• Title/Summary/Keyword: construction joint

Search Result 1,121, Processing Time 0.024 seconds

A Study on Risk Factor Analysis of Construction Scaffold Installation (건설비계 설치작업의 위험요인 분석에 관한 연구)

  • Kim, Kyong-Hoon;Boo, Yoon-Seob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.189-190
    • /
    • 2019
  • Designers and builders are omitting structural design and relying on workers' experience, due to the lack of awareness of the importance of scaffolding in domestic construction sites, and there is a high probability of collapsing accidents such as inappropriate wall joint installation and non-compliance with work procedures. Therefore, risk factors were analyzed in detail and major risk factors were derived from opinions of site managers and scaffolding experts in this study.

  • PDF

Overview of Seismic Design for Vertical Construction Joints of Slurry Walls Used as Permanent Basement Walls (영구벽체로 사용하는 지하연속벽 수직시공이음부의 내진설계 개요)

  • Lee, Jeong-Young;Kim, Seung-Weon;Kim, Doo-Kie
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.393-394
    • /
    • 2023
  • This paper provides an overview of seismic design considerations for vertical construction joints of a slurry walls used as a permanent basement walls.

  • PDF

Force-Displacement Relationship Diagram for Shear Connections in Vertical Construction Joints of Slurry Walls (지하연속벽 수직시공이음부의 전단접합부에 대한 힘-변위 상관도)

  • Lee, Jeong-Young;Kim, Seung-Weon;Kim, Doo-Kie
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.397-398
    • /
    • 2023
  • To design the shear connections for vertical construction joints of slurry walls, it is necessary to create a force-displacement curve that represents the structural performance of the shear connections. This paper proposes a method for preparing the force-displacement curve of the shear connections including major considerations.

  • PDF

Integral Bridge Using H-pile (H-말뚝을 이용한 일체식교대 교량)

  • 정경자;김성환;유성근
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.241-248
    • /
    • 1999
  • The existing bridge with deck joint has many problems during construction and maintenance. To overcome these difficulties, an integral bridge, which is defined as the practice of constructing bridges without deck joints, is proposed in this study. A test bridge with 3 spans of PC beam was selected to verify the function of the bridge and is under construction. Characteristics of integral bridge are followings: $\circled1$ Flexible H-piles under the abutment are installed to accommodate thermal movements of the superstructures of bridge. $\circled2$ PC beam of the superstructure and the abutment are integrated. $\circled3$ The existing approach and relief slabs are applied to minimize the stress transfer occurred from the bridge deck to the pavement. $\circled4$ A cyclic control joint is installed between approach and relief slabs to absorb the thermal movement. $\circled5$ It is used a dual direction bearing which is cheaper than single direction bearing and has a good workability as well. It is also installed a shear block on the top of pier coping to protect the lateral movement caused by temperature change and earthquake.

  • PDF

The Effect of the ZLR and Tied Sleeper to Reduce the Track Irregularity in the Bridge Expansion Joint Zone (교량신축부에서의 궤도틀림 저감을 위한 활동체결구 및 침목결속 효과)

  • Kang, Tae-Ku;Min, Kyung-Ju;Lim, Nam-Hyoung
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2405-2408
    • /
    • 2011
  • In recent time, the cause analysis and the reduction of the track irregularity have become the most important issue in the ballasted track on the high-speed railway bridge. This is because that the frequency of the maintenance work at the bridge expansion joint zone is on the rise. The track irregularity on the railway bridge starts at the end of the bridge-deck and spreads along the bridge. Due to the dynamic vibration and the thermal expansion of the bridge, the compaction of the ballast gravel on the bridge expansion joint zone become loose and then the progress of the track irregularity result from the train-induced dynamic impact is accelerating further. Among the several options for reducing the track irregularity on the bridge expansion joint zone, the application and efficiency of the zero longitudinal restraint(ZLR) and tied sleeper are investigated in this paper. Field test construction has been conducted, then the progress of the track irregularity and the frequency of the maintenance work are analyzed before and after the filed test construction. Of the two methods, it is shown that the installation of the ZLR seems to be better than the tied sleeper.

  • PDF

Experimental study on through-beam connection system for concrete filled steel tube column-RC beam

  • Tian, Chunyu;Xiao, Congzhen;Chen, Tao;Fu, Xueyi
    • Steel and Composite Structures
    • /
    • v.16 no.2
    • /
    • pp.187-201
    • /
    • 2014
  • A new through-beam connection system for a concrete filled steel tube column to RC beam is proposed. In this connection, there are openings on the steel tube while the reinforced concrete beams are continuous in the joint zone. The moment and shear force at the beam ends can be transferred to column by continuous rebar and concrete. The weakening of the axial load and shear bearing capacity due to the opening of the steel tube can be compensated by strengthening steel tube at joint zone. Using this connection, construction of the joint can be made more convenient since welding and hole drilling in situ can be avoided. Axial compression and reversed cyclic loading tests on specimens were carried out to evaluate performance of the new beam-column connection. Load-deflection performance, typical failure modes, stress and strain distributions, and the energy dissipation capacity were obtained. The experimental results showed that the new connection have good bearing capacity, superior ductility and energy dissipation capacity by effectively strengthen the steel tube at joint zone. According to the test and analysis results, some suggestions were proposed to design method of this new connection.

Engineering Geological Analysis for the Quarry Located at the Construction Site of the New Susan Harbor (부산 신항만 건설현장의 채석장에 대한 지질공학적 고찰)

  • 최정찬
    • The Journal of Engineering Geology
    • /
    • v.13 no.3
    • /
    • pp.359-368
    • /
    • 2003
  • A quarry is operated for filling-up the New Busan Harbor which is under construction, but actual rock quality is something different from the primary design. Therefore, object of this study is to classify whole rock quality for the quarry through site investigation and laboratory analyses because unexpected large amount of wasted rock is produced. For this object, various analyses were performed such as surveying, Schimidt Hammer test. joint spacing investigation and laboratory analyses using DIPS & RockWorks programs for evaluating joint sets and sizes of rock fragments after blasting. As a result, it is expected that large amount of wasted rock under ${\Phi}100mm$ is produced after blasting because of high joint density.

A Study on the Joint Performance Change of Self-Admixed Waterproofing Sheet by Induced Bonding of Asphalt Compound (아스팔트 컴파운드 간 접합을 유도한 자착식 방수 시트의 시트 간 접합부 성능 변화 연구)

  • Kim, Dong-Bum;Kim, Sun-Do;Park, Jin-Sang;Ko, Sam Seog;Kim, Byoung-Il;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.234-235
    • /
    • 2017
  • The bonding of the asphalt-based waterproof sheet is carried out in such a manner that the sheet and the sheet are adhered together and the lower adhesive layer of one sheet is adhered to the upper film layer of the other sheet, and the asphalt layer and the PE or HDPE film layer are bonded. When the joints are formed in the form of junctions between heterogeneous materials and exposed to the concrete joint movements and other deteriorating factors, the integrity of the joints can deteriorate and problems such as lifting and peeling off of the joints can occur. Therefore, this study was carried out to prevent unstable joint adhesion of the asphalt compound and film layer and to prevent defects in the adhesion between self - adhesive waterproof sheets. The self-adhesive waterproof sheet of this study can maximize bond stability by inducing bond between asphalt compounds during sheet-to-sheet bonding, thereby improving bonding strength.

  • PDF

An Experimental Study on Behavior of Field Splice Joints of Longitudinal Rib in Orthotropic Steel Decks (강상판 종리브 현장연결부의 실험적 거동 특성)

  • Choi, Dong Ho;Choi, Hang Yong
    • Journal of Korean Society of Steel Construction
    • /
    • v.13 no.6
    • /
    • pp.621-629
    • /
    • 2001
  • This study consists of static and fatigue tests to evaluate the behavior on the field splice joint of longitudinal rib in orthotropic steel deck specimens. Specifically, static and influence surface tests are performed for the stress distribution at the scallop area and high-strength bolt connection of longitudinal rib to examine the existence of handhole cover plate and the effect of eccentric loads. The ultimate strength of the field splice joint of longitudinal rib is obtained. In fatigue tests, cracks are observed at the scallop in the lower level test and the catastrophic failure of longitudinal rib is occurred following the failure of handhole cover plate in the higher level test. This study gives a basis for the better understanding of the field splice joint of longitudinal rib.

  • PDF

Research on Separation Behavior Joint of Develop and Application in Sheet-Membrane Composite Waterproofing (시트-도막을 이용한 분리거동형 복합방수공법 개발 및 적용에 관한 연구)

  • Heo, Neung-Hoe;Kim, Dong-Bum;Oh, Je-Gon;Go, Gun-Woong;Go, Jang-Ryeol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.165-166
    • /
    • 2014
  • The Composite waterproofing began to rise gradually 2000s in domestic. However, the sheet-membrane composite waterproofing method also acts as an abutment vulnerability that was a problem in a single method, and had the problem of damage to the formation of leakage paths. The existing non-overlap method, through vigorous research abutting sheet shall or could be developed to improve the seal performance of this method with the I-type joint coating material. Nevertheless, it has an integral top coat paint membrane and a sheet abutment limitation, damage to the upper membrane is damaged junction coating membranes has been generated. In this study, a method that has a layer of insulation on the joint bond breaker concept development, and to determine the physical properties with insulated joints to determine the breaking off of the upper joint is damaged coating membrane and tensile performance.

  • PDF