The 6th International Conference on Construction Engineering and Project Management
/
pp.698-699
/
2015
For last three years, our research team have conducted the project named "Development of construction project management technology based on BIM/GIS platform. "We developed construction cost estimation system as well as 3D modeling engine at the first two year and established a web-system which could estimate the benefits of the project and further analyze the economic and financial feasibility of the project. This paper mainly focused on the functions and specifications of web-system. The system was composed of two modules: economic feasibility estimation module and financial feasibility estimation module. While the economic feasibility estimation module determines economic feasibility of the project based on traffic demand forecasting from the public's perspective, the financial feasibility estimation module determine financial viability of the project using toll fee of the road from private entity's perspective. Compared with traditional feasibility study, the proposed system provide users with better flexibility which can make users easily to validate the project upon the change of project environments. The system was also verified with an already accomplished project. The verification showed that proposed system could provide satisfactory accurate results with reduced time and resources.
The purpose of this study is to reduce the accident rate by introducing a safety system for small construction sites belonging to local governments. In the case of a small construction site, permission is granted through the building permission department and the construction management of the building safety management of 1,000 square meters of floor area less than 3 stories is not properly performed in the Enforcement Decree of the Building Act of Korea. In the current state of industrial accidents in 2016, 81.8% of all accident victims are found to be vulnerable to accident such as those occurring at work places with less than 50 employees. Considering the fact that the construction work with less than 5 billion KRW of the construction cost in Korea generates the most deaths, it is time to introduce the safety and health system of local governments.
Hyeon-Yong Park;Tai-Kyoung Kang;Yoo-Sub Lee;Hun-Hee Cho;U-Yeol Park;Hyun-Oak Jung;Kyo-Sun Lee
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.1370-1376
/
2009
Reinforcing steel works should be carefully controlled by the construction manager considering the severe fluctuation of the price of reinforcing steel bars and for the safety of structure in building constructions. In particular, preparing rebar placing drawings needs more effort and time than before because of the emergence of higher and more complicated buildings. Moreover, the experience of field engineers or foremen (fabricators or detailers) in preparing placing drawings gives rise to the differences in fabricated bar type and quantity of bars used. To address these problems, this study proposed the support system in preparing placing drawings for reinforcing steel works efficiency. In the near future, if this system can be made available on the web, multiple end-users will be able to share the result; the efficiency of rebar supply chain management will also be improved.
This paper shows construction management focused on waste management in construction project in planning stage Construction waste is given a great deal of weight on total waste. And it is issued in government policy. But it show the limit of problem.As a result of having referenced idea as describe above, this paper will be studied by this process. First, present condition of development waste, cases is researched in construction projects. Second, problems of development pattern and management system are investigated and checked in project cases. Third, maintenance and management method project are proposed by application of planning Stage.
The 2th International Conference on Construction Engineering and Project Management
/
pp.440-449
/
2007
This paper describes the efforts in developing several versions of bridge management system (BMS) in Taiwan. There were several versions of stand-alone BMS developed in Taiwan prior to the Ji-Ji earthquake that occurred in year 1999. Since many bridges were seriously damaged by this earthquake, the Ministry of Transportation and Communication determined to develop a nationwide BMS to have a better by control on the status of bridge maintenance. Implemented in year 2000, the Taiwan Bridge Management system (T-BMS) is now the dominating and mandatory system used by all the government agencies that are responsible for bridge maintenance. Having more then 25,000 bridges in its inventory, T-BMS has thousands of logins per month to update data in the relevant database. The experiences and difficulties of using such a nationwide bridge management system are discussed. Finally, future plans for BMS development are also proposed in this paper.
Hak-Ju Lee;Yoonseok Shin;Wi Sung Yoo;Hunhee Cho;Kyung-In Kang
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.1081-1087
/
2009
An automatic construction system in Korea is now at the stage of the full automation like in Japan, and an actual pilot project is going to be built in 2009. However, in developing a new construction system that has never been implemented before, there is a need to assess the performance and to consider the uncertainty of the system. The program evaluation and review technique (PERT) allows dealing with this uncertainty. Thus, this paper implements an analysis of the process of steel fabrication and makes suggestions for time-related problems arising from the analysis. The time required for steel erection by the automatic system was compared with that in the traditional method. In the result, finding out another construction process and improving robot performance were proposed to resolve the problems. The results will contribute to promoting the development of an efficient system for the new automatic construction system.
The objective of this study was to conduct research and analysis using Group Focus Interview to survey the between construction site workers and managers implementing for the Severe Accident Punishment Act. Focused on measures to improve safety management effectiveness for the effectiveness of establishing a safety management system. A plan to improve the efficient safety management system was presented to 50 construction industrial managers and workers. In order to ensure the industrial accident prevention policies appropriately, it is necessary to be aware of safety obligations for workers as well as business operators. In addition, despite the existence of a commentary on the Serious Accident Punishment Act, confusion in the field still persists, so in the event of a major accidents, the obligation to take safety and health education is strengthened, and effective case education is proposed by teaching actual accident cases suitable for actual working sites. It is necessary to make all training mandatory, and it is necessary to reconsider awareness through writing a daily safety log, awareness of risk factors, etc., and writing down risk information. Above all, at the construction ordering stage, it is necessary to keep the construction safety, request corrections and supplements for problems issues that arise, and consult between the orderer and the construction company about the problems issues. Rather than having only the construction company correct or supplement the safety management plan, the contents should be shared with supervisors and workers to establish a more practical solution. Results of this study will contribute to improving the effectiveness of the serious accident and construction safety management system.
국내에서는 건설공사지원정보체계의 활용을 촉진하고, 건설공사의 제반 단계에서 발생하는 정보의 상호교류를 촉진하기 위하여 통합건설정보 분류체계를 제안하고 있으나 효율적인 활용방안에 대한 연구의 미흡과 건설공사의 중요한 정보인 설계도서의 체계적인 통합관리를 위한 데이터베이스 (Database : DB) 중심의 전산관리시스템의 구축미비로 인하여 많은 문제점을 야기하고 있다. 이에 본 연구에서는 건설정보 분류체계의 활용과 설계도서의 체계적인 통합관리를 위한 방안으로 데이터베이스 설계하고 이를 웹(Web)기반에서 관리할 수 있는 설계도서 통합관리 시스템을 구축 하였다.
본 연구에서는 건설 관리자의 전자적 의사결정 지원을 위한 활용도구인 건설 데이터 웨어하우스의 시스템 프로토타입 개발에 대한 기초연구를 수행하였다. 건설 데이터 웨어하우스는 건설회사 내에서 별도 저장된 데이터에 접근하여 관리의 차원, 각 주제영역, 그리고 기술모듈별로 분석함으로써 전자적 정보를 제공하는 기술인 바, 이 기술의 건설산업 활용을 위하여 본 연구에서는 데이터 웨어하우스 기술의 기술적 특성을 검토하여 요소기술모듈과 사용주체에 대한 설정을 통한 건설 데이터 웨어하우스 시스템 프로토타입을 도출한다. 이러한 연구의 결과로서, 건설데이터 웨어하우스 시스템 프로토타입과 각 기술 모듈을 제시하고 이의 활용성을 사례연구를 통하여 검증함으로써 데이터 웨어하우스 기술의 건설산업 활용가능성을 확인하였다.
The 6th International Conference on Construction Engineering and Project Management
/
pp.440-444
/
2015
As domestic construction investment has been gradually reduced, expanding overseas construction is one of the most important issues for Korean construction companies. Among these issues, strategies for overseas CM services have widely been discussed, because the CM services have features of high growth potential and value-added area when compared with other construction sectors. Therefore, recent efforts focus on further development in advanced CM capabilities and expansion to overseas market. However, there has been lack of quantitative research to investigate current status and future direction of CM industry. In this sense, this research investigated what CM has achieved for the past 17years (between 1997 and 2013) and what CM should accomplish for future strategies. The purpose of this research is to statistically analyze total of 2,983 CM service contracts over the past 17 years published in KISCON (Knowledge Information System of Construction Industry) in order to examine current status of CM industry in terms of market type, contract size, commodity type, and owner's type. Based on this research, it is expected to suggest for future strategies and development directions from the CM industry perspective that could provide quantitative analyses, improve current CM statistics systems and strengthen the competitiveness in international CM market.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.