• 제목/요약/키워드: construction project management system

검색결과 1,505건 처리시간 0.03초

건설관리 패러다임 전환에 따른 건설공사 품질관리 적합성평가 시스템 구축에 대한 연구 (A Study for the Construction Conformity Assessment System According to the New Paradigm of Construction Management)

  • 이갑순;배영주
    • 대한안전경영과학회지
    • /
    • 제19권1호
    • /
    • pp.39-52
    • /
    • 2017
  • The scope of this study is the construction conformity assessment system according to the new paradigm of construction management To minimize the differences between domestic and international state, construction Conformity Assessment is subdivided into system certification and product certification. For the former, WASCON(Worldwide Assessment System of Construction Quality Maturity Stage) is applied. For the latter, AQUA(Advanced Quality Assessment System) was developed and adopted to model project for demonstration. Both systems are designed to enable quantified rating, integrated into PQCS(Project Quality Certification), which is an advanced project quality certification system. The construction work observing PQCS will gain quality score on its own quality certificate(Quality mark on construction itself or facilities is also available, if needed or preferred by customers). This Quality Rating System will inspire and encourage any related parties. PQCS score would let supplier/constructor recognize how much themselves are operating effectively and efficiently, offering them the opportunity of redeeming their weaknesses.

GS건설 TPMS를 통한 동남권유통단지 이주전문상가 현장 PMIS 성공사례 (A Successful Example of the PMIS to Dongnam Distribution Complex Project using TPMS(Total Project Management System) of the GS E&C)

  • 이흥원;박찬정
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.129-134
    • /
    • 2007
  • GS건설은 1996년 한국 건설업계 최초로 EVM 기법을 도입하여 공정과 손익을 연계하여 관리하는 PMS(Project Management System)을 구축하였다. 2006년 PMS에 Lean Construction 이론과 JIT(Just In Time) 개념을 접목하여 낭비요소를 최소화하는 최적의 업무 공정을 정립, TPMS(Total Project Management System)를 완성하여 건설현장에서의 생산성 극대화가 가능해 졌다. TPMS의 맞춤형 포탈정보는 발주처, 감리자, 협력사 등의 프로젝트 관계자들에게 맞춤식 정보를 제공하고 있다. 다양한 관계자들에게 필요한 정보들을 맞춤식으로 제공해 줌으로서 사용의 편리성 및 정보의 이용성을 극대화하였으며, 함께 하는 업무 환경을 제공하여 빠른 의사결정 및 원활한 정보공유를 이룰 수 있다. 본 논문은 TPMS의 동남권 현장 적용을 통해 건설현장에서의 PMIS의 성공적인 모델을 제시하고자 한다.

  • PDF

INDICATOR FOR PERFORMANCE MANAGEMENT OF CONSTRUCTION CALS

  • In-Su Jung;Jin-Uk Kim;Chan-Sik Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1340-1345
    • /
    • 2009
  • Ministry of Land, Transportation and Maritime Affairs has implemented Construction CALS project for improving informationization level of construction industry and for making construction production system efficient. Although an importance of evaluation on level and performance of construction informationziation projects has been emerged, Construction CALS hasn't been evaluated so far. In this study, the performance indicators of construction CALS as the most important base in creating a performance management system were deduced. For this aim, this study reviewed the former researches on system construction for managing performance, analyzed current status of Construction CALS, arranged the relationship between upper strategies and ISP, developed pools of performance indicators, and this study followed IT BSC methodology. As a result, this study developed performance indicators of Construction CALS through four strategies such as globalization and activation of Construction CALS standards, research & development for reaching to international level in construction informationization technology, stabilization of system operation and distribution by publicizing Construction CALS and improving its functions, and policy implementation for managing and coordinating Construction CALS projects. These indicators will be applied to build a system of performance management.

  • PDF

Measuring Performance in Egyptian Construction Firms Applying Quality Management Systems

  • Abd Elhamid, Manal S.;Ghareeb, Sahar.Sh.
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권2호
    • /
    • pp.18-27
    • /
    • 2011
  • Egyptian construction firms (ECF) started recently to adopt quality management system (QMS) as a way to develop and improve their performance as previous studies have shown. However, considering all the firm's aspects in a competitive way is a crucial process for the ECF's culture. This research is trying to indicate the role of the QMS implementation in measuring performance (MP) through developing a model for measuring performance at the organizational level, and to explore its impact on the organizations that adopt QMS. This model is based on specific elements and their related indicators which have been derived from national approaches and models of MP. This model determines the performance level (PL) of the organization that is measured by means of a point system. Weights of the elements in the point system considered both the elements' importance in the international models and its real practice in the ECFs. This model has been validated using another questionnaire and the majority of surveyed experts agreed that the proposed model can be applied effectively.

CONSTRUCTION MATERIAL MANAGEMENT USING SMART MOBILE COMPUTING

  • Kwang-Pyo Lee;Hyun-Soo Lee;Moonseo Park
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.221-228
    • /
    • 2011
  • As construction works have become larger and more complex, improving productivity by introducing Information Technology (IT) is pursued and more effective construction management is needed in construction industry. In this circumstance, many different kinds of project management system is being introduced, and various IT technologies are applied such as Personal Digital Assistant (PDA), Bar Code, Radio Frequency Identification (RFID), Web Camera, and so on. However, these kinds of technologies might cause re-processing of information and ineffectiveness of project because of lack of real time information processing technology or separation between construction sites and management offices. Meanwhile, these technologies rather decrease the construction productivity except for the data saving and database function. Therefore, this research aims to develop Application that can be applied efficiently for construction material management, by understanding problems of former management system with questionnaires and extracting functions with analysis of requirements. In virtue of the construction material management Application which will be developed in this study, it will be possible to input information automatically, to process and check material information in real time, and to identify the location of necessary material. Then, the problem of separation between construction sites and management offices are solved, and as a result, more efficient management of materials in construction sites will become possible. At the same time, this study will investigate the possibility and applicability of new IT device, Smart Phone to construction sites.

  • PDF

선진국의 공사관리 벤치마킹을 통한 도로건설공사 감독자의 공사관리 향상방안 (The Improvement Plan of Project Management for Highway Construction Supervisor using Construction Management Benchmarking of Developed Countries)

  • 이민우;신은영;이교선;박환표
    • 한국건설관리학회논문집
    • /
    • 제7권3호
    • /
    • pp.138-148
    • /
    • 2006
  • 건설공사 현장에서 공공 발주처의 감독자는 공정관리, 품질관리, 안전관리 뿐만 아니라 공사 현장에서 발생하는 다양한 업무를 수행하고 있다. 특히, 한국도로공사 등 4개 공사는 공사특성에 맞게 전문화된 공사현장의 공사관리 업무를 추진하여 왔다. 그러나, 최근 민자사업의 물량 증가와 건설사업관리제도의 도입 등 건설환경의 변화_글 공공 발주처의 감독자는 보다 효율적인 공사관리방식을 도입하여 사업관리의 내실이 필요하게 되었다. 따라서, 본 연구는 국내 공공 발주처의 감독 운영시스템과 선진외국의 공사감독 제도를 조사 분석하여 국내 실정에 맞는 합리적인 공사감독 체계 개선방안을 마련하였다 특히, 본 연구는 고속도로 건설공시 공사감독자의 공사관리방안으로, 검측원의 육성방안과 건설공사 감독업무 매뉴얼, 교육프로그램 로드 맵 구축방안을 제시하였다.

A decision support system (DSS) for construction risk efficiency in Taiwan

  • Tsai, Tsung-Chieh;Li, Hsiang-Wen
    • Smart Structures and Systems
    • /
    • 제21권2호
    • /
    • pp.249-255
    • /
    • 2018
  • Many studies in risk management have been focused on management process, contract relation, and risk analysis in the past decade, but very few studies have addressed project risks from the perspective of risk efficiency. This study started with using Fault Tree Analysis to develop a framework for the decision-making support system of risk management from the perspective of risk efficiency, in order for the support system to find risk strategies of optimal combination for the project manager by the trade-off between project risk and cost of project strategies. Comprehensive and realistic risk strategies must strive for optimal decisions that minimize project risks and risk strategies cost while addressing important data such as risk causes, risk probability, risk impact and risk strategies cost. The risk management in the construction phase of building projects in Taiwan upon important data has been analyzed, that provided the data for support system to include 247 risk causes. Then, 17 risk causes were extracted to demonstrates the decision-making support system of risk management from the perspective of risk efficiency in building project of Taiwan which could reach better combination type of risk strategies for the project manager by the trade-off between risk cost and project risk.

UAV를 활용한 토목공사 현장 모니터링 시스템 개발에 관한 연구 (Development of Construction Site Monitoring System Using UAV Data for Civil Engineering Project)

  • 정주석;한선주;강인석
    • 한국건설관리학회논문집
    • /
    • 제18권5호
    • /
    • pp.41-49
    • /
    • 2017
  • 토목공사 발주기관은 공사현장이 대부분 원거리에 위치하고 담당공무원도 다수의 현장을 관리하게 되므로 간접적 방식으로 현장을 관리하고 있다. 토목공사 현장은 광범위한 작업구역을 가지므로 현장 실무자의 보고에 의한 간접적 관리방식으로는 사업전체의 현황을 신속하게 파악하기가 쉽지 않다. 이러한 문제점을 해소하기 위해 발주기관과 현장간의 현장관리시스템은 오프라인에서 온라인방식으로 변화되고 있다. 본 연구에서는 UAV에서 취득한 현장의 3차원정보를 활용하여 원거리에 위치한 현장과 감독기관간에 관련 정보를 온라인으로 공유할 수 있는 개선된 현장관리시스템을 제시한다. 이를 위하여 연구에서는 다수의 실제 현장의 현장관리 운영체계의 문제점을 분석하여 UAV활용 현장관리시스템에 필요로 하는 공사현황보고 및 온라인 정보관리 등의 주요기능을 도출하였다. 연구에서 개발된 시스템은 실제 공사 중인 현장에 적용하여 활용성을 검증하였으며, 다수의 현장 조사를 통하여 기존의 간접적 현장관리 방식과의 효율성 개선사항을 분석하였다.

형상관리기법을 활용한 대형 프로젝트 정보화 전략개발 (A Study on Information Strategy Development Using Configuration Management in Large-scale Construction Project)

  • 원서경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.66-67
    • /
    • 2018
  • Large-scale construction projects require various license and technologies for the manufacturing and handling processes. Also, the whole life cycle business process management determines the success of the project. Then, the efficiency of the business conducted by stakeholders and their possessed technology should be enhanced in order to strengthen their competitive power. For this reason, many experts pointed out to focus on the improvement of the life cycle process and efficient management. Since it is very important to keep up-to-date data and utilize it for work during the long-term project to reflect changes in the large-scale project, the most important part of the project management in project is information change management. Therefore, the objective of this study is applying configuration management(CM) technique in order to managing change data generated for planning in early phase. The result of this research will certainly assist the large-scale project managers in the development of information change management system.

  • PDF

실적 데이터베이스를 활용한 공통가설공사 관리 시스템 개발 (The Common Temporary Work Management System Using Historical Database)

  • 박경호;이훈구;백종건;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.367-370
    • /
    • 2002
  • 건설 프로젝트의 초기단계에 타당성을 검토함에 있어서 공통가설공사의 경우 설계도서상에 표시가 되지 않거나, 시방서상에 간략하게 서술되어 있기 때문에 담당자의 경험 의존율이 다른 공종에 비해 높다. 이런 초기단계의 결전은 프로젝트의 진행과 더불어 많은 문제점들을 야기 시킬 가능성이 있다. 따라서 최근 활발히 논의가 되고 있는 기존 공사정보에 대한 실적 데이터베이스와 공통가설공사의 분류체계를 포함한 시스템을 개발하여 자료들을 분석, 활용함으로써 시공전(Pre-Construction) 단계의 공통가설공사에 대한 작업 및 원가 예측을 용이하게 하고, 후에 Feed Back 됨으로써 정확한 건설 프로젝트 타당성 분석을 가능케 하고자 한다.

  • PDF