• Title/Summary/Keyword: construction periods

Search Result 422, Processing Time 0.035 seconds

Derivation of the Construction Process for Precast Concrete System based on Off-Site Construction (OSC(Off-Site Construction)기반 PC공법의 시공 프로세스 도출)

  • Jun, Young-Hun;Bae, Byung-Yun;Yun, Won-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.289-290
    • /
    • 2021
  • The PC system has advantages in terms of project management, such as shortening the construction period and reducing costs. However, it is difficult to activate the technology due to insufficient application of the technology. Therefore, there is a need for a strategy to expand and activate the PC system. This study is a basic research for PC construction project management, and its purpose is to derive the entire construction process from factory production of PC components to on-site construction. In this study, the construction process of the PC system was derived through literature review, and the main matters for the construction process management of PC system were confirmed in the analysis process. In the future, the results of this study are expected to be used as basic data for research for PC project management, such as deriving construction classification and calculating construction periods.

  • PDF

Performance Assessment of Hollow Precast Segmental PSC Bridge Columns (중공 프리캐스트 세그먼트 PSC 교각의 성능평가)

  • Kim, Tae-Hoon;Park, Young-Ky;Kim, Young-Jin;Shin, Hyun-Mock
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.14 no.1
    • /
    • pp.51-62
    • /
    • 2010
  • The purpose of this study was to investigate the performance of hollow precast segmental PSC bridge columns. The proposed system can reduce work at a construction site and makes construction periods shorter. Shortened construction times, in turn, lead to important safety and economic advantages when traffic disruption or rerouting is necessary. Two hollow precast segmental PSC bridge columns were tested under a constant axial load and a quasistatic, cyclically reversed horizontal load. A computer program, RCAHEST (Reinforced Concrete Analysis in Higher Evaluation System Technology), for the analysis of reinforced concrete structures, was used. The proposed numerical method gives a realistic prediction of performance throughout the loading cycles for several test specimens investigated.

A Study on the Evolutionary Process of Ddeulzip in Euisung Kim's Family at Andong Area (안동권(安東圈) 의성(義城) 김씨(金氏) 뜰집의 변천과정(變遷過程))

  • Kim, Hwa-Bong
    • Journal of architectural history
    • /
    • v.23 no.2
    • /
    • pp.25-37
    • /
    • 2014
  • The purpose of this study is to analyze the evolutionary process of Ddeulzip. The subject of this study is a clan family of Euisung Kim in Andong Area. Ddeulzip's evolutionary process in the construction and management is divided into largely three periods. The establishment and changing process of Ddeulzip for Euisung Kim's family are analyzed according to three periods called the early (15~16C), mid(17~18C) and late(19~20C). The characteristics of the early period are that they created their own ancestral building form of Ddeulzip. Those of the mid period are in their strong will not only to preserve their on ancesteral housing but also to make additional construction of Ddeulzip. And during the late period, although the construction of new Ddeulzip was started in the early stage, no more formation of Ddeulzip was made as it approached toward the late stage. And most important point is smaller construction space (gan) dan first time. The residential Ddeulzip of Euisung Kim's family created at the start of Chosun Dynasty can be regarded as an representative example that shows a typical form of housing by noble residents at the time.

Structure and Construction Technology Analysis about Construction Sequence Change for Superstructure Construction Period Reduction in Top-down Method (역타공법 중심의 골조 공기단축을 위한 시공시퀀스 변경에 따른 구조해석 및 요소기술 분석)

  • Park, Yong-Hyeon;Ju, Young-Kyu
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.6
    • /
    • pp.101-109
    • /
    • 2019
  • The purpose of this study is to improve a general Top-Down construction process for superstructure construction period reduction. In a general Top-Down construction sequence, the ground floor slab is set up first. Subsequently, 1st basement level construction including core walls is constructed. Initiation of the ground level superstructure gets waited until then. In this study, removable deck plate installation on the bottom of the core walls of ground level is preceding the concrete casting, therefore, ground level superstructure construction is able to get started earlier. Up to first typical floor concrete casting, total of seventy-two working(calendar) days will be resulted in a reduction from the total construction periods.

Effect of 5%Mg alloying in Al wire on corrosion resistance performance in saline solution (식염수에서 내식성 성능에 대한 Al 와이어의 5%Mg 합금 효과)

  • Singh, Jitendra Kumar;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.93-94
    • /
    • 2022
  • The presence of chloride (Cl-) ions in environments causes localized corrosion resulting decrease the durability of the structures. In this study, 5% Mg containing Al alloys (Al-5Mg) wire used vis-à-vis compared its corrosion resistance with pure Al in 3.5wt.% NaCl solution with exposure periods. Initially both wires exhibited identical open circuit potential (OCP) attributed to the presence of native oxide film on the surface but with the exposure periods it shifted towards active direction owing to the dissolution of oxide film. The pure Al continuously shifted the OCP towards active direction while Al-5Mg shows stabilization of OCP after 8 days of exposure. The OCP of Al-5Mg is slightly higher compared to pure Al wire owing to the activeness of Mg. The total impedance of the Al-5Mg alloy is almost three times greater than pure Al with exposure periods in 3.5 wt.% NaCl solution. It might be formation of Al-Mg LDH (layered double hydroxide) thin film onto the surface.

  • PDF

Determination of the Cold Weather Concreting Period and Early Frost Damage Risk Using Climate Data of Korea (기상자료를 이용한 우리나라 한중콘크리트 적용기간과 초기동해 위험일 산정)

  • Han, Min-Cheol;Lee, Jun-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.1
    • /
    • pp.73-81
    • /
    • 2017
  • In this paper, the periods of cold weather concrete and early frost damage depending on each region in South Korea were studied using the climate data from Korea meteorological administration. The specifications of Korea Concrete Institute(KCI) and Architectural Institute of Japan(AIJ) were applied to provide the periods of cold weather concrete. The periods of early frost damage risk(EFD) were calculated by Hasegawa's suggestion depending on 91 cities in Korea. Climate data for 5 years (2008~2012) were used to obtain both of the periods. Existing data from 1971 to 2000 were also used to compare differences in the periods between past and present study. The periods of cold weather concrete by KCI were calculated about 98 days on average. As the latitude goes up and close to mountain areas, the periods tend to be increased. The periods by present study was shown to be reduced compared to that of previous study by 1~2days. The period of EFD was provided with the level of daily lowest temperature from $-5^{\circ}C$, $-2^{\circ}C$ and $0^{\circ}C$. The beginning day of the period of EFD was earlier than the period of cold weather concrete and the finishing day of the period of EFD was later than the period of cold weather concrete.

Effects of a Dam Construction on the Radial Growths of Pinus densiflora (댐건설이 소나무의 연륜생장에 미치는 영향)

  • 정연숙
    • The Korean Journal of Ecology
    • /
    • v.21 no.3
    • /
    • pp.251-255
    • /
    • 1998
  • To elucidate the effects of a hydroelectric dam construction on annual ring growth of Pinus densiflora, the annual ring widths of 68 trees collected from 7 sites were closely examined. The result was analyzed to ask three special questions first, whether there are real effects of dam construction on the radial growth second, would the magnitude of the effect be different due to two periods of under-construction and post-construction the last, would it be different among age classes. Annual ring growth has been significantly enhanced by the dam construction. Specially, its effect was marked after the construction was finished and the reservoir was filled up with water. There was, however, no remarkable evidence that pine growth would be reduced while the dam was under construction, even though there was a minor decreasing trend. The magnitude of the effect was different among age groups. That is, the changed condition after the construction enhanced relatively the growth of aged trees monre. According to other meterological research since the dam was constructed, the reasons of enhancing pine growth assumed to be the increase of daily temperature, the decreased of daily temperature difference and the increased of rainy days.

  • PDF

Absolute Comparison of Construction Periods between Precast Concrete and Reinforced Concrete Apartment Buildings (PC 및 RC공동주택 골조공사에 대한 공사기간 절대비교)

  • Kim, Ki-Ho;Lee, Bum-Sik;Kim, Jin-Won;Kim, Yeon-Ho;Lee, Dong-Gun;Sohn, Jeong-Rak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.293-294
    • /
    • 2023
  • In accordance with recent changes in construction trends, interest in introducing the OSC, such as the Precast Concrete, is increasing in apartment buildings. In domestic studies, studies on the prediction of the construction period of PC apartment buildings through simulation have been conducted, but there is no study on the comparison of the construction period according to the actual construction of Precast Concrete(PC) and Reinforced Concrete(RC). Therefore, this study seeks to grasp the technology of the current PC construction method and to secure the original technology of project management through comparison of the absolute time of frame construction for PC and RC buildings composed of the same plane.

  • PDF

A Study of the Economic Design of Rubble Mould Breakwaters Using ADS(Automated Design Synthesis) Optimization Program (ADS 최적화 프로그램을 이용한 사석 방파제의 경제성 설계에 관한 연구)

  • 민석진;김성득
    • Journal of Ocean Engineering and Technology
    • /
    • v.17 no.6
    • /
    • pp.16-22
    • /
    • 2003
  • In this paper, the method of determining the economically-optimal design section of rubble mound breakwater, using ADS program, was studied to supplement the deterministic approach. First of all, the design waves are computed, according to the return periods, using the Weibull distribution from the data of waves at the location of the breakwater. In order to take an optimal section, according to the return periods, the ADS program was used. The restriction conditions and objective functions are decided from the references of the specifications and standard manuals for Coastal and Harbor Construction Work. Results from this study support the ADS program as an appropriate method for determining the economically-optimal section of rubble mound breakwater, comparing the construction costs and the initial and damage repair costs for its life time.

New Hollow RC Bridge Pier Sections with Triangular Reinforcement Details: I. Development and Verification (삼각망 철근상세를 갖는 새로운 중공 철근콘크리트 교각단면: I. 개발 및 검증)

  • Kim, Tae-Hoon;Lee, Seung-Hoon;Lee, Jae-Hoon;Shin, Hyun-Mock
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.19 no.3
    • /
    • pp.109-120
    • /
    • 2015
  • The purpose of this study was to investigate the performance of new hollow reinforced concrete (RC) bridge pier sections with triangular reinforcement details. The proposed triangular reinforcement details are economically feasible and rational and facilitate shorter construction periods. A model of pier sections with triangular reinforcement details was tested under quasi-static monotonic loading. As a result, proposed triangular reinforcement details was equal to existing reinforcement details in terms of required performance. In the companion paper, the parametric study for the performance assessment of new hollow RC bridge pier sections with triangular reinforcement details is performed.