• 제목/요약/키워드: construction methodology

검색결과 1,385건 처리시간 0.031초

CALS/EC 체계에 따른 건설도면 정보교환 표준(STEP)의 적용 및 활성화 방안에 관한 연구 (A Study on the methodology of applying and activating the Construction Drawing Information Exchange Standard(STEP) by CALS/EC)

  • 김인한;최중식
    • 한국전자거래학회지
    • /
    • 제7권2호
    • /
    • pp.39-53
    • /
    • 2002
  • In the Korean domestic construction field, there are a lot of problems related to construction information exchange and sharing owing to the absence of construction drawing information exchange standard. To remedy the aforementioned inefficiency effectively, it is necessary to apply the STEP standard which is known as an international standard for achieving the establishment of Construction CALS. This study focus on suggesting a methodology to activate the STEP based construction drawing information exchange standard to the current construction drawing information exchanging and sharing practice. In this paper, the domestic and foreign standardization projects related to the construction drawing information have been investigated and analyzed. In addition, a methodology of applying and activating the STEP standard has been suggested. Finally, a verification and certification methodology for applying the CALS/EC construction drawing information exchange standard(STEP) have been suggested.

  • PDF

지방부 국도에서의 보도설치 우선순위 결정을 위한 방법론 개발 (일반국도 적용사례 중심으로) (Methodology for Prioritizing Sidewalk Construction among 100 Candidate Sites on Rural National Highways)

  • 전우훈;양충헌;윤정은;양인철
    • 한국도로학회논문집
    • /
    • 제17권4호
    • /
    • pp.127-133
    • /
    • 2015
  • PURPOSES: The purpose of this study is to develop a methodology to prioritize sidewalk construction on rural national highways. METHODS : In order to determine an appropriate prioritization for sidewalk construction, we developed a specific methodology. The proposed methodology includes three main steps: 1) Analytic Hierarchy Process (AHP) methods, 2) Subjective evaluation of relevant road agencies for the candidate sidewalks along rural national highways, and 3) Field study conduction. Each step has four phases. The primary feature of this methodology is the addition of expert consultation and survey data, as well as a field study. In addition, the method could guarantee flexibility in selection for evaluation criteria. As a result, the proposed methodology could be used as a general procedure for application to other roadway classifications when considering sidewalk construction. RESULTS: In order to demonstrate the reasonableness of the proposed methodology, a case study was performed for exactly 100 candidate sites for sidewalk construction on rural national highways. All required evaluation scores were properly produced for each candidate site. By doing so, decision-makers can determine the priority for sidewalk construction at these sites by reviewing quantitatively and qualitatively considered data. CONCLUSIONS: The results of the case study can be applied to a long-term fundamental plan for sidewalk construction on rural national highways. Furthermore, this methodology could be employed to prioritize a small-scale SOC project(e. g. bicycle or pedestrian roads).

지리정보 데이터베이스 구축공정 관리방법론 연구 (Study on Process Management Methodology of Geographic Information Database Construction)

  • 최병길;김성수
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2003년도 추계학술발표회 논문집
    • /
    • pp.257-262
    • /
    • 2003
  • This study is aimed to research the management methodology for the process of GIS database construction. In general, used methodologies are made for the purpose of application program development. And the methodologies reflected GIS characteristics are also applied for GIS software development. But the software methodologies are never introduced to construction of GIS database. In this study, various common methodologies are investigated and analyzed, and the methodology which include the characteristic of GIS database construction process as work steps and detail paths is developed and suggested.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

INFLUENCE FACTOR-BASED RISK ASSESSMENT METHODOLOGY FOR CONSTRUCITON

  • Hyunsoo Kim;Hyunsoo Lee;Moonseo Park;Kwang-pyo Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1231-1236
    • /
    • 2009
  • Many work-related risk factors can cause construction site hazards. Therefore, safety management begins with measuring the magnitude of risk involved in a project. This study proposes a methodology for risk assessment of major trades at a particular construction site. To assess risk, this methodology integrates hazard severity and frequency, and their magnitude is calculated based on actual work-site hazards. This methodology also considers the influence factors that affect the frequency of work-related hazards. To select the appropriate influence factors, a two step approach is deployed. First, the predominant factors are identified through a literature review. Second, a selective process filters out the influence factors that are difficult to analyze quantitatively, and these extracted factors are weighted using expert surveys. Finally, the factors are combined and a quantitative risk assessment methodology is proposed.

  • PDF

해외 플랜트 공사 리스크 평가 방안 및 적용에 관한 연구 (A Study on the Risk Assessment Methodology and Application for International Plants Construction)

  • 안성훈;이영남;조호규
    • 한국건설관리학회논문집
    • /
    • 제9권1호
    • /
    • pp.134-142
    • /
    • 2008
  • 해외 플랜트 건설시장은 지속적으로 증가하고 있으며, 국내 건설업체의 중동 플랜트 건설시장의 비중도 점점 증가하고 있다. 하지만 해외 플랜트 건설사업은 상대적으로 높은 리스크를 가지고 있으므로 해외 플랜트 건설과 관련된 리스크를 사전에 예측, 평가하여 관리하는 것이 중요하다. 따라서 본 연구에서는 기존의 해외 공사 리스크 평가 방법과 현재 해외 플랜트 공사에 참여하고 있는 전문가들의 면담조사를 토대로 해외 플랜트 건설공사의 사업 수행 과정에서 발생할 수 있는 리스크를 입찰 및 계약 단계에서 사전에 평가할 수 있는 리스크 평가 방안을 제시하였다. 또한 중동지역의 실제 프로젝트 리스크 평가 사례를 통해서 해외 플랜트 프로젝트 리스크 평가에 대한 활용성을 검토하였다.

온실가스 규제에 대비한 건설장비 이산화탄소 배출량정보 활용방법론 개발 (Methodology Developments based on CO2 Emission Information from Construction Equipment for Greenhouse Gas Regulations)

  • 고지은;이진우;채윤병;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.35-36
    • /
    • 2018
  • According to the nation's greenhouse gas emission statistics, greenhouse gas emissions have been stiffly increasing. Accordingly, the importance of CO2 reduction is more getting focused over the world. This trend makes the construction equipment be considered as a major target of reduction due to the large volume of emission. This study suggests the feasible methodology for estimating CO2 emission from construction equipment and for being easily applied on the job sites. The methodology is based on the collection from the segmented CO2 emission information of construction equipment. This study allows site personnels to estimate the total amount of CO2 and to take appropriate actions for reasching the environmental regulations.

  • PDF

베이시안 접근법을 이용한 생산성 관리 방안 제시 (Productivity management methodology development using Bayesian Approach)

  • 고용호;이태희;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.21-22
    • /
    • 2013
  • Construction industry has become higher, larger and more complicated. Construction projects demand precise planning and management prior and during actual operation. However, it has been analyzed that the process planning in the construction site has been made by the site engineer experience mostly that usually results in unreliable results. Numerous studies in this field have been conducted trying to solve such problems developing methodologies to suggest quantitative results. It has been analyzed that many studies have focused on limited data only and neglected suggesting an appropriate methodology for changing data applications. Therefore, this study suggests a methodology that effectively manages construction productivity by applying bayesian approach focusing on the high-rise curtain wall operations.

  • PDF

웹기반의 경량전철 유지보수 정보화시스템 개발방법론에 대한 연구 (A Study on the methodology for Web-based Maintenance System Development of Light Rail Transit)

  • 이호용;한석윤;조홍식;조봉관
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.722-729
    • /
    • 2007
  • The methodology for maintenance system development should overall be considered with all of task characteristic, schedule, and the technical condition of investment sources. This research applies Waterfall model to methodology for the development and construction of maintenance system through customizing the CD (Custom Development) procedure of "HSDM (Hyundai System Development Methodology)" based on information engineering. The waterfall model called as classic life cycle paradigm is defined for the sequent development procedure, which make progress a next step after that a previous step is admitted with thorough review. This model which is popular and the oldest paradigm is used for system development by four steps; demands analysis, design, construction, and maintenance. This methodology advances higher abstract step from higher lower step using top-down approach from concept definition to construction, which notices the end of a step whenever a step is over. Therefore, each step is exactly divided, and consequently the output is clearly yielded.

  • PDF

CO2 EMISSION MEASURING METHODOLOGY DEVELOPMENT FOR ACCURACY IMPROVEMENT OF CO2 EMISSION OF CONSTRUCTION EQUIPMENT

  • Won-Suk Jang;Sun-Chan Bae;Sang-Dae Park;Suk-Hyun Kwon;Byung-Soo Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.204-208
    • /
    • 2013
  • CO2 emission makes up more than 80% of whole green gas. Therefore CO2 is recognized as the main culprit of global warming. IPCC (Intergovernmental Panel on Climate Change) is advising the 3 methods measuring CO2 emission. TIER1 is measured CO2 emission by criteria the energy consumption, TIER2 measure by criteria the emission factor according to the emission control technique each kind of vehicle, TIER3 is measured by criteria the distance each kind of vehicle. Currently, the most of CO2 emission measurement is used by TIER1. But it is not standardized that CO2 emission measurement method have the factor as work condition each distance. Specially, it is not suggest that methodology has the condition changing load of equipment according to site condition and the same position work as construction equipment. So, this study is suggested the CO2 emission measurement methodology of construction equipment.

  • PDF