• Title/Summary/Keyword: construction operation management

Search Result 1,053, Processing Time 0.027 seconds

Study on the Cost Savings and Maximize Marketing Effect to Efficiency of Enterprise Messaging Service (마케팅 효과 극대화 및 비용절감 효과성에 대한 기업용 메시징서비스 효율화 연구)

  • Jang, Mun-ik;Jeong, Jae-hun;Choi, Myeong-gil
    • Journal of Digital Convergence
    • /
    • v.14 no.10
    • /
    • pp.311-317
    • /
    • 2016
  • In a smart commerce market, customers are seeking customized shopping services optimized for personal tastes and customized shopping experiences based on customers' tastes. Accordingly, individually customized services are needed more than anytime now. According to this demand, companies provide messaging services to the consumer, but do not include a personalized service for each individual. The purpose of this study is to combine the techniques of personalized services with messaging services and presents system construction plan and integrated model system for corporate messaging services and thereby possible are maximizing marketing effects and analyzing effects of cost savings. Applying the operation of the integrated model is proposed and message transmission scheme through effective personalization can be applied to personalized model using the personalized information according to customers' requirements. The integrated model of personalization on this study is expected to be highly effective when combined with the search service.

The Effect of Working Time Reduction in Hospital Management (근로시간 단축에 따른 병원경영 영향 분석)

  • Cho, Woo-Hyun;Lee, Sun-Mi;Lee, Hak-Sun;Ku, Bon-Seog;Park, Chan-Kun;Kwon, Soon-Chang
    • Korea Journal of Hospital Management
    • /
    • v.9 no.1
    • /
    • pp.46-65
    • /
    • 2004
  • The study was designed to investigate what effect of working time reduction which will be gradually expanded to corporate size from June, 2004 could give to medical industries, and to provide basic information for hospitals and government to prepare the policy. 276 hospitals were surveyed about medical service income and manpower realities during the first half of 2003, using a structured survey tool. Response rate was 8% and 20 hospitals were finally analyzed. The effect of working time reduction in hospital management was different to the size of hospitals and the alternative. Income to existing service income was decreased by $2.2{\sim}4.6%$ in tertiary hospitals, by $3.2{\sim}5.7%$ in general hospitals with more than 300 beds, and by $3.7{\sim}6.0%$ in general hospitals with less than 300 beds. In preparation against such decrease in income, government is required to raise insurance payment, to calculate added service charge for day-off on Saturday forenoon, to retain emergency care payment, to expand emergency care facilities, to secure duty doctors, and to support middle and small sized hospitals. Hospitals are required to give self improving efforts such as fortifying of weekday care, development of weekend care program, strengthening of care capacity and function of emergency care center, and making manpower operation efficient.

  • PDF

Evaluation of the Importance of Risk Factors in Real Estate Development Projects and Their Risk Management (부동산 개발사업의 위험요인 중요도 평가 및 위험관리 방안)

  • Park, Jae-Yong;Park, Won-Seok
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.13 no.4
    • /
    • pp.681-696
    • /
    • 2010
  • This paper aims to evaluate the importance of risk factors at each stage of real estate development projects, and to propose risk management plans. For this purpose, possible risk factors at each stage of real estate development projects are extracted through previous studies, questionnaire survey by real estate experts is conducted next. And finally, the importance of risk factors at each stage evaluated using the AHP method. The results of this study are as follows. First, according to the results of evaluating the risk factors by main categories, planning risks in predevelopment stage, licensing risks in developing preparation stage, and cash flow risk in development stage are appreciated as most important risks. Second, according to the results by sub categories, changes in consumer preferences in pre-development stage, contracts and licensing-related work in developing preparation stage, bankruptcy of developers and construction companies in development stage, and compensation for any kinds of accidents in management and operation stage are appreciated as most important risks. Third, the major risk management plans at each stage based on the analysis results are suggested.

  • PDF

Development of Open Land Management Information System(LMIS) Middleware (개방형 토지관리정보체계 미들웨어 개발에 관한 연구)

  • 서창완;백재현;홍성학
    • Spatial Information Research
    • /
    • v.9 no.2
    • /
    • pp.353-368
    • /
    • 2001
  • Recently central and local governments developed a huge spatial database and system using full-scale Geographic Information System (GIS). But Inconsistent spatial data through duplicated database management drops off in efficiency and confidence of administration. It is difficult to share data because of their unique system and data type. Under these circumstances Ministry of Construction and Transportation (MOCT) has been carrying out Land Management Information System (LMIS) to computerize land administration and policy affairs and to implement land database such as law, spatial, attribute data. A prerequisite mission of LMIS is to develop open system for solving the problem of duplicated data management and data sharing and for supporting various computer environments such as hardware, software, network etc. The purpose of LMIS is to reuse the existing investment resources and to expand the existing system resources. Therefore the purpose of this study is to investigate a method of LMIS operation under the existing circumstances and expansion of the system in the future. To do this, Supporting various DBMS, GIS server, Distributing Computing Platform(Unix, NT Server) is needed. Especially LMIS need to be developed as open system with interoperability to get independence of application from various GIS servers.

  • PDF

A study on the Construction of the System Integration Management System for Civil Affairs (민원업무통합관리 시스템의 구축방안연구)

  • Yi, Sung-Ki;Rhew, Sung-Yul;Lee, Kyu-Won
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.8
    • /
    • pp.107-116
    • /
    • 2009
  • To establish efficient e-government and to improve the quality of public services, online public services are in operation in every administrative organization. However, due to the lack of analysis and connection between each government organization, the satisfaction of the civil users has not been improved very much. This research presents the core components of Integrated Management Model for Public Services, which can minimize the time for processing public services and the expenses for administrative procedure, based on the example of N Ministry. For this purpose, it analyzes current process of the public services to find out underlying problems, deduces requirements for improvement, presents and implements the design principles of Integrated Management System for Public Services. The efficiency of this Integrated Management System was proven with the analysis from the viewpoints of civil users, internal service representatives, and their managers.

Investigations of Vulnerable Members and Collapse Risk for System Support Based on Damage Scenarios (손상시나리오 기반 시스템 동바리 취약부재 도출 및 붕괴 위험성 분석)

  • Park, Sae In;Park, Ju-Hyun;An, Hyojoon;Lee, Jong-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.1
    • /
    • pp.33-40
    • /
    • 2021
  • In recent years, many construction projects become large and complicated, and construction accidents also steadily increase, which grows interest in the safety and maintenance during construction. Many of the construction accidents are related to temporary construction and structures, but the safety evaluation and management during construction are unclear and indefinite due to the short operating period and continuous change in the formation of the temporary structure. The system support, which is one of the temporary structures to support the pouring load of concrete, was proposed to easily install and dismantle members with connection parts pre-manufactured. The use of the system support is increasing to improve the safety of the temporary structure during construction. However, the system support, which consists of multiple members, still has uncertainties in connectivity between members and supports of vertical members. Therefore, this study analyzed the structure, load, and accident cases of the system support to define the damage scenarios for member connection, support condition, and lateral displacement. The decrease rate of the critical load was analyzed according to the damage scenarios based on the defined unit structure of the system support. In addition, this study provided vulnerable members for each damage scenario, which could induce instability of the temporary structures during design, construction, and operation of the structure.

A Study on the Construction for Optimal Network of Metro Transfer System in Yangsan Area (양산지역 도시철도 환승체계 최적노선망 구축에 관한 연구)

  • Choi, Yang Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1D
    • /
    • pp.27-36
    • /
    • 2010
  • Recently, the management of metro business in large cities has become more difficult because of increased construction and operation costs. The purpose of this paper presents the construction of transfer system to resolve about recent tendency to decrease of metro-users and diminution of use efficiency which are serious problems of Busan metro. To cope with this situation, it is necessary to examine the methods of obtaining returns on development profits of land value rises that occur due to transfer system construction between Busan metro line #1 and line #2 in Yangsan area. Therefore, it was made use of research on metro utilization to presuppose service improvement, as an alternative, in the transfer system construction between metro and metro which might be powerful influence over metro-users. In this research, it was examined the actual situation of rises in land values brought about by the transfer system construction of metro line #1 and line #2 in Yangsan area with application of four (4) methods, and have calculated a basis of the development profits produced by the transfer system construction of metro line. According to the economical efficiency analysis, the total construction cost amount to 4,827.1 billion won of case #1 based on single track, and evaluate economically as B/C to 1.013, NPV to 72.7 billion, IRR to 5.614 percent.

Development and Application of Performance Indicators to Estimate the Service Activities Relating with Water and Wastewater Works: Focus on Water Works Parts (상하수도 서비스 평가지표 개발 및 적용: 상수도 분야를 중심으로)

  • Choi, Tae-yong;Yoon, Yeo Cheon;Lee, Lan Jung;Kim, Duck-Jin;Jo, Jae Hong;Koo, Ja-yong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.20 no.3
    • /
    • pp.411-429
    • /
    • 2006
  • To improve Service quality for water and wastewater works, most water and wastewater utility effort to develop not only facility construction but also operation optimization. The operation is optimized by accurate estimation for ongoing situation. And from the accurate estimation, utility operator gain a information about their service quality and problems, So we developed a evaluation tool (Performance Indicators: PI) for service activity of water and wastewater works. The PI was developed in many countries and some international organizations (World Bank, IWA etc.) for service benchmarking. And ISO (international organization for standardization) just has been making a service standard for water and wastewater system (So called ISO/C224). This proceeding for making a service standard is ongoing now and will be launched in 2007. In our study, PI was composed of 6 parts (A human resource, facility management, operation, service quality, finance and environment). To evaluate water utilities, performance indicators for water was consisted of 100 items. Each 2 water utilities were estimated by this performance indicator. From the study, we just know that the performance indicator was a very useful tool to estimate utility service quality. And from the result, it is possible to know the strong and weak point of estimated utilities.

USN-based Real-Time Monitoring System for a Temporary Structure of Concrete Formwork (콘크리트 거푸집 가설구조물 공사 안전관리를 위한 USN 기반의 실시간 모니터링 시스템)

  • Moon, Sung-Woo;Yang, Byong Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.2D
    • /
    • pp.159-166
    • /
    • 2012
  • During concrete placement, the formwork structure supports the weight of concrete mass. The complexity of the operation can cause concentrated workloads, which in turn brings about a collapse of the temporary structure. As a countermeasure, the operation needs to be constantly monitored to maintain safety and prevent accidents. This paper presents a USN (Ubiquitous Sensor Network)-based safety monitoring system for formwork construction. The system takes advantage of ubiquitous technology in monitoring the behavior of the formwork structure such as deflection, load weight, and tilting. The collected data are sent to the host computer wirelessly for real time monitoring. The data can be then compared with the allowed limits on guidelines. The comparison can indicate whether the concrete placement operation is executed in a safe condition.

Simulation Experiment of PEMFC Using Insulation Vessel at Low Temperature Region (저온영역에서 단열용기를 이용한 연료전지 모의 실험)

  • Jo, In-Su;Kwon, Oh-Jung;Kim, Yu;Hyun, Deok-Su;Park, Chang-Kwon;Oh, Byeong-Soo
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.19 no.5
    • /
    • pp.403-409
    • /
    • 2008
  • Polymer electrolyte membrane fuel cell (PEMFC) is very interesting power source due to high power density, simple construction and operation at low temperature. But it has problems such as high cost, improvement of performance, effect of temperature and initial start at low temperature. These problems can be approached to be solved by using experiment and mathematical method which are general principles for analysis and optimization of control system for heat and hydrogen detecting management. In this paper, insulation vessel and control system for stable operation of fuel cell at low temperature were developed for experiment. The constant temperature capability and the heating time at sub-zero temperatures with insulation control system were studied by using a heating bar of 60W class. PEMFC stack which was made by 4 cells with $50\;mc^2$ active area in each cell is a thermal source. Times which take to reach constant temperature by the state of insulation vacuum were measured at variable environment temperatures. The test was performed at two conditions: heating mode and cooling mode. Constant temperature capability was better at lower environment temperature and vacuum pressure. The results of this experiment could be used as basis data about stable operation of fuel cell stack in low temperature zone.