• 제목/요약/키워드: construction-specific

검색결과 1,838건 처리시간 0.03초

건설 근로자의 이미지 영향요인 분석 및 향상방안 (An Analysis on the Factors Influencing the Image of the Construction Worker and Its Improvement Measures)

  • 신원상;손창백
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.134-135
    • /
    • 2015
  • This study was conducted to present basic improvement measures to improve the negative construction industry image of construction workers in the future, by investigating the construction industry images that construction workers have, through previous studies and analyzing the factors influencing these images, based on the multiple regression model. But this study is limited to construction workers and failed to establish specific improvement measures. Therefore, continued research which remedies the limitation of this study, will performed in the future.

  • PDF

DESIGN AND USE OF BUILDING INFORMATION MODELS FOR PREPLANNING COMMERCIAL BUILDING CONSTRUCTION ACTIVITIES

  • Thomas M. Korman
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.274-278
    • /
    • 2013
  • Over the past several years, the building codes that govern commercial building construction have become increasingly prescriptive in nature, specifying detailed information related to the design and installation of the systems, while offering no reasoning behind their prescriptive measures. For example, metal stud framing is commonly used in commercial building construction to create bearing walls and non-bearing partition walls. BIM provides a powerful platform for developing and implementing "pre-planning" tools and methods to facilitate both engineering and administrative controls during construction. This paper discusses the use of BIM to enhance constructability for commercial building construction activities, specifically metal stud framing. Using specific real-world examples this paper demonstrates ways that BIM can be used to foresee potential construction issues and motivates and informs future uses of BIM technologies

  • PDF

건축물 모듈러 공법 적용을 위한 단계별 관리요인 기초적 분석 (A Basic Analysis of the Management Factors the Application of Modular Construction Method in Buildings)

  • 김성은;이신자;임형철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.373-374
    • /
    • 2023
  • Modular construction is a cost-effective and time-saving method of building that involves prefabricating modules in a factory and assembling them on-site. However, effective management factors must be considered at each stage of the process to ensure quality and stability. This study analyzes these management factors and proposes systematic ways to manage them, including construction planning, data management, and quality assurance. Proper management can improve construction quality, shorten construction time, and reduce costs. These stage-specific management factors are crucial for the success of modular construction projects, and further research and efforts are needed to promote its widespread use in the construction market.

  • PDF

전문용어의 처리에 의한 도메인 온톨로지의 구축 (Domain-specific Ontology Construction by Terminology Processing)

  • 임수연;송무희;이상조
    • 한국정보과학회논문지:소프트웨어및응용
    • /
    • 제31권3호
    • /
    • pp.353-360
    • /
    • 2004
  • 온톨로지는 특정 도메인에 사용되는 용어들과 그 용어들 간의 관계를 정의하고, 이를 계층구조로 표현한 것을 말한다. 본 논문에서는 전문용어의 처리에 기반 한 도메인 특정적인 온톨로지의 반자동 구축방안을 제안하고자 한다. 이를 위하여 도메인 텍스트 내에서 전문용어를 구성하고 있는 명사나 접미사의 패턴을 분류하고, 이에 따라 전문용어를 추출하고 계층구조를 구하는 알고리즘을 제안한다. 실험은 약학 관련 문서를 대상으로 하였으며, 단일어절 전문용어를 인식한 결과 평균 92.57%, 다중어절 전문용어의 경우 평균 66.64%의 정확도를 보였다. 구축된 온톨로지는 의미정보와 함께 전문용어를 구성하는 특정 명사나 접미사를 중심으로 자연스런 의미 군을 형성함으로써 정보검색 등의 전문적인 지식의 접근에 유용하게 쓰일 수 있으며, 검색의 성능을 향상시키기 위한 추론의 기반으로도 이용할 수 있다.

산출내역서.공정 통합관리 모형 구축에 관한 연구 (Work Management Model to Integrate Schedule and Bill of Quantit)

  • 박홍태;박찬정
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2002년도 학술.기술논문발표회
    • /
    • pp.123-131
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule, the existing systems, however, are focused on the cost management by using wort quantity. This study suggests a work management mode1 to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction cost to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

  • PDF

FIDIC 계약조건과 국내 관련법의 비교 연구 (The FIDIC and domestic construction contract conditions)

  • 이상훈;양창황;조영준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 추계 학술논문 발표대회
    • /
    • pp.127-131
    • /
    • 2005
  • The construction industry has specific characteristics compared with manufacturing industry. This means that each construction project has it's own contract documents due to the difference of environment and time. Now, the construction market is opening according to the Government Procurement Agreement by WTO. Therefore to overcome the associated risks, domestic contract rules and acts should be reformed. FIDIC and domestic construction contract conditions is investigated and analyzed. Based on the research outcomes the direction of reformation is suggested.

  • PDF

산출내역서.공정 통합관리 모형 구축에 관한 연구 (Work Management Model to Integrate Schedule and Bill of Quantity)

  • 박홍태;박찬정
    • 한국건축시공학회지
    • /
    • 제2권4호
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

A STUDY ON THE IMPROVEMENT OF POST-EVALUATION ITEM FOR PERFORMANCE MEASUREMENT IN THE BUILDING CONSTRUCTION

  • Lee, Eun-Ji;Ha, Hee-Yoon;Ko, Hyun;Kim, Jae-won;Kim, Jae-Jun
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.407-416
    • /
    • 2007
  • The construction industry in South Korea is experiencing great changes: it is becoming developed on a larger scale, specialized to a high degree and rapidly incorporating with other industries. This development has resulted in higher demand of construction industry. Accordingly, the transparency and an objective method of evaluation in the process of projects in the construction industry are gaining more importance. Clients' and customers' needs also require more specific objective evaluation to find whether their projects are successfully performed or not. This study aims to discuss problems on the current post-evaluation items including the qualitative item analysis such as customer satisfaction. Moreover, this paper suggests the improved ways in which enable the application of the effective evaluation system to the construction industry.

  • PDF

모듈러 건설현장의 단위작업별 안전관리 활동 및 중점 체크사항 제안 (Suggestion of Safety Management Activities and Key Check point for Safety Management in Modular Construction Sites)

  • 전영훈;김균태
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.202-203
    • /
    • 2022
  • In this study, focusing on work types of lifting modules and modules assembly in modular construction sites, unit works were defined according to the construction process of each work type, and safety management elements, safety management activities, and key check point were proposed. The results of this study may have somewhat overlapping contents in the construction procedure in order to derive specific safety management activities and check point for each unit work. Therefore, there is a limit to use the results in an actual modular construction site. In future research, we plan to improve this part and derive a checklist that considers field usability.

  • PDF

팀기반학습을 적용한 건축시공 교육과정 운영방안 (Plans for Building Construction Curriculum Operation Applied with Team-based Learning)

  • 조민진;김성빈;김재엽
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.87-88
    • /
    • 2021
  • Due to the effects of COVID-19 and the Fourth Industrial Revolution, construction engineering education has been required to change. As part of efforts to respond to changes, innovative teaching methods such as team-based learning have been introduced, but specific measures are still lacking. In this regard, this study proposed plans for building construction curriculum operation applied with team-based learning, building construction course operation applied with team-based learning, and building construction course grade evaluation applied with team-based learning. It is expected that the proposed operation plans can be used in educational settings where team-based learning is to be applied in a changing class environment.

  • PDF