• 제목/요약/키워드: construction management technology

검색결과 2,820건 처리시간 0.033초

Competitiveness Benchmarking of Overseas Construction through a SWOT analysis of leading construction firms in Spain and France

  • Han, Jae-Goo;Park, Hwan-Pyo;Jang, Hyoun-Seung
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.721-722
    • /
    • 2015
  • The aim of this research is to provide a direction to benchmark advanced construction companies from Spain and France by deriving business strategies through SWOT analysis in order to strengthen overseas expansion and competitiveness of domestic construction companies.

  • PDF

건설현장 안전관리를 위한 스마트건설 기술에 관한 연구 (A Study on the Smart Construction Technology for Safety Management in Construction Sites)

  • 정인수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.297-298
    • /
    • 2021
  • The construction industry is a representative high levels of hazardous work environment, and the number of disasters in the construction industry is the highest compared to other industries. Information & Communication Technology(ICT) convergence technologies are being introduced worldwide, and this study considers ICT-based safety management cases at domestic and foreign, resulting in a list of technologies to recognize and resolve to construction site hazards. Technologies such as 「Development of hazard map considering cause, age, proficiency, type and timing of accident in construction industry」, 「Development of hazard map-based accident prediction platform using AI」, 「Development of smart safety management plan for whole construction work cycle」, 「Development of intelligent safety devices and smart safety equipment for mitigating hazard factors」 were derived as smart construction technologies that could solve this problem.

  • PDF

A FUNDAMENTAL STUDY TO DEVELOP STANDARD TECHNOLOGY CRITERIA FOR IT-CONSTRUCTION FUSION TECHNOLOGIES, TO BE APPLIED TO A U-CITY

  • Kyoon-Tai Kim;Jae-Goo Han;Chang-Han Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1352-1358
    • /
    • 2009
  • As the demand for a convergence between construction technologies and IT is on the rise, as seen in the visualization of U-City construction, studies on the ways in which IT in should be utilized in the building and construction field have been continuously and actively performed. However, there has been almost no development of standardized technology criteria relating to the life cycle of a building (planning, design, construction, and maintenance). That is, there are almost no examples of efforts made to combine construction technology and IT in a fundamental way, considering the environment, the facility, its spatial characteristics, engineering, materials, and structure, aspects that are commonly required not only for interior spaces but also for exterior construction of U-City. Despite the fact that a state-of-the-art infrastructure has been built, and the competency of users with the cutting-edge technology, composite studies on technologies, facilities, services and spaces are still lacking, and basic research on the composite operation method including compatibility and linkage between facilities and services within a U-City has been insufficient as well. It is generally known that by fusing IT with construction technologies, the total period of construction taken can be reduced and construction expenses can be curtailed, while construction quality can be improved. For this reason, it is vital to prepare a standardized base to connect cutting-edge IT with the construction technologies. In preparing such a base, the most urgent issue is to develop standardized technology criteria. The ultimate objective of this research is to establish the technological criteria system required to apply construction-IT fused technologies to U-Cities, and to develop the technological criteria for the design, construction and maintenance of the U-Cities. This paper, whose objective is to establish development strategies for construction-IT fused technologies by way of analyzing the criteria for conventional construction projects, the necessity of criteria for construction-IT fused technologies, and the current status of U-Cities' development, is the underlying research for this purpose. The strategies established are expected to be utilized in establishing the system of criteria for construction-IT fused technologies, and to contribute to a knowledge base in the construction-IT field. In addition, based on the strategies established, criteria for construction-IT fused technologies, such as design criteria and construction standards, will be developed, and by applying these criteria and standards, the ultimate objectives of U-Cities, which are the enhancement of urban competitiveness and the satisfaction of residents, will be attained

  • PDF

전문 안전 순찰 관리시스템(SPMS)의 도입에 따른 건설 현장의 재해 및 사고 발생 저감 영향 분석 (Effect of the Application of Safety Patrol Management System(SPMS) upon the Reduction of Disaster & Accident Occurrences in Construction Site)

  • 윤여찬;정광섭;김영일;김경호
    • 대한안전경영과학회지
    • /
    • 제16권2호
    • /
    • pp.53-61
    • /
    • 2014
  • The disaster and safety accidents in any construction site occur inevitably. Since the on-site disaster and accident occurrence became one of major concerning factors in construction site, architects & building executers have been flooded with safety management advices. The purpose of this paper is to survey and analyze the effect of the application of Safety Patrol Management System(SPMS) upon the reduction of disaster & accident occurrences in construction site. In order to estimate and reduce the disaster and accident ratio in construction site, various surveyed data has been analysed. It will establish the suitable design standards and suggest the basic database for estimating disaster and accident ratio.

RELIABILITY TEST OF RFID TECHNOLOGY IN TOOL TRACKING

  • Julian Kang;Jae-Heon Nam
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.820-823
    • /
    • 2005
  • RFID technology offers the possibility that tools and valuable supplies tagged with RFID devices could be tacked down automatically. Such automated tool tracking has the potential to reduce theft, identify underutilized tools to be relocated, insure that crafts have access to the appropriate tools as needed, and reduce overhead labor cost of managing tools. Although other industries have been busy to enhance their supply chain management using RFID technology, construction professionals may be wondering whether it works reliably in construction jobsites as well. This paper presents a field test conducted to determine the reliability of RFID technology in identifying tools in the field storage box. The test indicated that RFID technology is reliable in inventorying tools in field storage.

  • PDF

Task-Technology Fit in Construction Scheduling

  • Yang, Juneseok;Arditi, David
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.117-121
    • /
    • 2015
  • Construction managers use scheduling methods to improve the outcome of their project. Despite the many obvious advantages of the critical path method (CPM), its use in construction has been limited. Understanding the reasons why CPM is not used as extensively as expected could improve its level of acceptance in the construction industry. The link between construction scheduling methods and the tasks expected to be performed by schedulers has been an on-going concern in the construction industry. This study proposes a task-technology fit model to understand why CPM is not used as extensively as expected in construction scheduling. A task-technology fit model that aims to measure the extent to which a construction scheduling method functionally matches the tasks expected to be performed by the scheduling staff. The model that is proposed is an answer to the lack of proper instruments for evaluating the extent to which scheduling methods are used in the industry.

  • PDF

Staffing-Technology Fit in Construction Scheduling

  • Yang, Juneseok;Arditi, David
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.631-635
    • /
    • 2015
  • Construction managers use scheduling methods to improve the outcome of their project. In spite of the many obvious advantages of the critical path method (CPM), its use in construction has been limited. Understanding the reasons why CPM is not used as extensively as expected could improve its level of acceptance in the construction industry. The link between construction scheduling methods and the capabilities of the scheduling staff has been an on-going concern in the construction industry. This study proposes a staffing-technology fit model to understand why CPM is not used as extensively as expected in construction scheduling. A staffing-technology fit model that aims to measure the extent to which a construction scheduling method matches the staff's experience, know-how and capabilities. The model that is proposed is an answer to the lack of proper instruments for evaluating the extent to which scheduling methods are used in the industry.

  • PDF

건설기술용역 실적 관리 프로세스 시스템 개발에 대한 연구 (A Research on the Development of Management Process System of Public Ordering Service Results and Estimation)

  • 이규성;이한규;김남곤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.168-169
    • /
    • 2014
  • Construction Technology Service is currently hardly managed due to failure to offer standard management system of service performance, company performance, and business evaluation in every Ordering Agencies. After Construction Technology Promotion Act is enforced in May 2014, Ordering Agency obligates them to report to Minister of Land and Transportation within 10 days upon contract/ amendment/ completion. In 2013, in advance to enforcement of this law, performance management system for construction technology service was developed for a test run. However this system only applies to main contractors while management and operation of subcontractors are unavailable that causes problems on connection and integration with Experience Management Trustee. Therefore, this research will establish systematic foundation that enables real-time information of service performance and evaluation of subcontractors to result standardization of performance and evaluation for public ordered services.

  • PDF

IT기술을 이용한 건설 정보관리 효율화 방안 (Construction Information Management Using Information Technology)

  • 하용호;유승훈;윤학중;이세준;김영석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.513-518
    • /
    • 2001
  • 국내 건설프로젝트는 점차 대형화·복잡화 되어가고 있으며, 과거에 비해 더욱 방대한 양의 건설정보가 생성되어 공사관리에 이용되고 있는 추세이다. 그러나, 기존의 건설프로젝트 관리체계 하에서는 현장에서 발생되는 정보를 수집·관리함에 있어 대부분 이를 기술자들의 경험과 수작업에 의존하고 있으며, 결국 이로 인한 현장 정보의 신뢰도 결여는 건설정보의 재 입력을 통한 공사관리 업무의 비효율성을 초래하고 있는 실정이다. 최근 건설을 포함한 다양한 산업분야에 걸쳐 컴퓨터를 기반으로 IT기술을 응용하는 제반 연구가 활발히 진행되고 있으며, 다양한 가시적인 성과를 이루어 내고 있다. 따라서, 본 연구에서는 건설현장에서 발생하는 정보의 수집 및 활용에 대한 문제점을 규명하고 건설정보 관리와 관련한 연구동향과 적용사례를 살펴본 후, 건설정보 수집 도구로써의 IT 기술 및 적용 분야를 분석하여 국내 현장 관리체계에 적합한 IT 기술 도입 방안을 제시하고자 한다. 또한 본 연구의 결과는 향후 국내 건설산업에 있어 효율적 공사관리 및 실적자료의 구축을 위한 기반 환경을 제공할 수 있을 것으로 사료된다.

  • PDF