이산 사건 시뮬레이션을 활용한 건설공정 CO2 배출량 추정 시스템 (An Estimating System for the CO2 Emissions using Discrete Event Simulation)

  • 이창용;곽한성;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.196-197
    • /
    • 2014
  • Low carbon construction is an important operation management goal such as cost, time, and quality in construction community. This paper introduces a system which measures the variability of carbon dioxide amounts. First, this system allows creating construction operation models of which the level of detail is breakdown into the work task level. Second, the system implements sensitivity analysis along with a ranges of resources that are allocated in an operation model. It facilitates to find the optimal resource combination using the operation performances such as the amount of emissions, operation completion time, and cost. Lastly, it identifies the best fit probability distribution functions of performance criteria given a certain resource combination. It allows project manager to query the percentages to complete the operation within a limitation specified by the system users.

  • PDF

DECISION SUPPORT SYSTEM FOR OPTIMAL SELECTION OF HAUL ROUTES BASED ON TIME SLOTS IN EARTHMOVING OPERATION

  • Sang-Hyeok Kang;Kyeong-Geun Baik;Hyun-Gi Baek;Hyeong-Gi Park;Jong-Won Seo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1134-1139
    • /
    • 2009
  • Haul routes for earthmoving operation need to be carefully selected because the decision on the haul routes could make a significant difference in the project's cost and time. This paper proposes a decision support system for improving productivity of earthmoving operation that helps construction managers choose the best haul routes of trucks based on time slots. Also, a methodology for optimal selection of haul routes considering traffic conditions and topographic conditions of the routes is explained. Raster data model is used to find an available shortest path based on cost weighted distance. A system was developed on a geographic information system environment for efficient database management and easy manipulation of graphical data. A real-world case study was conducted to verify the applicability of the proposed system.

  • PDF

터널 버력처리 공정의 시뮬레이션 적용성에 관한 연구 (Application of Discrete Event Simulation on Tunnel Muck Hauling Operations)

  • 김경민;서형범;황호정;김경주
    • 한국건설관리학회논문집
    • /
    • 제8권1호
    • /
    • pp.141-149
    • /
    • 2007
  • 시뮬레이션은 건설관리를 위한 도구로써 많은 잠재력을 가지고 있으나, 국내의 경우 대단히 제한된 범위에서 마이크로 프로세스의 공정 평가에 적용을 시도하고 있는 단계에 있다. 시뮬레이션을 건설 공정에 적용하기 위해서는 현장 특성을 반영한 입력 데이터 수집과 모델 구축에 상당한 노력이 필요하다. 본 연구에서는 시뮬레이션 모델 구축을 위한 장비 운영 데이터 활용과 시뮬레이션 모델 구축 방법론을 소개하고, 현장 측정 데이터와의 검증을 수행하였다. 그리고 버력 처리 시스템의 전체 운행 주기(Cycle Times)를 결정하는 주요 요인을 분석하고 장비운영 계획을 수립하기 위한 시뮬레이션 활용 방안을 제시하였다.

건설공사 사후평가 제도 활성화 방안 수립 (Strategies for Facilitating Post-Construction Evaluation and Management System)

  • 이강욱
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.379-380
    • /
    • 2023
  • The Post-Construction Evaluation and Management System has been operated over the past 20 years not only to analyze the performance of large-scale construction projects, and but also to provide useful reference data for future similar projects. Although the Post-Construction Evaluation and Management Center has been legally designated and operated since 2020, various problems have been occurring in the operation of the system. Accordingly, this study proposes strategies for facilitating Post-Construction Evaluation and Management System in terms of the following three aspects: (1) improving the implementation rate of post-construction evaluation; (2) improving the information management system related to post-construction evaluation; (3) improving the utilization of post-construction evaluation outcomes. Based on the results of this study, a specific action plan will be prepared, which is expected to contribute to the efficiency of construction project performance management in the future.

  • PDF

Risk Factors Affecting Equipment Management in Construction Firms

  • PHAM, Cuong Phu;NGUYEN, Phong Thanh;PHAN, Phuong Thanh;NGUYEN, Quyen Le Hoang Thuy To;LE, Loan Phuc;DUONG, My Tien Ha
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제7권11호
    • /
    • pp.347-356
    • /
    • 2020
  • Mechanization and automation constitute an essential stage in the production and operation of any company, as one of the determinants of increase in labor productivity and decrease in product price, while significantly contributing to shortening of the lead time. Businesses are, therefore, able to quickly put projects into operation, improving economic efficiency, quality, and aesthetics, which speeds up the national economic growth. For the construction industry to be the most effective, modern construction equipment is a necessity. It is one of the five main resources of a construction project. Thus, effective construction equipment management contributes to the success of a project and benefits the relevant construction companies economically. This paper presents the critical risk factors affecting equipment management and proposes suitable solutions. The questionnaire-based survey with experienced experts in the construction sector on the management of the likelihood and consequence of risk factors revealed thirty-two risks for equipment management in construction companies. These factors fell into six groups: (i) site organization-related risks; (ii) management-related risks; (iii) owner-related risks; (iv) supplier-related risks; (v) legal risks, and (vi) site condition-related and external risks. The results showed that management-related factors contributed to the most significant risks and problems for equipment management in construction companies.

INDICATOR FOR PERFORMANCE MANAGEMENT OF CONSTRUCTION CALS

  • In-Su Jung;Jin-Uk Kim;Chan-Sik Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1340-1345
    • /
    • 2009
  • Ministry of Land, Transportation and Maritime Affairs has implemented Construction CALS project for improving informationization level of construction industry and for making construction production system efficient. Although an importance of evaluation on level and performance of construction informationziation projects has been emerged, Construction CALS hasn't been evaluated so far. In this study, the performance indicators of construction CALS as the most important base in creating a performance management system were deduced. For this aim, this study reviewed the former researches on system construction for managing performance, analyzed current status of Construction CALS, arranged the relationship between upper strategies and ISP, developed pools of performance indicators, and this study followed IT BSC methodology. As a result, this study developed performance indicators of Construction CALS through four strategies such as globalization and activation of Construction CALS standards, research & development for reaching to international level in construction informationization technology, stabilization of system operation and distribution by publicizing Construction CALS and improving its functions, and policy implementation for managing and coordinating Construction CALS projects. These indicators will be applied to build a system of performance management.

  • PDF

USING GIS TO IMPROVE ROADWAY CONSTRUCTION PLANNING

  • Sanghyeok Kang;Jongwon Seo
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.643-648
    • /
    • 2005
  • The planning process for roadway construction involves a large amount of information on design, construction methods, quantities, unit costs, production rates, and site conditions. Therefore, it is very important to acquire, manage, and process the necessary information efficiently to produce a rigorous construction plan. GIS (Geographic Information System) is a very effective tool for integrating and managing various types of information including spatial and non-spatial data required for roadway construction planning. This paper proposes a GIS-based system for improving roadway construction planning with its 'Interactive Space Scheduling' and 'Operation Level Planning' functions. The proposed system can assist construction planners in a unique way by integrating design and construction information and creating modularized design elements for space scheduling in real time. It is expected that the proposed system could improve the efficiency of roadway construction planning.

  • PDF

Lifting Load Recording and Management Method of the Lift for Construction Based Sensing Information

  • Taekyu Ko;Joonghwan Shin;Kyuhyup Lee;Soonwook Kwon;Chung-Suk Cho;Suwan Chung;Goeun ,Choi
    • 국제초고층학회논문집
    • /
    • 제11권2호
    • /
    • pp.125-135
    • /
    • 2022
  • While buildings in recent days become taller and larger, many problems occur during the management of construction. Particularly, as the vertical movement of manpower and materials during construction has become longer while the lifting frequency and load increase, the need for a good lifting management practice is also increasing. Therefore, this study presents a real-time lifting performance monitoring system that can store and manage lifting records for construction management. Through review of literature and preceding studies related to construction lift, the concept of lift planning and operation management was understood, leading to the development of a system to monitor lifting operation and performance information. This system enabled quick measurement of the lifting performance during construction phase while responding to changes in the project schedule. To verify this system, a case study was conducted in which the current status and characteristics of the sensing-based lifting performance were derived.

A MODEL OF RISK MANAGEMENT PLAN AND SYSTEM FOR THE CONSTRUCTION PHASE

  • Seon-Gyoo Kim;Chan-Jeong Park ;Moon-Serk Yang;Jin-Bong Kim ;Hyung-John Shin
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.341-346
    • /
    • 2005
  • After the IMF shock, some major construction companies in Korea have been motivated to avoid and mitigate various risk factors which could be critical and catastrophic events to corporate revenue and organization internally or externally. It means that they are trying to introduce and set up a risk management plan and system suitable to their organization and culture. L construction co. ltd. is one of major construction companies that have been searching methodologies or technologies to manage various risk factors surrounding corporate marketing and project operation. This paper presents an unique approach to develop a model of risk management plan and system suitable to L construction itself focused on the construction phase.

  • PDF