• 제목/요약/키워드: construction insurance

검색결과 153건 처리시간 0.02초

연관 규칙 탐색 기법을 이용한 건설공사 비사망 재해의 특성 요인 분석 (Analysis of Characteristic Factors for Non-fatal Accidents in Construction Projects using Association Rule Mining)

  • 이가연;신성우
    • 한국안전학회지
    • /
    • 제37권6호
    • /
    • pp.40-49
    • /
    • 2022
  • Simple statistical frequency based analysis, such as Pareto analysis, are widely used in conventional accident analysis. However, due to the dynamic and complex nature of construction works, many factors can simultaneously affect or involve the occurrence of accidents in construction projects. Therefore, the identification of the complex relationship between such factors is important to establish relevant and effective safety management policies and/or programs. In this study, characteristic factors and their relationships' contribution to non-fatal accidents in construction projects are analyzed using the association rule mining (ARM) technique. To this end, a total of 59,202 construction accident data are collected from 2015 to 2019 and the ARM is performed to retrieve specific relationships -named as association rules-among classified factors in the data. Characteristics of the retrieved relationships are analyzed and compared with the results of conventional Pareto analysis. Based on the results, it is found that both fall and trip are notable accident forms having characteristic relations with other factors for non-fatal accidents in construction projects. It is also found that small-scale construction, age of 50s, less than 1 month of working period, and architectural construction are important factors for non-fatal accidents in construction projects.

Dynamic Modeling of Building Services Projects: A Simulation Model for Real-Life Hospital Project

  • Abhishek, V.;Jagadeesh, P.
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권3호
    • /
    • pp.35-41
    • /
    • 2013
  • All infrastructure projects are said to be inter-dependent, uncertain and labour-intensive in nature. There is no exception for building services sub sector. For a real time project such as 'The construction, extension and refurbishment of Employees' State Insurance Corporation (ESIC) Hospital at Tirupathy, India with total area of 45,000 square feet at an estimated cost of 1100 million rupees, a generic process model is developed to simulate the effect of set of identified variables on construction project. The 'Stocks and Flows' of dynamic model affords relevant insights to project managers, who apply this knowledge when designing better performance through more appropriate project planning. It is concluded from the model-based approach that building services works can be improved through specific better focussed managerial efforts, such as an increasing coordination effectiveness at the planning stage, clarifying prerequisite conditions prior to installations. Otherwise, pending works arising from work clashes can lead to knock-on effects resulting in productivity constraints and pressures, as well as more rework and demolition. Current study reveals that the model enables deep insight into various interdependent processes, their by improving construction performance levels, by addressing the dynamics of design errors and defective works, and recovering delayed schedule.

건설공사보험 사례를 활용한 건설현장 인명사고 정량화 모델 개발 기초연구 (A Basic Study on Quantification Model Development of Human Accidents based on the Insurance Claim Payout of Construction Site)

  • 하선근;김태희;김지명;장준호;손기영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 추계 학술논문 발표대회
    • /
    • pp.195-196
    • /
    • 2017
  • The number of human accidents in the construction industry is increasing every year, and it constitute the highest percentage among industry. This means that activities performed to prevent safety accidents in the country are not efficient to reduce the rate of accidents in the construction industry. In order to solve this issue, research has been conducted from various perspectives. But, research regarding to quantification model of human accidents is insufficient. the objective of this study is to conduct a basic study on quantification model development of human accidents. To achieve the objective, first, Cause of accident is defined the through literature review. Second, a basic statistic analysis is conducted to determine the characteristics of the accident causes. Third, the analysis is conducted after dividing into four categories : accumulate rate, season, total construction cost, and location. In the future, this study can be used as a reference for developing the safety management checklist for safety management in construction site and development of prediction models of human accident.

  • PDF

해상적하보험에 있어서 손해방지의무의 문제점에 관한 고찰 (The Duty to Avert or Minimise a Loss in Marine Cargo Insurance)

  • 이시환
    • 무역상무연구
    • /
    • 제26권
    • /
    • pp.173-199
    • /
    • 2005
  • The MIA 1906, s.78(4) provides that it is the duty of the assured and his agents, in all cases, to take such measures as may be reasonable for the purpose of averting or minimising a loss. In many cases the statutory duty will be unimportant, since rights, duties and liabilities declared by the Act or implied into marine insurance contracts by law may be modified by agreement, and many contracts contains a sue and labour clause which effectively reproduces and/or to modifies the statutory duty. The effect of such contractual provisions will, of course, be a matter of construction, though modern sue and labour clauses tend to reflect the principles contains in section 78. However, it must not be assumed that the terms of all contractual sue and labour clauses are, or will remain, identical, either with each other or with the statutory duty. The purpose of this study is to clarify the ambit of sue and labour.

  • PDF

효율적 치과 PACS 수가신청을 위한 업무 프로세스 개선 (Work process improvement for effective request of Denta PACS fee)

  • 정영태
    • 대한디지털의료영상학회논문지
    • /
    • 제17권1호
    • /
    • pp.1-7
    • /
    • 2015
  • Recently, dental PACS construction in dental hospital is fairly general. For this reason, inspection request works of dental PACS fee with Health Insurance Review & Assessment Service are more important for the financial stability in hospital and from now on status. But several departments in dental hospital, enforce a incoherent order system so inspection request situation is full of mistakes and omissions. As a result, financial stability in hospital rapidly change for the worse, as the case stands establishment of proper order system and match system is essential to resolve the issue. Consequently, we plan to establish the proposed idealized scheme.

  • PDF

모빌 디바이스의 무선데이터통신을 활용한 엑스트라넷 구축연구 (A Study on construction of extranet using wireless data communication of mobile device)

  • 유우식
    • 산업경영시스템학회지
    • /
    • 제22권51호
    • /
    • pp.139-149
    • /
    • 1999
  • Developed in this paper is a prototype extranet using mobile device such as Personal Digital Assistance(PDA) or Handheld PC(HPC). Especially an adjustment transaction system for auto insurance using wireless data communications is described. Using infrastructures such as PCS, Cellular, Private Radio, wireless communications offers tremendous applications in Korea. A survey of such applications is presented in this paper. Also an analysis of currently available infrastructures of wireless communications is described in this paper. The scheme of an adjustment transaction consists of seven steps: (1) get list of adjustment, (2) obtain insurance information, (3) check police record, (4) get an accident record, (5) get bluebook value, (6) examine the car, (7) file report. Comparing with the previous on-line method that spends much time on gathering data, the proposed system guarantees more rapid transaction using wireless communications.

  • PDF

A Relationship of Managing Impacts of FOREX Fluctuations and Organizational Capabilities in Construction Business

  • Mohamed, Mohd Amizan Bin;Teo, Melissa;Kajewski, Stephen;Trigunarsyah, Bambang
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.477-480
    • /
    • 2015
  • Construction projects are high-risk activities. When undertaking such projects in an international setting, it can be complicated by foreign exchange (FOREX) fluctuation risk. This affects the construction business performance in various ways, namely its progress due to delays, which in turn create further problems, specifically cost overruns as a result of price increase in raw materials, disputes, arbitration, litigation and even, total abandonment. Thus, the effective management of FOREX fluctuations is crucial. Previous studies have focused on the need for contract safeguards, adequate insurance, careful planning and management, as well as foreign exchange futures hedging to address some of the risks triggered by FOREX fluctuations. An analysis of FOREX fluctuations in the international construction industry revealed that more often it was focused on project-specific issues. Currently, there is a relative lack of awareness on Organizational Capabilities (OC), the abilities that owned by the organization, which is essential in managing the impact of FOREX fluctuations. Where research has focused on OC, these are viewed in isolation. Therefore, this study attempts to close the gap by proposing a framework on managing the impact of FOREX fluctuations in the international construction industry, employing the OC perspective.

  • PDF

일본의 지역포괄케어시스템 구축과 개호보험제도 개정과정의 정책적 시사점 (Policy Implications of the Long-term Care Insurance System Revitalization Process for Establishing Integrated Care System in Japan)

  • 유애정
    • 한국노년학
    • /
    • 제39권1호
    • /
    • pp.1-20
    • /
    • 2019
  • 최근, 보건복지부가 커뮤니티케어 구축에의 필요성을 강조하면서 보건의료-요양-사회복지계의 뜨거운 관심이 이어지고 있다. 이에 본 연구에서는 향후 노인대상의 커뮤니티모델을 구축함에 있어서 노인장기요양보험이 어떠한 미래적 비전을 갖고 재검토되어야 하는지를 살펴보기 위해 국책사업으로 지역포괄케어시스템(aging in place) 구축을 추진하고 있는 일본의 정책추진사례를 심층적으로 분석해 보는 것은 그 의미가 있다고 볼 수 있으며 본 연구는 일본의 개호보험제도 개정과정을 문헌검토를 통해 심층적으로 분석하였다. 일본의 지역포괄 케어시스템 구축을 위한 개호보험제도 운영현황과 개정과정을 살펴본 결과, 향후 우리의 경우 1)커뮤니티케어시스템 구축의 기본적인 원리를 보다 명확히 할 필요가 있고 2)노인장기요양보험의 재가서비스 확충, 3)거주유형의 다양화 및 고도화 작업 추진, 4)케어매니지먼트체계 구축, 5)당사자와 가족지원 확대 등의 정책추진이 보다 적극적으로 이뤄져야 할 것으로 사료된다.

노후연금보험주택의 운영과 관리 시뮬레이션 사례연구 : 무주군의 전원마을 모델을 중심으로 (A Case Study on the Operation and Management Simulation of Pension Insurance House in Later Life : In the Case of Muju Rural Village)

  • 홍형옥;김정인
    • 가정과삶의질연구
    • /
    • 제27권1호
    • /
    • pp.61-71
    • /
    • 2009
  • The purpose of this study was to resolve the issues of inferior housing environment and the population decrease in rural community by improving the environment and attracting urban inhabitants. A simulation on the costs and the local programs was operated from a point of view that Pension Insurance House with Long-term Lease and a plan for the program in connection with local resources should be accompanied to attract urban inhabitants. The study was carried out through mainly documents analysis and specialists' opinions. The simulation results are as follows. Firstly, the pre-existing rural housing development projects have only emphasized the hardware, while underestimated the post-management with operating programs. The software should be underlined when Pension Insurance House is developed. Secondly, as a result of the simulation on construction expenditure and the operating and maintenance cost for 30 years, about 82.3 million Wons are necessary residential expenses for 15 years per unit. Thirdly, in case of MUJU County, it has made the most of its pre-existing institutions. It's medical institutions provide medical care system with health education, facilities related leisure and culture offer recreational programs and the local community center and its program of each town helps new habitants adopt to the rural life. Additionally, the employment project of a local welfare center allow people living in a rural community to continue their careers with their talents and interests through local class programs for a life worth living. Lastly, guide for getting information of rural life, local community gathering and preliminary education should be carried out to reduce expectant tenants' incompatibility and assist them settle down early. The community program expansion is also required at the local government level.

건설업 산재 은폐의 문제점과 대책에 관한 연구 (A Study on the Problem and Countermeasure of Concealment of Industrial Accident in Construction Site)

  • 최만진;강경식
    • 대한안전경영과학회지
    • /
    • 제10권3호
    • /
    • pp.29-33
    • /
    • 2008
  • According to statistics released by the Ministry of Labor for the past 6 years, work-related accidents in the construction industry have been on the continued increase, resulting in social and economic losses that are difficult to determine at an exact amount. However, the number will likely get much bigger if unreported cases are included, considering the fact that the aforementioned statistics are based soley on the applications filed with Korea Workers' Compensation and Welfare Service. The practice of businesses choosing not to report and dealing with industrial accidents in an unauthorized manner is defined as "concealment of industrial accident". The reason the employers tend to engage in the concealment practice even at their huge cost is a "pre-qualification" scheme for the applicants in the government procurement process. Under the pre-qualification scheme, the applicants with a high rate of industrial accidents receive a low grade and become less attractive candidates in the procurement process, thus losing an opportunity to win a contract. Such failure relates directly to the fate of business organizations, to survive or not. That is why they are making all-out efforts to obtain a high grade in the pre-qualification evaluation. With regard to the accident-concealment problem, the following can be mentioned as preventive measures: (1) To exclude a rate of industrial accidents from the pre-qualification scheme; (2) To strengthen the institution of imposing penalties on the occurrence of industrial accidents; (3) To introduce private insurance system to the current industrial accident compensation insurance; and (4) To give non-recognition treatment to industrial accidents that were not reported upon occurrence. In conclusion, the concealment problem can be resolved if the aforementioned measures are to be taken continuously along with corrective measures against institutional deficiencies.