• Title/Summary/Keyword: construction methods

Search Result 5,849, Processing Time 0.036 seconds

Development of CPAM(Construction Process Analysis Model) based on Lean Construction Principles (린 건설 원리에 기초한 건설 생산 공정 분석 모델에 관한 연구)

  • Kim Chan Hun;Kim Chang Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.48-61
    • /
    • 2001
  • This study aims at improving work reliability. It proposes a way to overcome the limitations of current scheduling methods by providing a new framework, CPAM(Construction Process Analysis Model) based on the lean principles. It suggests methods which improve work reliability and production effectiveness with variability control methods. Also it suggests methods which reduce inventories of materials and equipment and WIP(Work In Process) using two techniques; Lookahead Schedule and Weekly Work Plan. The contribution of this research also includes that it assumes planning as a process of reducing uncertainty and maximizing throughput, counter-posing plan reliability to resource redundancy as alternative strategies for managing in conditions of uncertain work flow.

  • PDF

A Comparative Analysis of Integrated Project Delivery in Construction Versus Traditional Methods

  • Peressini, Anthony;Bristow, James;Motahari, Mahmoud;Karakouzian, Moses
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.669-677
    • /
    • 2022
  • In this paper, different types of traditional project delivery methods in the construction industry were explored and a comparative analysis against Integrated Project Delivery (IPD) were performed. The advantages of IPD method for all parties, owner/engineer/architect/general contractor, were explored by reviewing the most recent literature. The literature suggests that IPD method should be the dominating project delivery method and diluting the conventional methods such as Design-Bid-Build due to more collaborative and mutually beneficial ways of doing construction; IPD is newer and a more comprehensive method to capture the intrinsic values of project collaboration. This paper presents a comparison of the commonly used methods of project delivery, Design-bid-build, CMAR, & Design-Build and addresses their advantages and disadvantages in differing project scopes and sizes. Several industry leaders with experience in the four types of project delivery addressed were surveyed. The survey results show an overwhelming desire for future projects to go toward IPD from the contractor/owner/RDP. The biggest obstacle facing a project from using IPD appears to be trust.

  • PDF

Main Problems and Suggestions on Occupational Safety and Hygiene in Construction Sites (건설현장의 안전보건 주요 현안과 개선 방안)

  • Shim, Gyubeom
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.22 no.4
    • /
    • pp.329-336
    • /
    • 2012
  • Objectives: The aim of this study is to analyze main problems on occupational safety and hygiene in construction sites and to suggest some improvement methods. In order to decrease industrial accidents, I emphasize the approach paradigm shifts according to characteristics of construction workers. Methods: Pointing out the irrationality of current institutions by comparing bad outcomes of occupational safety and hygiene in construction industry and characteristics of construction workers. Results: In order to decrease industrial accidents, we need some approach paradigm shifts; the supply method of industrial safety and health fundamentals on the construction industry level, the accident rate calculation by using the actual construction workforce instead of an estimation, institutionalizing the prevention efforts themselves for industrial accidents, securing enough production costs for the precondition of occupational safety and hygiene in construction sites. Conclusions: I ascertain the need of the approach paradigm shifts for decreasing industrial accidents in the construction industry.

THE DEVELOPMENT OF A CURTAIN WALL INSTALLATION ROBOT THROUGH THE ANALYSIS OF EXISTING CONSTRUCTION PROCESSES

  • Seung-Nam Yu ;Chong-Ho Choi ;Seung-Yel Lee;Chang-Soo Han
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.520-526
    • /
    • 2005
  • Automation in construction has been restricted to special classes of tasks. Curtain walls can be handled like standard construction materials; they are heavy but breakable, and are large but require precise installation. These characteristics make the installation of curtain walls ideal for robotic automation. There are two methods for developing construction robots: The first is approving the robot performance and applying it to the current construction methods. The second is admitting the limitation of the current robot technology and trying to optimize the current method of construction to apply the robot system. In this study, we derived the performance requirements of a curtain wall-installation robot. We also tested this robot at a real construction site and evaluated its performance. Finally, the results were analyzed, and we proposed additional research.

  • PDF

A Study on the Design & Construction Method of Traditional Landscape Space through the 『Imwongyeongjeji』 「Seomyongji」 and the 'Standard Specification for Repairing Cultural Heritages' (『임원경제지』 「섬용지」와 문화재수리 표준시방서를 통해 본 전통조경공간 설계 시공방법)

  • Lee, Jung-Han
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.37 no.4
    • /
    • pp.1-10
    • /
    • 2019
  • The purpose of this study is to examine the design & construction methods of the traditional landscape space of the past and the repair and maintenance of cultural heritages to maintain it today. To this end, the method of narrative description, process extraction and construction related to traditional landscaping were compared to each other based on the 『Imwongyeongjeji』 「Seomyongji」 and 'Standard Specification for Repairing Cultural Heritages'. The results are as follows; First, to analyze at the description methods of the 『Imwongyeongjeji』 「Seomyongji」 and 'Standard Specification for Repairing Cultural Heritages' and related processes in the field of traditional landscaping. 『Imwongyeongjeji』 「Seomyongji」 was an encyclopedia of the overall construction method of the living space, describing the location, effect, and advantages and disadvantages of each component and presenting quantitative figures to institutionalize the construction of traditional landscaping spaces. 'Standard Specification for Repairing Cultural Heritages' presented the entire process of repairing cultural heritages, and it is becoming a kind of guide for reference at the site. Among them, foundation construction, roof construction, landscape construction, and fence construction were drawn as items that could be applied to traditional landscaping areas. Second, the traditional landscape space construction method was divided into the processes of foundation construction, roof construction, landscaping construction, and fence construction. Foundation construction is a way of repeating the process of land-tramping. During the construction of the roof, the tile-roofed building was built on top of the rafters and roofed with tiles. And thatched roof was made to a number of rice straws bundles to cover the roof one after the other. Instead of tiles, the stone roof was made of thin and wide stones, and the wooden boards were used for the single roof and the bark roof were constructed with many layers of dried corrugations. Landscape construction mainly consists of the Paving technique through tramping rubble and the construction of terraced flower by planting stone, plants, and shrubs on the top. According to the building materials, the wall construction was derived from the earth-stacked earthen wall, stone walls using stone and clay, marble walls made of tile patterns, and the construction of a board wall using a wood board as a wall. Third, comparing the construction methods of the 『Imwongyeongjeji』 「Seomyongji」 and 'Standard Specification for Repairing Cultural Heritages', 『Imwongyeongjeji』 「Seomyongji」 focuses on standardizing the construction methods to create a new traditional space. There is a difference in the setting of the scope of the 『Imwongyeongjeji』 「Seomyongji」 and the construction because 'Standard Specification for Repairing Cultural Heritages' provides the overall construction procedure considering the diversity of the cultural heritages. In addition, the traditional landscape space used to be a residential space in the past, but today, the maintenance process of the already established facilities as designated cultural heritages has been carried out, and construction methods have been added to create viewing conditions. In terms of the succession of traditional knowledge, some similar methods were found in the repair of cultural assets today, and some cases were also confirmed in the reconstruction of traditional technologies such as application of some materials or mix, separation of added facilities and introduction of efficient construction methods.

Radio environment maps: The survey of construction methods

  • Pesko, Marko;Javornik, Tomaz;Kosir, Andrej;Stular, Mitja;Mohorcic, Mihael
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.8 no.11
    • /
    • pp.3789-3809
    • /
    • 2014
  • Radio environment maps (REMs) and geolocation database represent an important source of information for the operation of cognitive radio networks, replacing or complementing spectrum sensing information. This paper provides a survey of methods for constructing the radio frequency layer of radio environment map (RF-REM) using distributed measurements of the signal levels at a given frequency in space and time. The signal level measurements can be obtained from fixed or mobile devices capable of sensing radio environment and sending this information to the REM. The signal measurements are complemented with information already stored in different REM content layers. The combined information is applied for estimation of the RF-REM layer. The RF-REM construction methods are compared, and their advantages and disadvantages with respect to the spatial distribution of signal measurements and computational complexity is given. This survey also indicates possible directions of further research in indirect RF-REM construction methods. It emphasizes that accurate RF-REM construction methods should in the best case support operation with random and clustered signal measurements, their operation should not be affected by measurements outliers, and it must estimate signal levels comparably on all RF-REM locations with moderate computational effort.

Case Study of Ground Disturbance Characteristic due to Drilling Machine in Adjacent Deep Excavation (근접 깊은 굴착에서 천공장비에 의한 지반교란 특성 사례 연구)

  • 김성욱;한병원
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.77-84
    • /
    • 2003
  • Deep excavations in the urban areas have been frequently going on in large scale. Soil-nailing and Earth-anchor supporting methods are generally used in deep excavation. These construction methods cause ground disturbances during drilling process, and damages of adjacent structures and ground due to the differential settlement throughout construction period, and unexpected behaviors of supporting system according to the characteristics of drilling machine and ground condition. This article introduces two actual examples of adjacent deep excavation for the construction of university buildings in granitic Seoul area. The important results of construction and measurements obtained using Crawler drilling machine for Soil-nailing and Earth-anchor supporting methods are summarized. And some suggestions are given to improve and develop the technique of design and construction in the deep excavation projects having similar ground condition and supporting method.

  • PDF

The Impact of Design-Bid-Build Procurement Methods on Project Performance in Libya

  • Ghadamsi, Alaeddin;Braimah, Nuhu
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.2
    • /
    • pp.16-23
    • /
    • 2016
  • The use of inappropriate procurement methods to deliver construction projects has long been acknowledged as a major source of poor project performance and is particularly problematic for the Libyan Construction Industry. Poor procurement method selection has been recognised as a major contributory factor to frequent time and cost overruns. This paper offers a way of selecting specific procurement methods to maximize successful project performance. The methodology involves an intensive review of relevant literature, followed by a semi-structured questionnaire survey. The key findings of the study reveal that 11 out of its 12 common selection criteria exhibit a significant contribution to one or more project performance criteria (time, cost and quality). Project clients should therefore prioritise these criteria when selecting a design-bid-build method. Knowledge of the criteria that contribute positively to project performance will also enable clients to work out, prior to and during construction, the best measures and provisions for successful project outcomes.

Analysis of Cases Using Top-Down Construction Method Under Various Site Condition (현장 조건에 따른 Top-Down 공법 사례분석에 관한 연구)

  • Shin, Hyun-Jung;Shin, Kyoo-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.197-199
    • /
    • 2011
  • To utilize the Top-Down construction method, it is required to analyse building area, floors, and soil conditions to choose the three basic elements of retaining wall, base column, and floor structure. The purpose of this research is to compare the methods of Top-Down with other construction methods. The research method is to analyse the project conditions of Top-Down project cases. The aim is to develop a method of selecting alternatives, considering construction characteristics, work schedule, supporting methods, foundation types.

  • PDF

Comparison on the Application of Various Productivity Analysis Methods for a Curtain wall Operation in High-rise Building Construction (초고층 커튼월 공사의 생산성 분석 기법에 대한 적용성 비교)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.211-212
    • /
    • 2011
  • The construction industry has become larger and higher in size. The process of high-rise building construction is complicated and has various conditions affecting productivity. Analysing productivity in high-rise buildings is difficult despite the various productivity analysis methods. In this study, data was collected from actual construction site to analyse the productivity of curtain wall operation by means of Work sampling and Method Productivity Delay Model. As a result, this paper suggests advantages and disadvantages deducted from comparing the two productivity analysis methods.

  • PDF