• Title/Summary/Keyword: container terminal type

Search Result 55, Processing Time 0.026 seconds

A Comparative Study on Productivity of Next Generation Quay Crane in Container Terminal (컨테이너 터미널의 차세대 안벽크레인 생산성 비교분석)

  • Ha Tae-Young;Choi Yong-Seok
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.11a
    • /
    • pp.297-302
    • /
    • 2004
  • This paper analyzed productivity of quay cranes on container terminal that have perpendicular yard layout block. In most existing container terminals, quay cranes of single trolley type are used to loading and unloading containers, but quay crane productivity of these type has many limitation about large size containership. For these reasons, recently quay cranes of various type that mn improve productivity are developed and as the representative example, dual trolley, double trolley, supertainer are developing. These cranes are realized that very high productivity bemuse their cycle time is short more than existent single trolley quay crane. Therefore, we analyzed productivity of these cranes that are realized by next generation crane alternatives and as result qf this research, mechaniml productivity by cycle time and net productivity by simulation were measured.

  • PDF

Simulated Analysis of the Effect of Integrated Operation on Container Terminals in Busan New Port (시뮬레이션을 활용한 부산항 컨테이너터미널 통합운영 효과 분석)

  • Shin, Jae Young;Lee, JangGun;Park, Hyoung Jun
    • Journal of Navigation and Port Research
    • /
    • v.44 no.6
    • /
    • pp.477-487
    • /
    • 2020
  • The inefficient operation of Busan New Port is due to container-terminal operators being dispersed in small groups, rather than being integrated. This dispersion increased following the reorganization of global shipping alliances in 2016 and causes unnecessary Inter-terminal Transportation(ITT) and ship delays. Studies of integrated operations for larger container terminals show that integration is not going well, however, due to the pre-emptive task that follows the integrated operation. Therefore, in this study, we divided the integrated operation into stages based on a simulated model of the container terminals in Busan New Port. The simulation took into account future increases in the ship's enlargement and terminal congestion, and the operational effects of each type of integrated operation were analyzed and evaluated.

The Operation of the Yard in a Terminal (터미널의 장치장 운영)

  • Ahn, Eun Yeong;Kang, Byoungho;Kang, Jaeho;Ryu, Kwang Ryel;Kim, Kap Hwan
    • Journal of Intelligence and Information Systems
    • /
    • v.12 no.3
    • /
    • pp.47-65
    • /
    • 2006
  • These days, the number of automated container terminals is increasing to encourage the productivity of the container terminal inside and outside of the country. So far, there have been a lot of researches on the operating one type of equipments in a container terminal. However, there is still room for further improvement as none of equipment works itself but cooperate each other to finish a job, which means synchronization among the equipments is necessary. Among lots of equipments in a terminal, this paper concerns with the operation of ATCs (Automated Transfer Crane) and YTs (Yard Truck). The purpose of this paper is to find the efficient heuristic methods for operating ATCs and YTs that can set up a schedule in a real time. Moreover, using simulation this paper shows the efficient stacking strategy to decide the location of containers to be put and the proper selection range of YTs.

  • PDF

Routing of Linear Motor based Shuttle Cars in the Agile Port Terminal with Constrained Dynamic Programming

  • Cho, Hyun-Cheol;Lee, Jin-Woo;Lee, Young-Jin;Lee, Kwon-Soon
    • International Journal of Control, Automation, and Systems
    • /
    • v.6 no.2
    • /
    • pp.278-281
    • /
    • 2008
  • Linear motor (LM) based shuttle cars will play an important role in the future transportation systems of marine terminals to cope with increasing container flows. These systems are known as agile port terminals because of their significant advantages. However, routing for multiple shuttle cars is still an open issue. We present a network model of a container yard and propose constrained dynamic programming (DP) for its routing strategy with collision avoidance. The algorithm is a modified version of typical DP which is used to find an optimal path for a single traveler. We evaluate the new algorithm through simulation results for three shuttle cars in a mesh-type container yard.

Anti-Sway System for Automated Transfer Crane (자동 트랜스퍼 크레인을 위한 컨테이너 흔들림 장치)

  • 박찬훈;박경택;김두형
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.1743-1746
    • /
    • 2003
  • Automated Container Terminals have been being developed over the world for many recent years and more and more countries get interested in it because the amount of containers exported or imported is steeply increasing. Existed Container Terminals were not designed to control this kind of heavily many containers. They would face many structural problems soon or later, although they have managed to do well until now. One of the most important things in developing Automated Container Terminal is to develop the equipment able to transfer the awfully many containers. Those are maybe Automated Transfer Cranes, Automated Guided Vehicles, and Automated Quay-Side Cranes. The word "Automated" means the equipment is operated without drivers and those equipments are able to work without taking any break. Through the researches on the existed transfer cranes, authors decided that the structure of existed transfer cranes is not proper to swift and fast transfer and it′s not impossible to handle so many containers in limited time. Therefore authors have been studying on the proper structure of the Automated Container Crane for past several years and a new type of transfer crane has been developed. Design concepts and control methods of a new crane will be introduced in this paper.

  • PDF

A Study on Wedge Angles of Wedge-type Rail Clamp for Preventing Jaw from Rotating (쐐기형 레일 클램프에서 조(jaw)의 회전을 방지하기 위한 적정 쐐기각에 대한 연구)

  • Shim J. J.;Lee S. W.;Han D. S.;Park J. S.;Jeon Y. H.;Lee H.;Han G. J.;Ahn C. W.
    • Journal of Navigation and Port Research
    • /
    • v.29 no.8 s.104
    • /
    • pp.735-740
    • /
    • 2005
  • In this paper, we designed a wedge type rail-clamp which can protect container crane from sudden wind blast with constant clamping force regardless of the operating period. When we design wedge type rail clamp, it is important to determine an angle of wedge which prevent rotating of jaw and for smooth operation when wind blows. Therefore, this paper suggest a process to decide an angle of wedge within proper range obtained by experimental analysis as well as FEA of the wedge type rail clamp. A model with $6^{\circ}$ wedge angle is the most proper model to use in rail clamp bemuse it generated satisfactory clamping force and rotating angle underdesign specification.

A Case Study on the Planning Characteristic and It's Application of Container Architecture in Europe (유럽 컨테이너 건축물의 사례분석을 통한 국내 적용방안)

  • Kim, Mi-Kyoung;Mun, Young-A;Han, Su-Ji
    • Journal of the Korean housing association
    • /
    • v.26 no.1
    • /
    • pp.43-51
    • /
    • 2015
  • The purpose of this study was to analyze the planning characteristics and it's application of container architecture as case study. Field survey was used to analyze the spatial planning characteristics in terms of development outline, appearance, exterior, floor plan and interior of eight famous cases in Berlin, Hamburg, Hannover, Amsterdam and Paris of Europe. The results of this study were as follows; Firstly, good examples of container architectures such as student housing, social service center, temporary medical facility and cruise terminal in Europe suggested the potential of domestic applicability in various purposes and development. Secondly, various types of freight container, building container and module frame system should be developed with their reprocessing environment. Thirdly, it is necessary for us to develop ISO type(20~40ft) container and standard plan with interior and storage design reflecting demands of residents. Finally, the use of container module will be an environmental-friendly alternative for its modularity and reusability, so it should be used as it is without severe deformation. The development of environmental friendly energy sources such as hydro and solar power is necessary for domestic container architecture as well. The container design should include the use of high quality of exterior finishing materials and the plan of aesthetical color planning to make the building a local landmark.

Study on Simulation for Buffer Space Analysis of Container Crane with Dual Trolley (듀얼 트롤리형 컨테이너 크레인 버퍼공간 분석을 위한 시뮬레이션 연구)

  • Choi, Yong-Seok;Won, Seung-Hwan
    • Journal of Navigation and Port Research
    • /
    • v.33 no.5
    • /
    • pp.331-337
    • /
    • 2009
  • Container crane is main equipment in container terminals and it determines the productivity and the efficiency of container terminals. The typical type of container cranes has the single trolley and one among advanced types of them has the dual trolley. The objective of this paper is to analyze the buffer size of a container crane with the dual trolley in container terminals. We present a simulation model for analysing the buffer space of a container crane with the dual trolley. The buffer space is located between main trolley in sea-side and second trolley in yard-side. We performs various simulation experiments and analyze the buffer size to estimate the required productivity.

A Heuristic Algorithm of Berth Assignment Planning in a Container Terminal (발견적 알고리즘에 의한 컨테이너 터미널의 선석배정에 관한 연구)

  • Lee, H.G.;Lee, C.Y.
    • Journal of Korean Port Research
    • /
    • v.9 no.2
    • /
    • pp.1-8
    • /
    • 1995
  • Generally, berth assignment problem has conflicting factors according to the interested parties. In the view of shipping company, it is desirable that berth assignment is made according to the order of arrival. But in the view of port operator, it is better to be assigned regardless the order of arrival to promote the efficiency of berth operation. Thus, it is necessary to establish berth assignment planning which reflects both of interests in a practical situation. This paper aims to develop a reasonable berth assignment algorithm in a container terminal by considering the prescribed factors, and suggests three types of models minimizing the objective functions such as total port staying time, total mooring time and total maximum mooring time by using MPS concept. These models are formulated by 0-1 integer programming and min-max type function, but as the number of variables increases, an optimal solution cannot be achieved easily within a desired computational time. Thus, to tackle this problem this paper proposes a heuristic algorithm, and also the heuristic algorithm proposed in this paper is verified through the several examples.

  • PDF

Optimal Berth and Crane Scheduling Using Constraint Satisfaction Search and Heuristic Repair (제약만족 탐색과 휴리스틱 교정기법을 이용한 최적 선석 및 크레인 일정계획)

  • 류광렬;김갑환;백영수;황준하;박영만
    • Journal of Intelligence and Information Systems
    • /
    • v.6 no.2
    • /
    • pp.1-14
    • /
    • 2000
  • The berth and crane scheduling problem in a container terminal encompasses the whole process of assigning berth to each ship, determining the duration of berthing, assigning container cranes to each ship, and determining the specific start and end time of each crane service, for all the ships scheduled to be arriving at the terminal during a certain scheduling horizon. This problem is basically a constraint satisfaction problem in which cranes and berths should be assigned in such a way that all the spatial and temporal constraints are satisfied without any interference. However, it is also an optimization problem because the requested arrival and departure time should be met for as many of the scheduled ships as possible, while the operation cost of the terminal should be minimized. In this paper, we present an effective and efficient approach to solving this type of problem, which combines constrain satisfaction search and heuristic repair. We first employ a constraint satisfaction search to find a feasib1e solution. Then, the feasible solution is modified to a more optimal one by iteratively applying our heuristic repair operations within the framework of constraint satisfaction search. Experimental results with a real data from Pusan East Container Terminal showed that our approach can derive a schedule of satisfactory quality in a very short time.

  • PDF