친환경적 설계인자를 적용한 생태복원공사의 시공성 평가 - 거제시 구천천 생태하천 조성공사를 중심으로 - (The Constructability Evaluation of Ecological Restoration Construction Using Environment-friendly Design Factor - In the case of Construction of Gucheon Eco-River in Geoge City -)

  • 안병철
    • 한국환경복원기술학회지
    • /
    • 제16권4호
    • /
    • pp.99-114
    • /
    • 2013
  • In this study, constructability of ecologocal stream restoration process was evaluated and improved approaches for habitat were suggested. The study site is Gucheon River in Geoje city where conducted ecologocal restoration work within maintaining its flood control function. Application of ecological design factors and constructability in the process from planning to construction was analyzed and its results are as follows: In the process of planning and designing, it was focused more on the naturality of Gucheon River rather than the human convinience and ecological design factors were applied within the ecological capacity of the site. First, the indexes for constructability evaluation is selected. It was classified into three major categories as construction quality, design quality and construction administration system. Each index has details, so there are twenty sub indexes for contractibility evaluation. Second, the evaluation results shows that the index most in need of improvement was plumbing construction, followed by Stone construction and pavement construction. design concept was evaluated as appropriate in entire categories. Finally it is suggested that it can be improved in both process of design to enhance the technology and process of construction to enhance the quality management. The constructability of ecological stream needs adaptive management and it must be discussed with its designing which is at the stage before construction. Also it needs discussion with its designer constantly and feed-back process.

SFC로 기술(記述)된 계층제어 구조에서 메모리 효율 향상 (Improvement of Memory Efficiency in Hierarchical Control Structure described by SFC)

  • 유정봉
    • 한국산학기술학회논문지
    • /
    • 제7권2호
    • /
    • pp.126-130
    • /
    • 2006
  • PLC는 산업용 제어시스템에서 널리 사용되고 있으며, 중요한 역할을 하고 있다. PLC에서 사용되는 언어중 SFC는 이산 제어 프로그램에서 순차제어 논리의 기술에 적합한 그래픽 언어이며, SFC로 공정제어 시스템을 구현할 때는 분산제어 구조와 계층제어 구조로 구현하게 된다. 계층제어 구조에서는 서브시스템 간에 동기를 맞추기 위해서 서브시스템은 별도로 구성하고 동기신호만을 주고받게 된다. 그러면 메모리 효율 및 시스템 성능이 좋지 않게 된다. 본 논문에서는 계층제어 구조에서 메모리 효율을 향상시키는 방법을 제안하였고, 실례를 통해 그의 타당성을 확인하였다.

  • PDF

Bootstrap control limits of process control charts for correlative process data

  • Suzuki Hideo
    • 한국품질경영학회:학술대회논문집
    • /
    • 한국품질경영학회 1998년도 The 12th Asia Quality Management Symposium* Total Quality Management for Restoring Competitiveness
    • /
    • pp.174-179
    • /
    • 1998
  • This research explores the application of the bootstrap methods to the construction of control limits for the x charts and the EWMA charts based on single observations with stationary autoregressive processes. The subsample means-based control chars in the presence autocorrelation are also considered. We use a technique for inferring confidence intervals using bootstrap, the percentile method. Simulation studies are conducted to compare the performance of the bootstrap method and that of standard method for constructing control charts under several conditions.

  • PDF

BIM정보를 활용한 강구조물의 공정 물량 통합관리 (Integrated Management of Process Schedule and Quantity Take-Off for Steel Structures using BIM Information)

  • 김진욱;신태송
    • 한국BIM학회 논문집
    • /
    • 제8권2호
    • /
    • pp.10-18
    • /
    • 2018
  • BIM technologies store, share and integrate the information produced in each sector of the construction industry. From this point on, it increases the efficiency of the work. Currently, quantity take-off and process schedule are derived separately based on BIM technology. When calculating the quantity by process, relevant information shall be collected, reinterpreted, and reevaluated as required by the practice. The purpose of this study is to develop an integrated process and quantity management system through BIM collaboration and to build prototypes for steel structures. The main research is to build a construction BIM model for steel structures and a process BIM model through BIM collaboration. Furthermore, necessary information was selected and processed according to the user's needs for integrated management. Relevant integration outcomes are visualized graphically to maximize utilization. Through these studies, a system for integrated control of processes and supplies is provided, and the results are expected to contribute to the improvement of working efficiency and are easily and quickly reflected in design change and process change. In this study, we intended to enhance the usability of information by linking process schedules with quantity calculations based on BIM. Thus, the process for integrated control of the quantity of structural components by process unit and the BIM based schedule information was established. In addition, the efficiency of the information link of the integrated management system was considered for design changes and process schedule changes.

Foundation Differential Settlement Included Time-dependent Elevation Control for Super Tall Structures

  • Zhao, Xin;Liu, Shehong
    • 국제초고층학회논문집
    • /
    • 제6권1호
    • /
    • pp.83-89
    • /
    • 2017
  • Due to the time-dependent properties of materials, structures, and loads, accurate time-dependent effects analysis and precise construction controls are very significant for rational analysis and design and saving project cost. Elevation control is an important part of the time-dependent construction control in supertall structures. Since supertall structures have numerous floors, heavy loads, long construction times, demanding processes, and are typically located in the soft coastal soil areas, both the time-dependent features of superstructure and settlement are very obvious. By using the time-dependent coupling effect analysis method, this paper compares Shanghai Tower's vertical deformation calculation and elevation control scheme, considering foundation differential settlement. The results show that the foundation differential settlement cannot be ignored in vertical deformation calculations and elevation control for supertall structures. The impact of foundation differential settlement for elevation compensation and pre-adjustment length can be divided into direct and indirect effects. Meanwhile, in the engineering practice of elevation control for supertall structures, it is recommended to adopt the multi-level elevation control method with relative elevation control and design elevation control, without considering the overall settlement in the construction process.

Earned Value 기반 프로젝트 관리체계 및 사례연구 (Earned Value based Construction Project Control System)

  • 이유섭;조창연;오규환;김정훈
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.123-130
    • /
    • 2002
  • 건설공사 관리프로세스 및 관리체계는 건설공사를 성공적으로 수행하는데 필수적인 요소이다. 이러한 공사관리체계는 건설공사를 계획${\cdot}$관리함에 있어서 일정, 비용, 성과측정, 현금흐름(cash flow)예측 등의 업무체계가 통합 또는 연계될 때, 효과적인 관리도구로 활용할 수 있으며, 이는 건설공사에 대한 정확하고 신속한 의사결정을 도모하고 관리의 효율성을 증대시킬 수 있다. 이를 위해 우리나라 건설업계에서는 건설공사의 수행과정을 효과적으로 계획하고 통제, 관리한 수 있도록 업무프로세스를 혁신하고, 이를 지원하는 공사관리시스템의 구축에 많은 시간과 노력을 기울이고 있다. 본 연구에서는 건설공사를 효과적으로 계획, 관리하여 업무프로세스의 투명성을 확보하고 비용효과를 증대시키기 위한 방안의 일환으로 구축되고 있는 공사관리시스템의 개발 동향과 기능적 특징을 비교 분석하고, 구축된 공사관리시스템이 유효하게 기능할 수 있도록 하기위한 현안과제와 대응방안을 제시하고 있다.

  • PDF

EV기반 공사관리시스템 기능의 비교분석 연구 (Earned Value based Construction Project Control System)

  • 이유섭
    • 한국건설관리학회논문집
    • /
    • 제5권1호
    • /
    • pp.168-174
    • /
    • 2004
  • 건설공사 관리프로세스 및 관리체계는 건설공사를 성공적으로 수행하는데 필수적인 요소이다. 이러한 공사관리체계는 건설공사를 계획$\cdot$관리함에 있어서 일정, 비용, 성과측정, 현금흐름 예측 등의 업무체계가 통합 또는 연계될 때, 효과적인 관리도구로 활용할 수 있으며, 이는 건설공사에 대한 정확하고 신속한 의사결정을 도모하고 관리의 효율성을 증대시킬 수 있다. 이를 위해 우리나라 건설업계에서는 건설공사의 수행과정을 효과적으로 계획하고 통제, 관리할 수 있도록 업무프로세스를 혁신하고, 이를 지원하는 공사관리시스템의 구축에 많은 시간과 노력을 기울이고 있다. 본 연구에서는 건설공사를 효과적으로 계획, 관리하여 업무프로세스의 투명성을 확보하고 비용효과를 증대시키기 위한 방안의 일환으로 구축되고 있는 공사관리시스템의 개발 동향과 기능적 특징을 비교 분석하고, 구축된 공사관리시스템이 유효하게 기능할 수 있도록 하기위한 현안과제와 대응방안을 제시하고 있다.

항공 및 해상 관제기술 사례연구를 통한 건설장비 관제 시스템 활용 방안에 관한 연구 (Application of Construction Equipment Fleet Management System through the Case Study of Air and Vessel Traffic Control Technology)

  • 박지수;서종원
    • 대한토목학회논문집
    • /
    • 제35권2호
    • /
    • pp.493-500
    • /
    • 2015
  • 최근 세월호사고와 관련하여 항공과 해상교통 관제센터의 중요성이 급격히 증가하고 있다. 항공, 해양 분야에서는 이미 모니터링과 관제 기술을 사용하고 있다, 하지만 복잡하고 위험한 건설현장 운영을 위한 모니터링과 관제 시스템은 아직 쓰이지 않고 있다. 모니터링/관제시스템의 역할은 건설현장에서 건설장비와 관제센터 간의 효율적인 의사소통을 요구하며, 정확한 시공과 건설현장에서의 위험요소 파악을 위한 방안을 제시해주는 역할을 필요로 한다. 따라서 본 연구는 건설장비 관제시스템의 개발을 위해 관제 시스템을 활용하고 있는 항공, 해양관제센터와의 비교를 통해 조종자와 관제센터간의 의사소통에 관하여 연구하고자 한다.

점진적 스마트 팩토리 환경 구축을 위한 CNC 절단 장비 기반 원격 제어 시스템 개발 (Development of Remote Control System based on CNC Cutting Machine for Gradual Construction of Smart Factory Environment)

  • 정진화;안동혁
    • 정보처리학회논문지:컴퓨터 및 통신 시스템
    • /
    • 제8권12호
    • /
    • pp.297-304
    • /
    • 2019
  • 통신, 센서, 인공지능 등의 기술 발전으로 인해 스마트 팩토리 구축이 진행되고 있다. 스마트 팩토리는 기존의 자동화 공정에서 생산되는 데이터를 대상으로 기계 학습과 같은 지능화 기술을 활용해 효율적인 공정 제어를 목표로 한다. 스마트 팩토리로의 구축으로 인해 생산성이 높아지지만 비용도 높아진다. 따라서 소규모 업체들은 스마트 팩토리로 단계별 전환이 효율적이다. CNC 절단기 기반의 소규모 스마트 팩토리 구축을 위해서 본 논문에서는 기존 제조 장비의 데이터를 수집, 모니터링 및 제어할 수 있는 원격 제어 시스템을 제안한다. 원격 제어 시스템의 구조 및 설계와 효율적인 센싱 데이터 전송 방법 등을 제시하였다. 실현 가능성을 검증하기 위해 CNC 절단 장비를 대상으로 시스템을 구현하였고 기능을 검증하였다. 성능 평가를 위해 모니터링 웹 페이지 접속시간을 측정하였고, 구현된 시스템이 사용 가능한 수준이라는 것을 확인하였다.

국내 건설 현장의 철근공사 실태조사에 관한 연구 (The Study On The Actual Condition Of Rebar Work In Korean Building Construction)

  • 이응균;박우열;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2002년도 학술.기술논문발표회
    • /
    • pp.133-138
    • /
    • 2002
  • Rebar work takes up big proportion in a construction work. The current process of purchasing, cutting and election, and working of rebar induces a lot of loss in rebar. This study is focused on analyzing the problem and the present condition of the process from the calculating of rebar quantifies to the actual constructional stage through surveying those who have experience in the estimation department, or the construction site of a domestic construction company. Many reform measures such as diversification of standard(i.e., 8-meter)bar, calculation of rebar quantities and construction according to the rebar election drawing, expansion of accuracy in layout plan, thoroughness in examination of layout plan in advance, utilization of the worked material, systemization of rebar control(management), and a shift in attitude of the field(site) manager were proposed as the result of the survey.