• 제목/요약/키워드: construction management system

검색결과 4,727건 처리시간 0.032초

현장관리 업무체계의 실태조사 연구 - 준공 후 업무를 중심으로 - (A Field Study on the Preference in the Construction Management - Focused after construction Stage -)

  • 이두진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문발표회
    • /
    • pp.85-89
    • /
    • 2003
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF

SYSTEM ARCHITECTURE FOR INTEGRATION OF CONSTRUCTION E-BUSINESS SOLUTIONS: A MODEL FOR ENTERPRISE RESOURCE PLANNING AND PROJECT MANAGEMENT SYSTEM

  • Boong-yeol Ryoo;Irtishad U. Ahmad;Juan Zheng
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.497-502
    • /
    • 2005
  • Needs of automation and computerization in the construction industry has been recognized but the implementation of e-business solutions with project management systems has not been fully explored. In order to cope with different management practices in home office and project sites, integration of two popular systems, Enterprise Resource Planning (ERP) and Project Management System (PMS) is essential. The objective of this study is to find ways to functionally and systematically integrate ERP and PMS. With the integration of ERP and PMS, a project will be managed much more efficiently and effectively. It is expected that this study will benefit system integrators and help them to understand construction management processes and integrate the solutions with minimized programming work.

  • PDF

QR코드를 활용한 품질경영시스템에 관한 연구 (A Study of Construction Quality Management System using QR code)

  • 박상민;임태경;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.137-139
    • /
    • 2012
  • This paper presents a system architecture and database of construction quality management system which encourages real time information tracking and monitoring. It improves the real time quality record tracking by using QR code technology in the project delivery. The advantages and issues relative to QR code and the database structures of the tracking system are presented. Conventional project scheduling system, operation modeling and analysis system, and quality management system are hybridized using QR code technology. The system improves project quality management by tracking the atomic tasks which consists of a construction process at the lowest level of construction hierarchy. It analyzes the quality records to determine the causes of abnormality and/or nonconformity. Using QR code technology, the construction quality management system may be more effective than the conventional one. It was confirmed that the quality management processes in construction project delivery can be more visible and controllable by integrating QR code technology, project scheduling system, and quality management system.

  • PDF

건설산업의 지식관이체계 로드맵 (Road Map of a Knowledge Management System for the Construction Industry)

  • 정인수;김승균;최원식
    • 한국전자거래학회지
    • /
    • 제6권1호
    • /
    • pp.101-121
    • /
    • 2001
  • MOCT(Ministry of Construction St Transportation) suggested "A Plan for Implementation of Knowledge-based Economy for the Construction Industry" to add high value to a construction industry. by means of knowledge-based management. However, there is no knowledge management system which considers characteristics of a domestic construction industry. So a useful knowledge vanished the moment a company terminated a construction Uoject. Therefore, it is necessary to develop "An application method of a knowledge management system for the construction industry" which takes a real environment into consideration. This study aims to present the road map of a knowledge management system which helps the bodies of the construction industry(government, research center/university, enterprise, etc) to do a knowledge activity efficiently. To accomplish this objective, we analyzed overall knowledge management activities. In addition we suggested an implementation direction and strategy of a knowledge management system for the construction industry. As results of this study, we presented the road map of a knowledge management system for the construction industry, which is composed of policy forum, study forum, professional forum, research forum and knowledge 8t information DB. We expect that results of this study will be used as a basis for implementing the knowledge portal that brings a construction industry to a high value added industry.

  • PDF

건설감리실무 지원을 위한 정보관리시스템 구축에 관한연구 (A Study on the Management Information System for Supporting the Supervision of Construction Workplace)

  • 노대원;정병훈
    • 한국건축시공학회지
    • /
    • 제3권2호
    • /
    • pp.85-93
    • /
    • 2003
  • The purpose of this study was to construct the management information system for supporting the supervision of construction workplace. For the purpose, firstly, this study surveyed the present states and the problems of construction workplace in Korea. And then, defined the range and the process of the supervision of construction workplace, and examined the information standards of construction and the CALS standards for supporting. As a result, this study proposed the first stage of management information system, which consists of several basic functions, such as, document management, system management and partially, duality management and construction information management.

공공부문의 건설공사 안전관리 개선방향에 관한 연구 (A Study on the Improvement of Safety Management of Public Sector in the Construction Industries)

  • 신동혁;이명구;윤영근;오태근
    • 한국안전학회지
    • /
    • 제34권5호
    • /
    • pp.78-86
    • /
    • 2019
  • Various safety measures have been established and implemented in order to reduce construction accidents. However, statistics data on at construction sites still show higher accident and mortality rates than other industries. As a result of investigating the causes of accidents occurring in the construction industry, most accidents resulted from the failure of the system. Therefore, the existing safety management system of the construction site is monitored so that it operates properly in the field, and it is an important factor to actively participate in construction work. In order to overcome this, the government emphasized on-site inspections and planning and implementation confirmation by public institutes to ensure the effectiveness of the safety management system through amendment of the Construction Technology Promotion Act, but the orderer' safety capability and manpower are insufficient at present. Therefore, in this study, the safety management system, such as design for safety, safety management plan, safety check, safety management cost, etc. specified in the Construction Technology Promotion Act, is regularly checked and confirmed to improve the effectiveness of the safety management system as well as to improve the safety management system of the construction site by deriving measures to strengthen the public function of the government.

OSC(Off-Site Construction)기반 PC공법의 시공 프로세스 도출 (Derivation of the Construction Process for Precast Concrete System based on Off-Site Construction)

  • 전영훈;배병윤;윤원건
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.289-290
    • /
    • 2021
  • The PC system has advantages in terms of project management, such as shortening the construction period and reducing costs. However, it is difficult to activate the technology due to insufficient application of the technology. Therefore, there is a need for a strategy to expand and activate the PC system. This study is a basic research for PC construction project management, and its purpose is to derive the entire construction process from factory production of PC components to on-site construction. In this study, the construction process of the PC system was derived through literature review, and the main matters for the construction process management of PC system were confirmed in the analysis process. In the future, the results of this study are expected to be used as basic data for research for PC project management, such as deriving construction classification and calculating construction periods.

  • PDF

A MODEL OF RISK MANAGEMENT PLAN AND SYSTEM FOR THE CONSTRUCTION PHASE

  • Seon-Gyoo Kim;Chan-Jeong Park ;Moon-Serk Yang;Jin-Bong Kim ;Hyung-John Shin
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.341-346
    • /
    • 2005
  • After the IMF shock, some major construction companies in Korea have been motivated to avoid and mitigate various risk factors which could be critical and catastrophic events to corporate revenue and organization internally or externally. It means that they are trying to introduce and set up a risk management plan and system suitable to their organization and culture. L construction co. ltd. is one of major construction companies that have been searching methodologies or technologies to manage various risk factors surrounding corporate marketing and project operation. This paper presents an unique approach to develop a model of risk management plan and system suitable to L construction itself focused on the construction phase.

  • PDF

Development of A Computerized Risk Management System for International EPCS Projects

  • Yoo, Wi Sung;Kim, Woo-young;Sung, Yookyung
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.614-615
    • /
    • 2015
  • In these days, global construction market is speedily increasing and domestic construction companies have a chance of new contracts. In the meantime, international projects have been increasingly forced to cope with potential risks, which seriously impacted achieving the targeted time and cost. In this study, we introduce a computerized risk management system for international EPCS projects, which is constructed on the needs of practitioners and decision makers as an aid to proactively control the potential risks and to monitor continuously their status and variation. The system is called the Project Risk Management System (PRiMS) is useful for furnishing project managers with warning signals as a project is progressing and helpful for producing the total risk score and tracking risk variation.

  • PDF

건설공사 철근정보관리 개선방안에 관한 연구 (A Study on the Integrated Management System for Rebar Information in Building Construction)

  • 박우열
    • 한국건축시공학회지
    • /
    • 제5권4호
    • /
    • pp.99-106
    • /
    • 2005
  • With labor shortage and high-wage, the construction cost is rising and the construction-business is dull, demanding the construction environment of Korea to raise profitability through major cost savings and rationalization of construction management. Therefore, in this study, to improve many problems found in calculating rebar quantity for capital expenditure programming which is considered the beginning stage of rebar work. and to improve problems such as no grasping of rebar loss due to lack of systematic management in order/purchase stage and construction management stage, a rebar information-management-system was found and preyed. The relation database was designed for the rebar information management system by analyzing work process of a rebar manufacturing plant, as the rebar information that is necessary in a rebar manufacturing plant if similar to that of a purchasing department of general construction company. The Proposed rebar information management system was implemented in two large rebar production plants. The implementation of the proposed system showed that the system increased work efficiency, reduced the management manpower, and improved the project-integrated management