• Title/Summary/Keyword: construction stages

Search Result 813, Processing Time 0.033 seconds

A Study on the Simulation of Construction Steps of Prestressed Concrete Bridges (P.C 교량의 시공단계 모사방법에 대한 연구)

  • 이태양;변윤주;김우종
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1991.04a
    • /
    • pp.121-128
    • /
    • 1991
  • The changes of stuctural systems in constructing prestressed concrete bridges are investigated according to several construction methods. Based on these investigation, structurally meaningful works are summarized and defined as "Construction Commands". And time-dependent characteristics of concrete and prestressing steels are fully considered. For the static and/or dynamic analysis of three dimensional prestressed concrete bridges at ant construction stages, it is propoesd to use "Comstruction Commands" directly as user's input data. A example of cable syayed bridges is presented by the computer program developed by the present simulation method.

  • PDF

Centrifuge Model Experiments on Behavior of Waterproof Dike in Progress of Construction (원심모형실험을 이용한 방수제 안정성 검토)

  • Yoo, Nam-Jae;Kim, Dong-Gun;Lee, Dong-Won
    • Journal of Industrial Technology
    • /
    • v.31 no.A
    • /
    • pp.79-86
    • /
    • 2011
  • This paper is results of centrifuge model experiment of investigating geotechnical engineering behavior of waterproof dike, located in soft grounds, in Saemankem in progress of construction. Centrifuge test with artificially increased gravitational level of 50g were performed to find ground settlements and excess pore-pressures developed during construction of waterproof dike by simulating the construction stages being predicted to occur in field so that the stability of waterproof dike could be assessed.

  • PDF

Investigation on Ongoing Tideland Reclamation Projects in Western Coast of North Korea using Satellite Image Data (인공위성 화상데이터를 이용한 북한 서해안지역의 미완공 간척지 조사)

  • 조병진;안기원
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.43 no.1
    • /
    • pp.75-86
    • /
    • 2001
  • North Korea reported that tideland reclamation projects had been successfully constructed and/or under construction during the period of the third development scheme(1987∼1993), which were 28,400ha in 9 project areas: 8 projects along the western coast and one in the eastern coast. In this study eight projects located in western coast were investigated in order to confirm the detail of works, construction stages and difference from our project formulation methods using the topographic maps published in different years and the recent sattelite image data especially Lansat TM and SPOT PN. Intensity-hue-saturation (IHS) method was adopted to merge two sattelite data for the image enhancement of remote sensing. Construction stages of sea-dikes, land consolidation for paddy and salt pan, reservoir for irrigation and desalinization and the present land use were investigated and estimated the acreage of the development areas. The total gross project areas of 38,105 ha: 16,555 ha completed for paddy or salt pan, 16,826 ha under construction, and 4,724 ha under planning were confirmed, although the area of 27,100 ha in 8 projects were reported to be completed or ongoing on the bimonthly journal of N. Korean Trend published in 1994.

  • PDF

Construction Industry Maturity Model

  • Kwon, Byung-ki;Lee, Hyun-soo;Park, Moonseo;Lee, Kwang-Pyo;Kim, Soo-young
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.445-449
    • /
    • 2015
  • Construction industry is one of the most significant sector in national economic, but the portion of construction has been falling regularly with the regional development. In spite of decrease in economic portion, role of construction industry does not changed irrespective of development, as the foundation of development. To distinguish each state of the maturity, countries are grouped on GDP per capita, than compared with variance of GVA in construction and GFCF per GDP as level of construction industry. GVAc% and GFCF% shows corn-shaped plotting in increase of GDP per capita, and each value converge to around 20% and 5% as GDP per capita increase. The definition of maturity is consist of 4 stages; pre-developing, ascending, stabilization, and maturement. Maturity of construction industry is a term of broad sense of construction industry that is easily to figure current state of regional construction and shows what normal condition of construction is in regional economy.

  • PDF

A PROPOSAL OF ENHANSED NEURAL NETWORK CONTROLLERS FOR MULTIPLE CONTROL SYSTEMS

  • Nakagawa, Tomoyuki;Inaba, Masaaki;Sugawara, Ken;Yoshihara, Ikuo;Abe, Kenichi
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1998.10a
    • /
    • pp.201-204
    • /
    • 1998
  • This paper presents a new construction method of candidate controllers using Multi-modal Neural Network(MNN). To improve a control performance of multiple controller, we construct, candidate controllers which consist of MNN. MNN can learn more complicated function than multilayer neural network. MNN consists of preprocessing module and neural network module. The preprocessing module transforms input signals into spectra which are used as input of the following neural network module. We apply the proposed method to multiple control system which controls the cart-pole balancing system and show the effectiveness of the proposed method.

  • PDF

Study on building room fire development stages (건축물 실내화재의 단계에 대한 연구)

  • Cha, Jong-Ho
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.169-172
    • /
    • 2008
  • The purpose of this paper is to summarize characteristics of fire growth stages, combustion proceeding, human behavior factors against fire, fire active protections, fire alarms in order to perform public safety and protection, personnel property protection, with identification of economic analysis aspects based on respective stages classified as fire generation- fire growth- flashover- fire extinction, which is differ from previous studies that based on distinct concepts such as fire stages, escapes, building construction, fire sensing.

  • PDF

Assessing Indonesian Construction Regulations on Quality and Performance

  • Willar, Debby;Rumbayan, Rilya;Manueke, Selfy;Mandagi, Robert
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.481-485
    • /
    • 2015
  • Indonesian construction companies are currently facing high competition both among themselves and with global construction companies. In order to address this issue, the Government of Indonesia has enacted specific regulations and policies relating to the development and implementation of quality management systems (QMSs) ISO 9001 based in construction, acknowledging that the consistency of construction project quality requires a formal quality system as a guarantee to raise quality standards at all project stages. The research has been undertaken to examine the effectiveness of the regulations and policies against several key performance indicators (KPIs) of the ISO 9001 Indonesian construction companies. A comprehensive review of the relevant regulations and policies together with interviews with the Government and National Construction Services Development Board recommend possible additional guidelines and supporting quality system, which intends to measure contractors' project output against defined standards as well as to assess their performance among other similar service providers. The outcomes of the research contribute to the development of the Indonesian own construction industry quality measurement and assessment system.

  • PDF

Environmental Review Factors for Environment-friendly Construction Management in the Natural and Ecological Environment Sector (자연생태환경분야의 환경친화적 건설사업관리를 위한 환경성 검토항목)

  • Yoon, Ho-Bin;Lee, Chan-Sik;Lee, Young-Joon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.117-124
    • /
    • 2008
  • Environment-indifferent developments have brought about a great deal of environmental pollution and a destruction of the ecosystem. The global interest in environmental pollution has emerged in accordance with the environmental regulations becoming ever stricter in the international society. Various attempts are being pitched in Korea such as the PERS (Prior Environmental Review System) and EIA (Environmental Impact Assessment) and they practice a significant impact on the construction industry. Recently, there have been cases where large-scale national development businesses are delayed and terminated or re-examined for their feasibility for not having reflected and analyzed the environmental factors of the natural and ecological environment. We must sustain the ecological functions and balance and minimize environmental pollution issues that can be caused by land developments and preserve the natural environment so to induce environmentally-friendly development businesses. Thus, this research paper proposes environmental review categories of the natural ecosystem sector that can be applied to all stages of construction businesses including master planning stages, basic planning and execution designing stage, construction stage, and maintenance stage. The environmental review categories proposed in this paper are expected to offer a great deal of support in terms of inducing environment-sustainable development to decision makers in the master plan stage, designers in the basic planning and execution designing stage, and construction managers in the construction and maintenance stages.

Numerical Simulation on Hydrodynamic Characterization Changes Associated with the Construction of Dikes and Dredging Operations in Saemangeum Lake (새만금호 내 방수제 공사 및 준설에 의한 수리동역학적 특성 변화 수치 모델링)

  • Oh, Chan-Sung;Choi, Jung-Hoon;Cho, Young-Kweon
    • Journal of Environmental Science International
    • /
    • v.22 no.9
    • /
    • pp.1115-1129
    • /
    • 2013
  • The study area is located on the western coast, and the inner development construction has been ongoing since 2011. The purposes of current study are to effectively simulate and quantitatively predict a temporal and spatial distributions of water temperature and salinity due to the stages of inner development construction in saemangeum reclaimed area. The transient-state numerical modeling using EFDC model is done, and the numerical simulation results are validated reasonably by repetitive numerical model calibration procedures with respect to field measurements of water temperature and salinity. The spatial distributions of water temperature and salinity show similar trends before and after construction of the dikes. In spring season, the salinity has maximum value of 21 psu, while, in summer season, the salinity shows 7 psu in a whole modeling domain. Thus, it is clearly observed that salt water is replaced by freshwater. However, the salinity and temperature reach their initial conditions at the end of the year. The salinity after construction of the dikes is lower than that before construction of them at Mankyeong area. On the other hands, after construction of the dikes, the salinity after dredging operations is higher than that before dredging. Because drastical increasing of water volume in Saemangeum Lake leads to increasing of stagnation time at bottom layer, and salt water is easily intruded to the two estuaries. Therefore, it may be concluded that hydrodynamic characteristics on Saemangeum are dominated by either Mankyeong and Dongjin discharge or sluice gates in/out-flow amounts, and thus they must be properly considered when rigorous and reasonable predictions of water temperature and salinity according to the stages of inner development construction.

The construction management of BIM-based small building remodeling. (BIM 적용을 통한 소규모 건물 리모델링 시 현장시공관리)

  • Jung, Tae-Ho;Kim, Sang-Won;Park, Seung-Hwan;Hong, Seong-Wook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.191-192
    • /
    • 2012
  • The BIM(Building Information Modeling) introduction of the construction and maintenance at the design phase through the life cycle of the building until it is destroyed, I will bring big changes in the process. If you are building a small action by a variety of variables difficult to manage on-site construction, but, BIM remodeling of the building by applying a small improvement in the quality of imported building and construction delays, such as design changes or re-construction by removing the elements of economic 04 to make. Since the early stages of applying BIM to complement the introduction part, but the future seems to lead to changes in the built environment, academics and practitioners of the construction industry seem to have an active research.

  • PDF