• Title/Summary/Keyword: contract method

Search Result 532, Processing Time 0.024 seconds

The Influence of Contract.Relax Exercise on Functional Leg Length Inequality and Muscle Activity (수축-이완 운동이 기능적 하지길이 불균형과 하지 근활성도에 미치는 영향)

  • Gong, Won-Tae;Han, Jin-Tae;Ro, Hyo-Lyun
    • The Journal of Korean Physical Therapy
    • /
    • v.21 no.1
    • /
    • pp.49-55
    • /
    • 2009
  • Purpose: The purpose of this study was to evaluate influence of contract-relax exercise on functional leg length inequality (FLLI) and muscle activity. Methods: The subjects were consisted of 40 healthy adults who had FLLI of which degree was at least 10mm. All subjects were randomly assigned to two groups : Contract-Relax Exercise (CRE) group (n=20), control group (n=20). The experimental group underwent CRE for 3 times a week for 4 weeks. Myosystem 1200 was used to measure the activity of rectus femoris and hamstring muscle. The tape measure method was used to measure FLLI. Statistical analysis was used repeated ANOVA know comparison of period, independent T-est know comparison of experiment group and control group. Results: All measurements for each subject took the following test : pre-test, post-test in 2 weeks, post-test in 4 weeks. The FLLI of the experimental group was significantly reduced according to within intervention period (p<0.05). Rectus femoris and hamstring muscle activity of the experimental group was significantly increased (p<0.05). Conclusion: The CRE can reduce FLLI and increase rectus femoris and hamstring muscle activity. Various contract-relax exercise for reduced of FLLI and the methods should be customized for the patients.

  • PDF

Qualitative Research to Understand Environmental Factors of Customer, Foodservice Management, and Competitor and Factors that Improve Customer Quality of Life (질적 연구를 활용한 위탁급식 고객, 급식관리자 및 경쟁자 환경요인과 삶의 질 개선요인 도출)

  • Lee, Jin Young;Han, Kyung Soo
    • Journal of the Korean Society of Food Culture
    • /
    • v.30 no.5
    • /
    • pp.621-628
    • /
    • 2015
  • The objective of the current study was to analyze the major factors affecting quality of life improvement for contract foodservice customers by identifying the contract foodservice environment consisting of the customer, foodservice management, and competitor. Qualitative research method was performed on foodservice customers and foodservice management using in-depth interviews. First, the customer environment was classified into three categories, including convenience of location, foodservice management environment into six categories, including comfort level of dining facility, and competitor environment into three categories, including service competition between foodservice providers. Second, quality of life was defined as the level of contentment felt by both the customer and foodservice management consuming the food provided. Third, both the customer and foodservice management perceived that the management environment of contract foodservice had a "medium" effect on quality of customer life. The findings of this study could be applicable for development of a contract foodservice business strategy through objective comparative analysis of the customer, foodservice management, and competitor environments.

Effects of Short-term Application of Contract-Relax and Passive Stretching on the Length Adaptation in Harmstring Muscles (수축-이완과 수동신장 기법의 단기 적용이 슬괵근의 길이 적응에 미치는 영향)

  • Song, Ju-young;Kim, Su-min
    • PNF and Movement
    • /
    • v.1 no.1
    • /
    • pp.11-18
    • /
    • 2003
  • Objectives: Few studies have reported on the flexibility of the hamstrings resulting from variable stretching method, and little studies of length adaptation at 1 day after intervention. Methods: Fifty-four healthy a woman in her twenties with no history of musculoskeletal or neurogenic disorder volunteered for this study. Subjects were randomly assigned to either a contract-relax group or a passive stretching group. Methods: Hamstring flexibility was measured with a sit and reach test(SRT) (RF-D18; SPC) before, immediatly after interventions, and 1 day after interventions. Results: Flexibility scores for participants in each of the groups significantly increased from pre-interventions to immediate and 1 day after interventions. However, the length of 1 day after interventions was shorter than immediate length after interventions. Difference in length between immediate and 1 day after interventions was some shorter in the contract-relax group versus the static group but, not significantly. Conclusions: The results of this study suggest that a contract-relax is an effective length adaptation of hamstring muscles by 1 day after intervention.

  • PDF

A STUDY ON ANALYSIS OF DELIVERY & CONTRACT SYSTEM FOR INTRODUCTION OF THE INTEGRATED PROJECT DELIVERY (IPD) TO KOREA - Focusing on Delivery and Contract of Public Works -

  • Sulmin Song;Seong-Ah Kim;Yea-Sang Kim;Sangyoon Chin
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.142-148
    • /
    • 2011
  • Recently, much attention has been increasingly paid to the efficiency of the delivery system in order to manage construction project in a smooth and effective way. The integrated plan in consideration of the life cycle of building is required for the effective and integrated management of information in a huge amount. To this end, collaboration between each field is indispensable from the beginning of project. But there is a limitation that the designer and the constructor sign the contract separately in the conventional delivery system. In the US, the recent trend is that the Integrated Project Delivery (IPD) has been introduced to improve the effectiveness of project management in an increasing number of the cases where project is implemented by utilizing the IPD. In Korea, there is also an increasing need to introduce the IPD for the integrated project management. Consequently, the purpose of this study is to examine and analyze the laws and the contracts that are applied to domestic cases of placing order and signing contract based on the concept and principle of the IPD before the actual introduction of the IPD. Based on such examination and analysis, this study intends to figure out the constraints to the introduction of the IPD. It is expected that the results of this study will be used as basic data for IPD-related study in the future.

  • PDF

Comparative Analysis on the Perspectives of Hospitals and Contractors on Items related with Contracting Hospital Foodservice Management (병원급식 위탁계약에 대한 병원과 위탁회사의 견해 비교 분석)

  • Kim, Hyeon-A;Kim, Jin-Su;Yang, Il-Seon;Park, Mun-Gyeong;Park, Su-Yeon
    • Journal of the Korean Dietetic Association
    • /
    • v.10 no.3
    • /
    • pp.293-299
    • /
    • 2004
  • The purposes of this study were to : a) investigate the current status of contracted hospital food services, b) analyze and clarify various perspectives of contractors and hospitals. Thirty six hospitals and their contractors which were having more than 100 beds located in Seoul, Inchon and Kyungkido, were the subjects of this study. Data were collected through surveys. The survey was conducted during March to April in 2002. Questionnaires were mailed to the 36 directors of dietetic departments of hospitals and 36 managers of contract foodservice management company. Statistical analysis was completed using SPSS Win(11.0) for descriptive analysis, t-test and $x^2$-test. The results of the study can be summarized ; 1. The type of contract considered adequate by directors of dietetic departments and managers of contractors was fee-contract, combined type, followed by profit-and-loss contract. 2. According to the results from analysis on the contract cost per meal considered adequate by directors of dietetic departments and managers, the directors of dietetic department indicated that showing no difference with the current contract cost per meal. However, the managers of contractor indicated that showing significant differences compared with the current contract cost per meal(regular diet p<0.01, therapeutic diet p<0.001). 3. In the composition of contract cost per meal considered adequate, the managers of contracting businesses accounted labor cost (p<0.01) as a major cost, whereas the chiefs of nutrition departments accounted miscellaneous or controllable expense (p<0.001) and VAT (p<0.01) as major costs. 4. The directors of dietetic departments and managers thought that the hospital should be responsible for utility costs. On the other hand, directors of dietetic departments regarded that the contractor and managers thought that the hospital should pay for facility investment cost.

  • PDF

A Study on the Status of Contract Managed Hospital Food Services (병원급식 위탁관리의 운영 실태조사)

  • Kim, Jin-Su;Yang, Il-Seon;Kim, Hyeon-A;Park, Mun-Gyeong;Park, Su-Yeon
    • Journal of the Korean Dietetic Association
    • /
    • v.9 no.2
    • /
    • pp.128-137
    • /
    • 2003
  • The purposes of this study were to investigate the current status of contracted hospital food services and to find out the difference in accordance with the number of beds in hospitals. Thirty six hospitals having more than 100beds in Seoul, Inchon and Kyungkido were the subjects of this study. Data was collected through surveys. The survey was conducted during March and April in 2002. The Questionnaires were mailed to the 36 directors of dietetic departments of the hospitals and 36 managers of contracting patient food services. Statistical analysis was completed using SPSS Win(11.0) for descriptive analysis and t-test. The results of the study are summerized as follows; Ⅰ. Hospital perspective : The range covered by contract food service was 63.3% and 36.7% in hospital food services, and medical nutrition services. The patient and employee food services were in 83.3%, and patient food services were in 6.7%. The methods selecting contractors are general, limited, selected and competitive biddings, and private contracts. The responsibility for supervision of contract food services was the dietetic department (51.7%) in most cases. Hospitals having personnel responsible for contracting affairs were in 75.9% of the cases and 24.1% did not have personnel. The biggest reason for contracting was facilitation of personnel management. The most important criteria on selecting food services contractors was the professionality of the contractor. Ⅱ. Contractor's perspective : The cost per meal in the year 2001 was composed of 1,905 won for food cost, 1,081 won for labor cost, 222 won for expenses, 114 won for VAT, 14 won for rent and 146 won for miscellaneous or controllable expense, representing 109 won loss per meal. The profit-and-loss contract cost is higher than the fee-contract cost. The ratios of food cost, labor cost and expenses are higher and the ratios of miscellaneous or controllable expense, VAT, rent and profit are lower in hospitals with more than 400 beds compared with those less than 400 beds. However, no significant differences are present between these two groups of hospitals. The actual contract period was 2.2 years upon initial contract and 1.2 years upon renewal. The initial investment cost was 53 million won and the cost of renovation and repair was 8.5 million won. Significant differences were present between two groups of hospitals. The conditions of employment and number of personnel hired by contractors for contract patient food services were significantly different according to the number of beds.

  • PDF

The Legal nature of a contract for supply of a special purpose aircraft -The legitimacy of contract cancellation on the grounds that the performance specification is not satisfied in the purchase specification- (특수 항공기 공급계약의 법적 성질 - 구매규격서상 성능요건 미달을 이유로 한 계약해제의 정당성 -)

  • Kwon, Chang-Young
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.31 no.2
    • /
    • pp.37-72
    • /
    • 2016
  • In the aerospace field, besides special purpose airplanes, contracts for supply of various types of products such as prototypes, unmanned aerial vehicles and space launch vehicles are increasing. In the case of the contractor, it was planned to spend a large amount of money to supply the production, but if the purchase specification that presents the quality and performance standard of the product is poor or lacks the capacity to judge the performance, consuming enormous amounts of time and money. Even if the undertaker does not have the ability to supply the products with the required performance and quality to achieve the purpose of the contract, he/she must pay the cost of burial due to the incompleteness of the work and the compensation for the cancellation of the contract. In this case, the defendant ordered the plaintiff to supply the aircraft by the Happy Box method, which is capable of ILS Offset flight as specified in the Purchase Specification, but the plaintiff attempted to supply the aircraft by the RNAV method. Although the ILS ground signal can be inspected by the RNAV method, the aircraft manufactured in the manner claimed by the plaintiff does not have the ILS Offset flight function required by the purchase specification, so the defendant can not achieve the purpose required by the purchase specification. It was a question of whether a defendant's cancellation of contract was legitimate. The aircraft, which is the object of this contract, is a subordinate substitute, so the case contract is of undertaking. Therefore, in order to complete the work in this contract, the major structural parts of the aircraft must be manufactured as agreed and have the performance generally required in the social sense. However, the aircraft delivered by the plaintiff has serious defects because the defendant can not achieve the purpose required by the purchase specification due to the lack of the ILS Offset flight function required by the purchase specification. This deficiency is impossible for the plaintiff to repair, so the defendant 's cancellation of the contract is legitimate.

The Legal Structure of Guard & Security Contract and the Prevention & Resolution Method of Security Disputes (경호경비계약의 법적 구조 및 분쟁의 예방과 해결 방안)

  • Ahn, Sung-Cho
    • Korean Security Journal
    • /
    • no.11
    • /
    • pp.129-157
    • /
    • 2006
  • With rapid social change, by culminating the social hazards and the safety problems about it are on the increase too. According to the needs for the safety the demand of the private guard & security provided the safety and security service against danger is also increasing. As the need for the safety is increasing, so recently the private guard & security industry is extended. Therefore the purpose of this study is to grasp and carry out researches into the legal structure on the Security contract, is to analyze the formation of contract and find out the ensuing problem in order to prevent or settle the dispute which is apt to occur between the specific client and the security companies. In order to minimize the dispute going with security relationship in particular, it is necessary that one should write down the agreed contents as the document explicitly to make a security contract with the parties. Hereupon in the plan which standardizes the security contract with each parties autonomously, it is suggested that this study should present the model of Dispute Resolution Clause Especially it is the best means that it is amicable consultation or negotiation as the effective way of settlement methods of private dispute arising from the concerned parties. In inevitable case it recommends the method which solves the dispute by means of an arbitration than litigation at administration of justice(in terms of jurisdiction). If the parties wish to settle the disputes by arbitration, they must come to an arbitration agreement in the form of a arbitration clause in the security contract. After the test and evaluation through application utilizing it in actual security field, the security standard contract regulates about it and this terms should widely apply a individual case to whole industry.

  • PDF

A Study on the Reformation of the Contract Time Extension Process in the Public Construction projects (공공건설사업에서 계약기간 연장처리방법 개선에 관한 연구)

  • Cho Young-Jun;Lee Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.81-89
    • /
    • 2005
  • Delay schedule coming about duration extension is happening essentially because public construction project consist of many sub contractor. The method which can calculate delay day is suggested by many studies in case of happing delay schedule, but It is difficult to apply to real construction project because there is no mention about the control of The law of contract according to delay schedule. The law of Contract which is cost of account has more uncertain problem than FIDIC condition of contract. This study suggests method which can make extension of duration procedure clear in case of happing the reason of design change related with activity duration during carrying on construction, and a submission process of the reason of duration extension and modify schedule making way about section which is basis of calculating contract amount clear.

A STUDY ON CONSTRUCTION SCHEDULE OPTIMIZATION INTEGRATING WITH CASH-FLOW

  • Hyung-Guk Lee;Dong-Pil Shin;Sung-Hoon An;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.141-144
    • /
    • 2013
  • This paper presents a system called a Cash-flow based Construction Schedule Optimization system(CfSO). The existing CPM effectively handles schedule and cost management. However, funding strategy should be considered to obtain maximum profit and to progress a project favorably. One of measures is to coordinate the contract terms between owner and subcontractors (or suppliers). Contractor may decrease the interest cost attributed to project financing by adjusting the timing of cash-inflows and cash-outflows. It is an excellent method maximizing profits. This paper presents a method to estimate the amount of a cash-flow occurred periodically by integrating the terms of contract into scheduling. The proposed method is implemented as a system prototype in Microsoft Excel. This system provides a user an automated tool that identifies an optimal schedule that secures maximum profit by adjusting start and finish times of non-critical activities' free-floats without affecting on the project completion time. This system supports a project manager to establish an optimum project schedule and identifies profitable contractual conditions against to a construction owner.

  • PDF