• Title/Summary/Keyword: construction situation

Search Result 1,224, Processing Time 0.027 seconds

A Basic Study on the Performance Relationship among Internal Marketing Factors in Construction Company by Using AHP Method (AHP기법을 활용한 건설기업 내부마케팅 구성요인 간의 성과관계 기초연구)

  • Lee, Jong Sun;Kim, Boo-Young;Cho, Han Byung;Son, Kiyoung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.224-225
    • /
    • 2014
  • In recent years, the domestic construction business is continuously stagnated caused by housing depression, global financial crisis etc. To overcome these difficulties, the construction companies should reinforce the internal marketing like the service business. However, it is not easy to conduct active internal marketing reinforcement since the companies do not directly receive customers under special situation like construction. Therefore, it is necessary to resolve the urgent issue by selecting order of priority among internal marketing factors. To address this issue, the objective of this study is to analysis the internal marking factors by using Analytic Hierarchy Process.

  • PDF

Integrating Order Process in Residential Building Construction (주거시설공사의 하도급 통합발주 프로세스 개발)

  • Kim, Yongl-Won;Park, Hyung-Jin;Jung, Jin-Hyun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.84-85
    • /
    • 2013
  • Integrating multi-trade works system helps to reduce to minimize the conflict of subcontract business and improve communication to increase productivity of construction. However it takes such a big risk if subcontract of integrating multi-trade works went bankrupt during the project so some of construction companies executed to only small project and it's not sufficient to adopt overall project. This paper suggested the improvement scheme of work classification integrating multi-trade works, which takes a consideration into work zoning in order to apply current work situation.

  • PDF

A Case Study on the Serious Accidents of Construction (건설중대재해 사례 연구)

  • 장동일;이명구
    • Journal of the Korean Society of Safety
    • /
    • v.11 no.1
    • /
    • pp.108-120
    • /
    • 1996
  • It is a problems in industrial accidents that the knowledge for industrial accidents is obtained by experience, not by experiment. This experiential knowledge is obtained by Investigating accident cases and utilizing those for safety education. Therefore, in this paper, the situation about the serious accident of construction is analyzed by occupation, a kind of construction, time group, season, type of accident, and accidental cause. And the mutual · relations of these factors are studied. The most frequent type of the serious accidents of construction Is the falling accident. It happenes most frequently at apartment construction among kinds of construction and to structural worker, finishing worker, normal worker in order among occupations. And it is found that the most critical causes of the falling accident are the imperfection of safety facilities and unwearing of protection equipments, so a number of accidents can be reduced by the expansion of safety facilities and wearing of protection equipments absolutely. The counterplan of prohibition of accidents and the direction of government policy are presented by a series of nalyses for accident cases.

  • PDF

Labor Productivity Model on Construction Industry Using System Thinking (시스템 사고를 활용한 건설 산업의 노동생산성 모델)

  • Jang, Ho-Myun;Kim, Kyong-Hoon;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.3
    • /
    • pp.79-85
    • /
    • 2009
  • Labor productivity issues within the construction industry are receiving increasing attention. With the improvement in the standard of living, domestic laborers are avoiding 3D(Difficult, Dirty, and Dangerous) jobs by degrees. Because of this situation, the problem of insufficient labor is exacerbating in several basic industries. In particular, insufficient labor is a serious problem in the construction sector, where the workers are ageing and labor costs are increasing. In this study, we adopt a systematic approach to identify factors that influence labor productivity and analyze the causality between the factors and their ripple effects with the aim that the results of the study will help improve labor productivity and ensure its effective management. The established labor productivity model using systems thinking will get a footing in the greatest strategy in the construction industry.

A Study on the Perception Level of Health and Safety among the Participants for Optimization of Risk Assessment in Construction Industry (건설업 위험성 평가 최적화를 위한 운영 주체간 안전보건 인식도 조사 연구)

  • Paek, Chung-Hyeun;Cho, Ur-Ryong
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.23-32
    • /
    • 2015
  • Recently, the Ministry of Labour, published clause 2 of Article 41 (Risk Assessment) of the Act "Industrial Safety and Health" dated 12 June 2013 in connection with continuous increase of accidents at construction sites in order to prevent accidents in industrial safety and health in new construction in accordance with the risk assessment on construction projects are realized after March 13, 2014. In this paper, positive method of calculating risk discussed by performing research the awareness of general contractors and sub-contractors with presenting risky situation is considered. The purpose will be a positive method of calculating risk and would be a sufficient base and give a positive direction in the development of new systems currently working in the construction and risk assessment which consider the characteristics of sufficient risk assessment system for future research.

A Study on the Perception of Construction Workers on the Key Safety Provisions of the Serious Disaster Punishment Act (중대재해처벌법 핵심 안전조항에 대한 건설업 종사자의 인식 고찰)

  • Jae-Min, Kim
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.4
    • /
    • pp.71-83
    • /
    • 2022
  • This study is to investigate the degree of field awareness of how each provision of the Serious Disaster Punishment Act will affect accident prevention. As a result of conducting a survey of construction site workers, it was analyzed that construction site workers had a low sense of safety and did not voluntarily engage in safety activities. And it can be seen that they are taking a very passive position that it is efficient to implement safety under the supervision of the supervisor. Workers who need voluntary construction site safety activities are most aware of the situation at the site, but the problem was pointed out as "lack of procedures for listening to opinions and preparing improvement measures" for these problems. Future research is needed to see if this is a problem for individual workers or for those in charge of safety and health who do not correct it even though active opinions have been submitted.

Test Bed Application and Site Analysis to Apply Intelligent Unit Technology

  • Nam-Kyun Kim;Kyu-Shick Lee;Byung-Sun Yoo;Mu-Wook Pyeon;Jae-Sun Park;Jong-hwa Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1553-1558
    • /
    • 2009
  • Give high priority to the technologies that can be directly applicable to the U-City development projects which are in progress by many central and local governments. Create a real world product at the end of R&D phase by testing prototypes in test-beds or test-labs. Recently, new construction technologies have been developed, but they are rarely being applied to the construction filed. In this paper, the basic design was examined so that various technologies can be selected through a test-bed, analyzed for the real situation, and applied to actual construction sites. Improve productivity of regional and urban construction exercises and improve competitiveness of related products and services using IT-based telemetering/GIS technology.

  • PDF

A STUDY ON THE CLASSIFICATION OF OWNER'S STANDARD SPECIFICATIONS

  • Jai-Dong Koo;Tae-Song Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1158-1164
    • /
    • 2005
  • This study suggests how to classify owner's standard specifications in organizations such as local governments which place an order for constructing general and various types of facilities. And the principal conclusions of this study can be summarized as follows; first, the Standard Specifications for Seoul Metropolitan Government of for all facilities could be integrated by seven individual works. Second, it is advisable from a viewpoint of long term to draw up integrally owner's standard specifications by trade for facilities, rather than draw up by group of facilities. Third, editing integrated standard specifications for all trades to meet the unified work classification structure should be backed up by high technology, therefore owner's standard specifications by trades would be favorable to our situation.

  • PDF

Investigating Main Causes for Schedule Delay in Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.33-46
    • /
    • 2014
  • Delay is the most common problem in the construction industry. It has many negative effects on project's success in terms of time, cost, quality, and safety. From the literature review, a total of thirty-five factors of delay were selected. These factors were divided into seven groups related to materials, manpower, owner, consultant, contractor, construction, and external problems. This study was carried out to identify the main causes of delay for a construction project through their importance level. The importance level was determined based on the frequency of occurrence and severity of impact. The structured questionnaire has distributed to the respondents who have much experience in construction management in Bangladesh. The results of analysis indicated that top five factors of construction delay according to their level of importance are: (1) price of construction materials increased very rapidly, (2) political situation (revolution/ public strikes), (3) shortages of skilled workers, (4) poor site management and supervision by contractor, (5) incompetent/ immature subcontractors. These findings of this study are expected to be significant contributions to Bangladesh construction industry in controlling current performance of project on time overrun.

DEVELOPING U-CITY MARKET SCENARIOS THROUGH A SCENARIO PLANNING APPROACH

  • Yong-Ho Kwon;Jae-Jun Kim;Suk-Hee Han;Jin-Sik Kim;Yoon-Sun Lee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.459-468
    • /
    • 2007
  • The u-City construction project has become a hot topic in the construction market because it seems economic value-added field for construction firms. However, construction firms don't willingly participate in the u-City construction market because environments of the future business for the u-City are very uncertain. Scenario planning is a very powerful method in managing this uncertain planning situation and is based on scenarios that help each enterprise appropriately adapt itself to its own business environments. Therefore it is based on the main principles of systems thinking and multiple futures. For the purpose of dealing with such uncertainties, this paper attempts to develop the possible market scenarios of the u-City construction market in S.Korea through a scenario planning approach. From this perspective, we considered various aspects of the u-City construction such as market demands, technology development, policy level and management environment. After considering the relevant issues, we identified the main trends and key uncertainties. Finally, we developed three coherent u-City construction market scenarios. Construction firms can use these scenarios as a basic reference for market analysis and business strategy. Therefore, this paper is able to enhance the participation of construction firms in the u-City construction market.

  • PDF