• Title/Summary/Keyword: construction situation

Search Result 1,224, Processing Time 0.025 seconds

A Study on the Establishment of the Construction Failure Information Classification (건설실패정보 분류체계 구축에 관한 연구)

  • Park Chan-Sik;Jeon Yong-Seok;Shin Young-Hwan;Jang Nae-Chun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.97-105
    • /
    • 2003
  • Although Construction Failure Information has been reported in literatures, reports of research, and etc., it Is difficult to utilize the information because the information classification does not exist. Therefore, this study investigated and analyzed literatures of domestic and abroad research Institutions and suggested the Construction Failure Information Classification(CFIC). The CFIC is composed of four classified items; facility general information, failure situation information, failure cause Information, and failure counterplan information. Each item is divided sub-items. Through CFIC, Construction Failure Information can be standardized and utilized for useful data to prevent recurrences of construction failure.

Development of Unique Registration Number System for Construction Site Integrated DB (건설 통합DB 구축을 위한 시공현장등록번호 체계 개발)

  • Hur, Youn Kyoung;Lee, Seung Woo;Yoo, Wi Sung;Kim, Sung Hwan;Sung, Yookyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.367-368
    • /
    • 2023
  • Kiscon, Seumteo, KONEPS and CSI are representative construction-related DBs. All four DBs are operated by the public. However, the characteristics of data are different depending on the purpose. Therefore, it is difficult to utilize integrated data and it is only used sparingly. Creating and sharing a unique key that can identify a construction site will enable integrated accumulation and management of construction-related data for various purposes. At this point, it is most efficient to assign a unique key based on KISCON. KISCOn data conforms to the construction site definition and covers most of the public, private, architectural and civil works. In addition, there is an advantage in that DB construction is performed in the construction situation, which is a relatively preceding process. In the future, it is necessary to create a practical construction site integrated DB through the production of an integrated key table containing linkage information of unique keys for site management, performance indicators, and statistics production.

  • PDF

Present Condition of Theft Loss at Construction Sites and a Situation Analysis of Prevention Measures (건설현장 절도 피해실태와 예방대책의 현황분석)

  • Jang, Dong Hyeok;Kim, Han Soo;Nguyen, Tan Khoa;Jung, Sung Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.64-73
    • /
    • 2015
  • The theft of construction equipments and materials at construction sites is one of the risk factors that may affect to the productivity as well as the progress of the project. However, managers of the construction site have paid little attention to the security measure, therefore the theft loss at construction sites has been occurred repeatedly every year. In this study the situation analysis has been carried out for the present condition of theft loss of construction equipments and materials as well as its prevention measure based on the questionnaire survey targeting field managers, experienced theft loss at the site, as a part of base study to set up a security measure of construction sites. The main content of this study is analyzing characteristics of theft loss and the degree of impact and risk by it at construction sites, then reviewing the direction of the prevention plan establishment for the future through the analysis of the importance and utilization level of prevention measures. The result of this study would give an opportunity to create an awareness against the theft loss at construction sites as well as can be utilized as a basic survey for the systematic development of concerned prevention measures.

Study of Fire Resistance for Long Span Beams Made of Submarine Structural Steels (용접구조용 강재 적용 대형 보부재의 내화성능 연구)

  • Kwon, In-Kyu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.149-150
    • /
    • 2015
  • Structural beam plays a key role to carry the applied load on the floors. And then the beam have to sustain the applied load and its load-bearing capacity in fire situation. In this study to know the fire resistance performance of long span beam made of a submarine structural steels, an engineering method is used using mechanical and thermal properties of structural steel at high temperature.

  • PDF

국내 인터넷 쇼핑몰의 현황 및 구축에 관한 연구

  • 김영태
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.47-50
    • /
    • 1998
  • In this study, I investigated a domestic situation of Internet Shopping Mall, its elements and steps for construction. A domestic Internet Shopping Mall have some faults that a consumer cannot look at or touch directly a goods and have some bottlenecks such as a decisive way of a large amount of money, and so forth. On the other hand, it is consisted of 7 elements and its construction is consisted of 5 steps. Accordingly, I investigated the above statements.

  • PDF

The Analysis for Development Evaluation System of G-SEED Building Maintenance and Management (녹색건축인증 건축물 유지관리 평가제도 발전을 위한 연구)

  • Kim, Yu-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.261-262
    • /
    • 2016
  • In Korea, Green building certification system had been operated for more than 10 years and Expired certification buildings are ever-increasing. However, post management of building and qualification standard for re-certification(G-SEED) aren't exist, certificated green building don't have smoothly maintenance and management. Therefore, analysing the status and situation of similar system such as building maintenance and management, to suggest the direction of evaluation for green standard for energy and environmental design.

  • PDF

Study of Testing Methods for Combustible Properties of Finishing Materials Applied into Nuclear Power Plants (원전구조물 적용 마감재의 국내 연소시험방법 조사연구)

  • Kwon, In-Kyu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.60-61
    • /
    • 2018
  • Finishing materials are very important to restrain fire spread from a compartment to another in a fire situation. Therefore, the evaluation of combustible properties for the combustible material is essential to apply finishing materials into a generic buillding or s special occupancy structure. In this study, the testing methods for evaluation of combustible performance of finishing materials of domestic were surveyed in order to prepare the guideline of application of finishing materials in nulear power plant.

  • PDF

Network Construction of Women′s Volunteer Center (여성자원활동센터의 네트워크 구축 방안)

  • 이성철
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.3
    • /
    • pp.179-197
    • /
    • 2003
  • Since 1991, so many women's volunteer centers have established in local self governing body or several women's organizations. The aims are to promote and manage women's volunteer activities. For last 12 years, one of aims has been already attained. But the other one is beyond attainment, because there are few network system among women's volunteer centers. For more efficient management of volunteer activities, it is necessary to construct computer network system in every volunteer center. In this paper, we describe current network situation and suggest network construction method of women's volunteer centers.

A Study on the Risk Management Strategy of the Large Scale Construction Company According to the Change of Real Estate Market (부동산시장 변화에 따른 대형건설사 리스크관리 방안에 관한 연구)

  • Lee, Yun-Hong;Ji, Kyu-Hyun
    • Land and Housing Review
    • /
    • v.9 no.1
    • /
    • pp.1-9
    • /
    • 2018
  • As the government announced Real Estate Policies on August 02, most areas except for Seoul cities face increasing business risks. Moreover, the government control over financial sectors' loan leads to the highly possible contraction of new distribution markets. The market trend could bring about the reduction of new demand in PF (Private Financing) business that large construction companies mainly concentrate on, and even the business already obtained has a high risk of being distributed, which could result in substantially low profitability. The currently unstable financial structure of most construction companies is caused by the hike of the prime cost of foreign plants except for that of a few construction companies. If PF (Private Financing) business also faces a difficult situation in such a financial condition, even large construction companies come to have the high possibility of a deficiency in credit rating. Accordingly, the major business that large construction companies concentrate on needs the sufficient business review. It is desirable to make a bid for business guaranteeing stability rather than business solely in consideration of profitability, when participating in a competition for a new construction contract.

Study on the Impact Of Tunnel Construction on Geo-environment - Simulation study on the Gyerong tunnel - (터널굴착이 지반환경에 미치는 영향에 관한 연구 - 계룡산 터널의 시뮬레이션 결과를 중심으로 -)

  • Lim, Hyung-Gyu;Chang, Yoon-Young
    • Journal of Soil and Groundwater Environment
    • /
    • v.13 no.5
    • /
    • pp.88-95
    • /
    • 2008
  • In this study, impact of tunnel construction on groundwater level and flow was investigated by simulation modeling, and tried to find optimal assessment method for minimization of geo-environmental problems due to tunnel construction. As a study area, Gyerong mountain area scheduled for tunnel construction was selected and the impact of tunnel construction on geo-environment compared to situation before construction was simulated. Simulation result showed that groundwater level down was observed during tunnel construction and recovered after completion of tunnel construction.