• Title/Summary/Keyword: construction problems

Search Result 4,587, Processing Time 0.031 seconds

A Comparative Analysis of Hindrance Factors to Labor Productivity in Each Construction Site Using the IPA (IPA를 이용한 건설 현장별 노동생산성 저해요인 비교)

  • Jeong, Jae-Ho;Lee, Suk-Won;Ahn, Byung-Ju;Jee, Nam-Yong;Kim, Jae-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.71-82
    • /
    • 2014
  • Korea's labor productivity in construction sites is dependent on experience and act in accordance with the human element of the construction workers. In order to increase the work productivity of the construction site that requires a strategic management to potentially hindrance factors of labor productivity. However, without considering the potential problems, management of labor productivity in prior studies is focused only on the immediate problems. The purpose of this study is to compare the site-specific analysis of labor productivity impediments using easy IPA to identify potential causes. As a result of the analysis was to identify the realistic problems of job insecurity and poor working conditions as well as economic problems. It is expected that it is possible to provide the basic data to strategy suggestions for long-term labor productivity improvement of the construction site.

A Case Study on Implementing Highway Approval/Permission System in Construction CALS (건설CALS에서 고속도로인허가 시스템 구현 사례)

  • 윤주용;김민홍;이영재
    • The Journal of Society for e-Business Studies
    • /
    • v.4 no.3
    • /
    • pp.43-62
    • /
    • 1999
  • This paper is to analyze business activities of approval/permission (A/P) and to describe its problems. To conduct the A/P business activities currently, there are many problems such as complex business process and different business policies among the each organization. In order to solve the problems, this paper suggests the A/P system of highway construction CALS (Commerce at Light Speed). CALS, a top down vision of complete computing integration, promises to support electronic data exchange. The A/P system is designed to classified documents based on CALS standard and store them to database. The data register to the A/P system by the Internet, and each construction company can use the A/P system by Internet also. Benefits of the A/P system is reduction in junk documents for approval/permission actives, improvement in conduct and services life cycle support.

  • PDF

Analysis of Validity for Implementation of Telematics and Suggestion of Feasibility Analysis in Construction Fields (Telematics 기술의 건설현장 적용을 위한 타당성 분석 및 경제성 분석을 위한 요인 도출)

  • Lee, Tai-Sik;Lee, Dong-Wook;Koo, Ja-Kyung
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.947-952
    • /
    • 2005
  • Nowadays, dependency upon the construction equipment is getting bigger and the mass of equipment cost is increase, those are indirect evidence of important of equipment. But construction field has the characteristic that is the various activities and wide work area. These make many problems in the operating of equipments. These problems bring about diminution of workability and productivity, in result it makes increase of cost and time. Owing to solve the problems, this study introduce of Telematics technique. This study analyzes process into its work and management for construction equipment using at the land work, and will apply Telematics to the field equipments.

  • PDF

Measures for Improving the Quality of Temporary Container Classrooms (컨테이너 임시교사의 품질개선방안)

  • Yu, Byong-Jae;Bang, Hong-Soon;Lee, Jong-Sung;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.38-39
    • /
    • 2021
  • The use of temporary container classrooms has increased in recent years due to the development of the construction industry and renovation or rehabilitation of schools. Therefore, various problems, such as errors during assembling, design and insulation issues, and noise problems, have surfaced during the construction of temporary container classrooms. This study analyzes the causes of assembly errors during the manufacturing and installation processes to improve the quality of temporary container classrooms. Assembly errors are caused by non-level planes and inaccurate cutting during the manufacturing process. In the installation process, poor leveling is a major factor that causes errors during the assembly of temporary container classrooms. These causes result in uneven horizontal or vertical planes and uneven height. To solve these problems, quality improvement measures, such as pin connection, jig, joint coupling, and surface plates are proposed in this study.

  • PDF

Cutting-edge Technologies to Achieve a Higher Level of Modular Construction - Literature Review

  • Lee, Seungtaek;Choi, Jin Ouk;Song, Seung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.536-542
    • /
    • 2022
  • Cost overruns, schedule delays, and a shortage of skilled labor are common problems the construction industry is currently experiencing. Modularization and standardization strategies have the potential to resolve the various problems mentioned above and have been applied for various construction applications for a long time. However, the level of modularization remains low, and modular construction projects have not been getting the full benefits. Thus, this review investigated the cutting-edge technologies currently being utilized to develop the modular construction field. For this paper, qualified research papers were identified using predetermined keywords from previous related research papers. Identified literature was then filtered and analyzed. According to the included reviews, several technologies are being developed for modular construction. For example, automated design and monitoring systems for modularization were developed. In addition, research labs are utilizing robotic arms for modular construction to achieve a high level of completion in the construction industry, as is seen in the manufacturing industry. Despite these efforts, more research and development are necessary because some automation technologies still require manual activities. Thus, there is great potential for further development of modularization techniques, and further research is recommended to achieve high levels of modularization.

  • PDF

The Way of Improving the Working Environment for Female Workers on Construction Site Based on Construction Welfare Facilities

  • Pak, Sungsine;Shin, Chang-Keun;Lee, Sang-Hak
    • Architectural research
    • /
    • v.22 no.2
    • /
    • pp.63-73
    • /
    • 2020
  • This paper reports problems of current working environment on construction site in South Korea from a female laborers' point of view and proposes solutions to improve the environment. To investigate and analyze the problems, a questionnaire survey and a focus group interview were conducted with 341 engineers and 557 laborers. Among them female engineers and female laborers were 51 and 136 respectively. Findings are the facilities related with welfare facilities such as lavatories, shower rooms, lounges and changing room, etc. for women were not sufficient and even not installed only for women because all of the planners for the facilities were men and The Standard of Estimate does not consider gender distinction. The data on the trade and the number of female laborers were not recorded and this study confirmed the number and the proportion of female laborers according to construction progress i.e. the proportion of female laborers were 0% ~ 11% (average 6%) at 26 construction sites having 2% ~ 92 % construction progress. In order to solve these problems, gender education for the welfare facility planner is required and the current Standard of Estimate should be revised considering female laborers after collecting the site data for the number of female laborers according progress and the increase in the construction cost should be reflected in the contract amount accordingly. Conclusively temporary work planning related with welfare facilities should be established and conducted in terms of gender equality at construction sites. In addition, improving working environment on construction sites for female laborers will enhance the company's image and also helping solve the labor shortage problem by women laborers engaging in construction industry easily.

A Study on the methodology of applying the CALS/EC Construction Drawing Information Exchange Standard(STEP) in Design Fields (CALS/EC 건설도면 정보교환 표준(STEP)의 설계분야 적용 방안에 관한 연구)

  • Kim In-han;Choi Jung-sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.163-168
    • /
    • 2001
  • In the domestic construction field, there are a lot of problems related to construction information exchange and sharing owing to the absence of construction drawing information exchange standard. To solve the problems effectively, it is necessary to apply STEP standard that is international standard and standard technology for achieving the establishment of Construction CALS. This study focus on suggesting a methodology to solve problems which occur to the current construction drawing information exchanging and sharing practice. The domestic and foreign standardization projects related to the construction drawing information have been investigated and analyzed. In result, a methodology of applying the STEP standard has been suggested. In addition, a verification and certification methodology for applying the CALS/EC construction drawing information exchange standard(STEP) have been suggested.

  • PDF

A Study on the Mechanized Construction for Common Ducts in a Road Tunnel (도로터널 공동구의 기계화 시공에 관한 연구)

  • Moon, Kyoung-Sic;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1937-1944
    • /
    • 2014
  • In recent years, common ducts have been installed and operated in the sidewalls of tunnels to prepare for emergencies in tunnel construction and maintenance. The installation of common ducts is done mainly by humans. Problems with cost increases are inherent in tunnel construction by humans due to the safety risks and the economic inefficiency of humans performing construction activities. Among the problems that arise are poor illumination due to the use of temporarily installed electricity, the risk of accidents due to the confined workspaces, and workers avoiding work tasks because of the poor environment in tunnel. Ideas for solving these problems were developed using a value engineering (VE) process, and mechanized construction was identified as a promising solution. To verify the effectiveness of mechanized construction of a common duct in tunnels, experimental construction work was carried out, and mechanized construction was proven to directly improve the constructability and economic efficiency of common duct construction. In addition, reducing human involvement in common duct construction in tunnels is expected to improve safety, and because of the continuous concrete placement technique used, the finish and appearance of the ductwork are improved.

A Study on Analytic Hierarchy Proces for Construction Planning -Research on Examples of Railway Route Selection- (건설계획 수립시 계층분석적 의사결정법 적용방안에 관한 연구 -철도노선 선정시 활용사례 연구-)

  • Sohn, Jin-Hyeon;Cha, Cheol
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.10 no.4
    • /
    • pp.249-254
    • /
    • 2007
  • Recently, the items of construction planning have magnified and specialized and the problems occurring at the first step of the construction planing process have complicated. In this research, AHP(Analytic Hierarchy Process) method which is simple to apply and clear to decide has been proposed when a people making a plan at the first step of the construction planing process. As an example, the best solution has been obtained in a railway construction line choice that consist of various items by applying for this method, which proves the possibility of application of this method to the complicated problems.

  • PDF

A Study on the Improvement of Fire Safety in high-rise Building Construction in Legal aspects (법규적 측면에서 고찰한 고층 건축물 공사현장 화재안전 확보방안)

  • Park, Chan-Seok;Jeong, Il-Kyun
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.1
    • /
    • pp.21-32
    • /
    • 2015
  • High rising of the buildings offers a number of risk factors than ever before with regard to fire prevention. Especially in the construction site of high-rise buildings, people waste golden-time during the evacuation because temporary fire fighting facilities are not installed and transferred to a large fire because of fire suppression failure. In this study, the researcher derives the problems of fire protection in high-rise buildings construction sites and proposed the measures in such the legal aspects as fire building construction code and etc. There are the legal improvements such as orders of construction suspension in the problems of fire safety, appointing fire safety manager, temporary fire protection installation standards, enhancing penalty provisions regarding the use of fire, operating self fire brigade, confirming on-site after completing fire-protection facalities, establishment or strengthening special fire-protection investigations.