Introduction On the Importance of Engineering Survey in Project Management

  • Meng, Yanlei;Chen, Guiming
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.260-262
    • /
    • 2017
  • During the construction of the project, all surveying and mapping work is collectively referred to as engineering survey. Therefore, the measurement work contains a wide range of content, in the engineering survey, design and construction management stage are involved. To the actual work, the project measurement runs through the project building in a number of stages, and provide basic services. This paper mainly through the analysis of engineering measurement at all stages of the role played by the measurement work in the project management work to do the following description.

  • PDF

특허 분석에 의한 발주자용 중.소규모 현장 비대면 건설사업관리 UI개발 (Development of Non-face-to-face Small and Medium-Sized Construction Project Management UI for Owners through Analyzes construction project management-related patents)

  • 강상찬;장명훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 가을 학술논문 발표대회
    • /
    • pp.67-68
    • /
    • 2020
  • Real-time information on the construction project required by the owner make the project's transparency and overall productivity will be improved. This study analyzes domestic and foreign patents for construction project management to identify trends in technology development, construct cloud-based construction project management system solution UI, and proposes functions and services for each module. Trend research is conducted through patent search, and the analysis is divided into quantitative analysis which means quantitative statistics and qualitative analysis which means the technical contents of each patent. The construction project management system solution is based on smart devices at small and medium-sized sites, allowing both the owner and the construction personnel to share information.

  • PDF

A STUDY ON THE SELECTION CRITERIA OF DELIVERY SYSTEM BY TYPES OF THE PUBLIC CONSTRUCTION PROJECTS

  • Eun-A Choi;Su-Man Choi;Jai-Dong Koo;Nam-Gi Lim;Sang-Beom Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1440-1445
    • /
    • 2009
  • Clients demands have been changed by construction circumstances such as high-technology, megaprojects, and the complexity of construction. Advanced foreign nations have already introduced and applied new project delivery systems (i.e, CM, DB, etc.) to deal with the change of such that. Korea has also promoted variation of the delivery systems for the progressive measure to the rapid changeable situation. Even though government has made his efforts as stated above, some clients have uniformly used those to public construction projects. That is because there are not selection criteria of project delivery system for clients. Therefore, this study presented the selection criteria of project delivery system based on project types in the public large construction projects. In addition, the study has verified the viability of the presented models through consultation with professionals and experts.

  • PDF

Development and Application of Integrated Management System in Nuclear Power Plant Construction Project

  • Lee, Sang Hyun;Byon, Su Jin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.700-701
    • /
    • 2015
  • Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.

  • PDF

Challenges and suggestions of resource planning for standardized concurrent construction

  • Chen, Xingbin;Li, Sining;Kim, Jung In;Fang, Yuan
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.41-49
    • /
    • 2020
  • Concurrent construction offers considerable improvement for shorten the project duration of its production process. Therefore, standardized concurrent construction is widely applied in building construction projects. However, resources planning for standardized concurrent construction project is manually developed by construction manager. This practice is not effective since it is time-consuming and error-prone for managers to identify all project-specific information, distinguish different activity-resource types, interpret these types and analyze how they affect resource allocated on an ad hoc basis. Therefore, this research investigates the opportunity for leveraging activity modeling to enable automated resource planning for standardized concurrent construction during project development, with identifying the characteristics of construction activities under standardized concurrent planning and determining the activity-resources types that affects resource planning. Both will function as a basis for modeling these construction activities in a computer-interpretable manner and for automation in resource planning.

  • PDF

A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

Measuring Performance to Engage the Extended Project Team in Construction

  • Bal, Menoka;Bryde, David
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권1호
    • /
    • pp.1-10
    • /
    • 2015
  • In construction, stakeholders of extended project team play a key role in the overall project performance. Successful integration of stakeholders demands for good management practices at strategic, operational and project levels. Targets and measures to improve the stakeholder performance encourage the creativity and willingness of stakeholders of extended project team to develop the better ways to achieve the project objectives. This paper presents a generic descriptive method, showing how stakeholder's ability and influence impacts on project performance in the construction sector. The findings of a series of interviews with key informants are presented and the following main conclusion is drawn: improving project performance through stakeholder's contribution and measuring their performance can strengthen the project performance. This innovative approach which redefines the process of improving the project performance in construction projects will be of interest to those who intend to manage the projects in practice as well as to those who interested in advancing theory.

Analyzing the Priority of Leadership Elements for Project Manager of Building Construction Project

  • Kim, Jin-Dong;Kim, Gwang-Hee
    • 한국건축시공학회지
    • /
    • 제12권1호
    • /
    • pp.31-41
    • /
    • 2012
  • In construction, the outcome of work depends on the leadership of the project manager, and as a result this has been emerging as an important factor. The purpose of this study is to analyze the main elements of leadership that are essential for project managers, and to rank these elements in order of importance. In this study, leadership and its elements are reviewed through reviewing the literature, and the main elements and their relative importance for project managers were analyzed through questionnaire survey of project managers, contractor engineers, and subcontractor engineers. Through this survey, it was found that the project manager's leadership had a significant influence on the success of a construction project, and this study revealed that the key elements of leadership for project manager could be ranked in the order of resolution, responsibility, and reliance.

Web-system development for the feasibility of national road

  • Park, T.;Shin, E.;Kang, T.;Park, W.;Lee, Y.
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.698-699
    • /
    • 2015
  • For last three years, our research team have conducted the project named "Development of construction project management technology based on BIM/GIS platform. "We developed construction cost estimation system as well as 3D modeling engine at the first two year and established a web-system which could estimate the benefits of the project and further analyze the economic and financial feasibility of the project. This paper mainly focused on the functions and specifications of web-system. The system was composed of two modules: economic feasibility estimation module and financial feasibility estimation module. While the economic feasibility estimation module determines economic feasibility of the project based on traffic demand forecasting from the public's perspective, the financial feasibility estimation module determine financial viability of the project using toll fee of the road from private entity's perspective. Compared with traditional feasibility study, the proposed system provide users with better flexibility which can make users easily to validate the project upon the change of project environments. The system was also verified with an already accomplished project. The verification showed that proposed system could provide satisfactory accurate results with reduced time and resources.

  • PDF

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF