• 제목/요약/키워드: construction management system

Search Result 4,745, Processing Time 0.037 seconds

The Present Status and Vision of Virtual Construction System Development (가상 건설 시스템 개발 현황과 비전)

  • Kim, Jae-Jun;Choi, Cul-Ho;Shin, Hyun-Mok;Jin, Sang-Yoon;Lee, Kwang-Myung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.170-175
    • /
    • 2008
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF

A Presentation of a Cost Classification System for Gas Plant Construction Projects

  • Park, Moonsun;Kim, Yongsu
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.625-626
    • /
    • 2015
  • The purpose of this study is to present a cost classification system that can be used in gas plant construction projects. Towards this end, it examined the detailed statements of the construction companies which had experience in carrying out plant construction projects. Based on the above, it also presented a life-cycle (i.e., EPCC) cost classification system for the gas plant construction projects by conducting the Delphi analysis through the expert opinions.

  • PDF

Existing Building Approval Submission Process Improvement Effect Analysis thru Utilization of BIM

  • Yeo, Chang-Jae;Yu, Jung-ho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.664-664
    • /
    • 2015
  • Advanced countries have mandated applying BIM in construction projects. Also, Public Procurement Service has planned to mandate applying BIM to all construction project that ordered in PPS from 2016 in KOREA. However, now Seumter that is building administration system is not supported BIM based construction license BIM information from Seumter. Thus, despite the applicant is preparing a BIM model, they do not take advantage of BIM information in Seumter. In previous studies. We developed a BIM based building approval submission system. In this study, we verified the system that developed in previous research. As a result, requirement information input time reduction in Seumter system showed high satisfaction. But there was as low usability because building approval submission system cannot support some information for building approval in seumter. If the system will do utilization and management with the building approval system, the applicant can be using BIM base design document information and saving the time that takes at building approval submission. Study about the system improvement is required for application to building approval system.

  • PDF

Establishment of a Safety Inspection System for Public Institutions Ordered Construction Projects (건설공사 발주 공공기관의 안전점검 체계구축에 관한 연구)

  • Eung Ho Park;Sudong Lee;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.3
    • /
    • pp.55-62
    • /
    • 2023
  • Public institutions have a responsibility to ensure the safety of their employees and the public. One way to do this is to implement a systematic safety inspection system based on risk assessments and continuous improvements. This study developed a systematic safety inspection system for public institutions that are ordered construction projects. The proposed system in this study consists of a three-step process: (1) developing safety grade evaluation tables, (2) preparing and conducting safety inspections, and (3) evaluating and improving safety management grades. The first step is to develop safety grade evaluation tables by analysis and diagnosis of the construction site's work type, disaster statistics, and related laws. The second step is to conduct safety inspections using the developed evaluation tables. The third step is to determine the safety management grade based on the results of the safety inspection, and to improve risk factors found during the safety evaluation. The proposed system was implemented in highway construction projects carried out by public institutions. The results showed that the proposed system has two major effects: (1) reducing accident-related deaths and injuries, (2) improving safety management levels by continuous evaluation and improvement. The proposed system can be utilized in construction projects ordered by public institutions to improve the level of occupational safety and health.

Lifting Load Recording and Management Method of the Lift for Construction Based Sensing Information

  • Taekyu Ko;Joonghwan Shin;Kyuhyup Lee;Soonwook Kwon;Chung-Suk Cho;Suwan Chung;Goeun ,Choi
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.125-135
    • /
    • 2022
  • While buildings in recent days become taller and larger, many problems occur during the management of construction. Particularly, as the vertical movement of manpower and materials during construction has become longer while the lifting frequency and load increase, the need for a good lifting management practice is also increasing. Therefore, this study presents a real-time lifting performance monitoring system that can store and manage lifting records for construction management. Through review of literature and preceding studies related to construction lift, the concept of lift planning and operation management was understood, leading to the development of a system to monitor lifting operation and performance information. This system enabled quick measurement of the lifting performance during construction phase while responding to changes in the project schedule. To verify this system, a case study was conducted in which the current status and characteristics of the sensing-based lifting performance were derived.

Construction Information Process Using Digital Pen -Focused on Defect management System- (디지털 펜 입력 시스템을 활용한 건설 정보 처리에 관한 연구 -하자관리 시스템을 중심으로-)

  • Park, Gyu-Tae;Jung, Young-Chul;Nam, Hyun-Jung;Son, Bong-Ki;Kim, Tae-Hui;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.135-138
    • /
    • 2010
  • In the construction industry, construction management system using information technology has been applied diversely to increase productivity. Although IT device such as PDA, RFID, Barcode, wireless network and web camera has been introduced in construction site, the usage of these device is restricted, because these cause engineer to do additional work. The suggested process using Digital Pen in this study, which can lessen engineer's additional work, get defect data promptly. Also accumulated data is utilized effectively for analyzing construction site. The purpose of this study is to introduce Digital Pen System as a means of construction data acquisition for improving productivity.

  • PDF

Development and Application of TACT Management System (TACT 공정관리 시스템 개발 및 적용 사례)

  • Suh Sang-Wook;Kim Jae-Ho;Kim Sun-Kuk;Kim Chang-Duk;Lee Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.145-154
    • /
    • 2003
  • The change in environment of construction industry and the advancement of information technology require the improvement of construction project efficiency. However, construction industry still lacks performance-measuring tools that are the requirements of efficient project management system. In case of the schedule management system, schedule is usually being managed by result-oriented measurements such as completion time, spent cost, and progress rate, which are not good enough to control the overall continuity of work-flow. This research aimed to systemize the overall construction process and to develop the indicators for measuring performance of TACT activities during finishing work period that can contribute to the systemization of TACT management.

Development and Application of TACT Management System (TACT 공정관리 시스템 개발 및 적용 사례)

  • Kim Jea-Ho;Suh Sang-Wook;Kim Sun-Kuk;Kim Chang-Duk;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.126-134
    • /
    • 2003
  • The change in environment of construction industry and the advancement of information technology require the improvement of construction project efficiency. However, construction industry still lacks performance-measuring tools that are the requirements of efficient project management system. In case of the schedule management system, schedule is usually being managed by result-oriented measurements such as completion time, spent cost, and progress rate, which are not good enough to control the overall continuity of work-flow. This research aimed to systemize the overall construction process and to develop the indicators for measuring performance of TACT activities during finishing work period that can contribute to the systemization of TACT management.

  • PDF

A Scheme for discriminating Construction IETM from existing systems (건설분야 전자매뉴얼(IETM) 특성화 방안)

  • Jeong, Jin-Wook;Park, Moon-Seo;Lee, Hyun-Su;Ji, Se-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.698-701
    • /
    • 2008
  • IETM(Interactive Electronic Technical Manual) has been introduced to construction industry recently, It is regarded as a useful tool for handling the data, procedures of the construction, but it can be similar to existing If-based systems, the PMIS (Project Management Information System) and the KMS(Knowledge Management System), without characterizing. This research is intended to investigate ITEM's basic concept, and to present the scheme discriminating Construction IETM from existing systems.

  • PDF

Barriers of Last Planner System: A Survey in Vietnam Construction Industry

  • Khanh, Ha Duy;Kim, Soo Yong
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.4
    • /
    • pp.5-11
    • /
    • 2013
  • Construction industry is overwhelmed by delay and often has suffered cost and time overrun. In this context, Last Planner System (LPS) has been considered as a very useful tool for the management of the construction process. Many previous studies have reported its effectiveness in construction performance. This study aims to evaluate the level of importance of the Last Planner processes in the Vietnam construction industry (VCI), and analyze the existing barriers when implementing these processes in construction management. These barriers were collected based on previous studies from International Group for Lean Construction (IGLC). A survey was carried out through questionnaire. The respondents are been experienced people in construction project management. There are four processes of LPS that were investigated including master schedule, phase schedule, lookahead plan, and weekly work plan. The results showed that master schedule is the most important item when performing a construction project in the VCI. The highest degree of agreement belongs to 'owner - contractor' pair with 77.1% importance indices; whereas the lowest belongs to 'consultants - contractors' pair with 63.8% importance indices. Eventually, three barrier factors were extracted from factor analysis technique with 62.2% of variance explained.