A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.

  • PDF

Supply-Demand Forecasting of Principal Engineers in Construction Industry Using System Dynamics (시스템 다이내믹스를 활용한 건설 특급기술자 수급전망)

  • Kim, Sung-Tae;Lee, Hyun-Soo;An, Sun-Ju;Ryu, Han-Guk;Park, Moon-Seo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.161-172
    • /
    • 2007
  • By prosperous condition of construction economy in the early 90s in Korea, the government needed a lot of the qualified professional engineers (PE) to manage the construction site. In order to meet the high demand of P.E., Government has established the admitted engineer systems(AES) in 1995 that give the authority of principal engineers to the admitted engineers who do not take the written examination but have equivalent working experience. Since 2000, professional $engineer^{\circ}{\phi}s$ shortage has been resolved. however, the opposite situation, which is serious over-supply of construction engineers has occurred. Thus, Government announced that would abolish the admitted engineer systems as recognized the existent admitted engineers(about 1,000,000 persons) from 2007. However, Professional Engineers Institution has strongly insisted that Government should not recognize existent admitted engineers. From this point of view, it is critical to make the supply-demand forecast systems as a derivative approach of System Dynamics also, that is useful in comparing the argument between Government and Professional Engineers Institution. This paper describes about principal $engineer^{\circ}{\phi}s$ supply change by admitted engineer system abrogation and suggests the idea to regulate the supply and demand with the improvement of the regal system.

Spatiotemporal Visualization of Unit Price Data of Highway Projects

  • Jain, Deepanshi;Shrestha, K. Joseph;Jeong, H. David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.77-81
    • /
    • 2015
  • The unit price contracting is the standard contracting method for highway projects in the U.S. As a result, state highway agencies have collected a large amount of historical bid data that they can use to determine engineer's estimates for future projects. The estimator must carefully consider various characteristics of a new project such as its location to determine an engineer's estimate as accurate as possible before bid letting. Higher cost estimates can result in the loss of the available budget and lower cost estimates may lead to deferral and delay of projects. The study uses the historical bid data obtained from Iowa Department of Transportation and develops a Geographic Information System (GIS) tool to visually show the variation of unit prices over the map using a spatial interpolation technique. The interpolation map can be used to estimate the unit price of the item at any location across Iowa. This noble method allows the estimator to effectively and fully utilize the historical bid data in a very time efficient manner and determine more accurate cost estimation.

  • PDF

CSFs Extraction and AHP Importance Analysis for Construction Technology Services Evaluation in terms of Construction Manager (건설사업관리자(CMr) 측면에서 건설기술용역 평가의 CSFs 추출 및 AHP 중요도 분석)

  • Yang, Jin-Kook;Hong, Seong-Wook
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.129-134
    • /
    • 2020
  • The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.