 설문조사를 수행하여 시장 참여자의 보증기관 이용 행태를 분석하였다. 생산체계 개편 후 보증시장 변화를 살펴보면, 기계설비 조합원의 타 보증기관 이용 의향이 가장 높으며, 종합과 전문 조합원은 경쟁 확대에도 불구하고 기존 공제조합을 이용, 타 이용기관을 중복으로 이용하는 조합원들이 많을 것으로 예상된다.

PKI 를 이용한 CITIS 사용자 인증 시스템 (A Certification System Using PKI for CITIS Users)

  • 정우필;박정선
    • 대한산업공학회지
    • /
    • 제26권4호
    • /
    • pp.411-420
    • /
    • 2000
  • Among the standards of CALS, CITIS(Contractor Integrated Technical Information Service) is a standard in information share procedure which manages all data and services occurred between a contractor and a purchaser. CITIS services have some security problems like authentication problem and repudiation problem, when they are implemented using the Internet. To solve these problems, CITIS needs a user certificate system which can allow to access important information only to qualified users. This paper proposed a PKI(Public Key Infrastructure) Certificate Authority for CITIS, and created a real User Certificate System which can be adjusted to circumstances of real CITIS.

  • PDF

공공건설사업의 하자에 대한 수급인의 책임에 관한 연구 (A Study on the Contractor's Liability for the Defects in the Public Construction Works)

  • 조영준;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.46-53
    • /
    • 2002
  • 건설사업에서 공공건설사업은 국가계약법령에 의해 집행되고 있고, 계약유형으로 볼 때 도급, 위임, 고용 등 복합적인 계약성질을 띠고 있으므로, 수급인의 하자책임을 단일화하여 규정하는 것이 쉽지 않다. 이로 인해 계약이행중 발생하는 불완전이행과 목적물 인수 후 발생하는 하자에 대한 수급인의 책임에 대한 적용 및 해석은 어려운 작업이 되어 왔다. 그리고 불완전이행이나 하자에 대한 연구는 활성화되지 못하였고, 불완전이행이나 하자관련 분쟁이 발생하게 될 경우 당사자 일방이 포기하거나 일반론적으로 접근하여 본질적인 문제해결을 이루지 못하였다. 따라서 공공건설사업에 있어서 수급인의 하자책임에 대해 심층적으로 고찰할 필요성이 있다. 이러한 문제점을 인식하여 본 연구에서는 건설공사의 하자나 불완전이행은 제조물책임법에서 규정하는 결함과는 다르므로 국내외 수급인의 하자책임에 대해 고찰한 후, 우리나라 국가계약법령에 근거한 수급인의 불완전이행 및 하자책임을 분석하여 문제점을 도출한 후 개선방안을 항목별로 도출하였다.

  • PDF