• 제목/요약/키워드: construction improvement

검색결과 4,138건 처리시간 0.035초

CONSTRUCTION LOST-TIME INJURIES IN LAOS: AN EXPLORATORY STUDY

  • Luu Truong Van;Soo-Yong Kim;Somsana T.K.P
    • International conference on construction engineering and project management
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.229-238
    • /
    • 2007
  • This paper presents a study on construction safety in the People Democratic Republic of Laos (PDRL). Fifty workers experienced certain injuries in their construction sites and 15 top managers were interviewed in twenty-six construction projects in Vientiane, the capital of PDRL. Research results show that stepping on and/or striking against objects (48%), struck by falling objects (24%), falling of persons (12%) are major types of construction injuries. The paper stresses that the ignorance of top managers about their crucial role in safety improvement, using safety incentive to raise safety performance, lack of thorough understanding about benefit from labor safety performance, and the willingness to cut off safety performance expenditures is considered as obstructions of safety improvement programs. The survey indicates that physical working conditions, relationship among workers, foremen behaviors and the monthly wage were influencing factors to worker's job satisfaction. The study also highlights afternoon as dominant time that led to a large number of injuries.

  • PDF

SELECTING OPTIMUM MANAGEMENT PRACTICES IN PRE-CONSTRUCTION PHASE CONSIDERING PROJECT CHARACTERISTICS

  • Hee-Sung Cha;Ki-Hyun Kim;Young-Jin Ko
    • International conference on construction engineering and project management
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.609-613
    • /
    • 2011
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the difficulties of managing construction project in the construction industry. This research classifies and applies the potential improvement made by the construction practitioners. In order to apply influential factors for success on the construction project, the research identifies the relationship between the factors and performance management practices. In addition, in order to predict the results reflecting the project characteristics which are un-improvable by the construction managers in the initial stage of construction, the effect of project characteristics to the identified management practices have been drawn by performance area. Finally, in order to improve the predicted performance, this research provides a framework in setting valid best practices according to the performance areas through a statistical analysis between the best practices and project characteristics through the industry survey.

  • PDF

Analyzing Education/Training Status of Construction Field Engineers and Its Improvement Measures (건설현장 기술인력의 교육·훈련 실태분석 및 개선방안)

  • Lee, Junyong;Shin, Wonsang;Son, Changbaek
    • Korean Journal of Construction Engineering and Management
    • /
    • 제25권5호
    • /
    • pp.55-62
    • /
    • 2024
  • The purpose of this study is to analyze the effectiveness and necessity of improvement for the currently implemented education and training in order to cultivate and secure excellent construction engineers of domestic construction companies, and to suggest future improvement measures. The conclusions obtained through this study are as follows. The overall satisfaction of construction engineers at the construction site was high, and it was found to be effective in improving job skills, but the educational content, educational methods, and educational environment need to be improved. In order to improve the educational content, it is urgent to introduce a practical-oriented educational curriculum to respond to technological development. In order to increase the educational effect of online education methods, it is very important to develop excellent educational content. In order to improve the educational environment, it is necessary to expand customized practice spaces, establish educational facilities by region, and operate shuttle buses.

An Analysis of the On-site Improvement Area of Residential Environment Improvement Project in Daegu (대구시 주거환경개선사업 현지개량지구의 실태에 관한 연구)

  • Km, Han-Su;Kim, Cheol-Su
    • Journal of the Korean housing association
    • /
    • 제22권2호
    • /
    • pp.43-51
    • /
    • 2011
  • This study aims to analyze the on-site improvement area of residential environment improvement project based on research results derived from the on-site and questionnaire survey in case of Daegu. The main findings are as follows. First, residents complain about delay of project completion because a long time has been passed after on-site improvement area was designated. Experts and government officials agree that a new method of development is required. Second, future development should discriminate on-site improvement area according to its level of project completion. The area should be classified into project completion areas and on-going area, and new methods, such as redevelopment, apartment-housing construction method, should be allowed. Third, for better management of on-site improvement area, laws and regulations must be ready and government's will for improvement is crucial.

A Study on Railway Construction System Rationalization - focusing on railway construction in metropolitan area - (철도건설체계의 합리화방안연구 - 대도시지역의 철도건설을 중심으로 -)

  • 이용상
    • Proceedings of the KSR Conference
    • /
    • 한국철도학회 2002년도 추계학술대회 논문집(I)
    • /
    • pp.387-395
    • /
    • 2002
  • As a result of an increase in population of the Metropolitan area and a steady change of circumstances in many parts, the city is sprawling out into the suburbs. This phenomenon causes the necessity of modification of present urban plan. It is risen as a point of issue that construction systems of new railway routes and underground construction, which should be followed the new urban plan in case of inter-regional railway and regional railway. It is hard to find sufficient financial resources, nevertheless the railway improvement definitely affects regional development and improvement of social environment. Also, there is a limit to government subsidies. In this respect, it is necessary to set up a new idea about movement of existing railway routes and improvement of the equipment. This study examines the present problems of railroad construction system in urban downtown area and introduces a suitable institutional way through referring to the instances of other countries.

  • PDF

Proposal of improvement measures according to the limiting factors of the use of drone technology : Cases in the construction field

  • Yoo, Soonduck
    • International Journal of Internet, Broadcasting and Communication
    • /
    • 제13권4호
    • /
    • pp.30-38
    • /
    • 2021
  • This research explored methods for improvements to be made within the field of drone usage within the construction industry based on an investigation of factors which limit their efficiency and productivity. Limiting factors and improvement measures were presented in terms of technology, service, law and policy for employing drones at construction sites. Our first suggestion is, from a technical point of view, that companies need to expand professional manpower and infrastructure for systematic management. Second, in terms of service expansion, it is necessary to have management capabilities for operation such as the use of drones with enhanced safety and reinforced on-site education and personal information management. Third, in terms of legal and institutional support measures, it is necessary to prepare a plan for reforming the legal system for revitalization and to expand the training of professional manpower. This study may contribute not only to the development of drone technology, but also to effectively respond to various problems that appear at construction sites.

A Basic Study for Establishing of Numerical Range Criteria for Classification of Value Improvement Types (VE 가치향상 유형별 수치적 범위기준 설정을 위한 기초연구)

  • Nam, Keong Woo;Jang, Myunghoun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.74-75
    • /
    • 2018
  • VE, rather than just cost reduction tool, have established as a value enhancement tool of the construction industry. Value improvement types of VE proposal can show the effect of VE activities, also acts as an important element in which the owner adopts a proposal and confirms the results of the VE activities. However, problems in the process of quantification for VE proposal and ambiguous standards in classification of value improvement types is need to be supplemented. Accordingly, This study suggests the plan for establishing of numerical range criteria for classification of value improvement types of VE proposal. Implementing this plan will be able to improve the reliability and availability for VE activities.

  • PDF

A Study on the Improving Safety Management by analyzing Safety Consciousness of Construction Labors (건설근로자 안전의식 분석을 통한 안전관리 개선에 관한 연구)

  • Lee, Hyun-Chul;Yeo, Sa-Ku;Go, Seong-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • 제9권3호
    • /
    • pp.51-58
    • /
    • 2009
  • The intention of this study is to analyze safety consciousness of construction labors in Gawang-Ju region. According to Korea Occupational Safety & Health Agency, the rate of disaster in construction industry is very high comparing with other fields. Most of all, the consciousness of construction labors is very important because accidents are caused from it mainly. For this reason, it is necessary to recognize safety consciousness of labors who directly work in construction field. For decreasing the rate of disaster in construction, I examined and analyzed safety consciousness of construction labors and then, groped improvement of safety activity. Finally, this study deducted improvement of safety activities and management.

PERFORMANCE EVALUATION INDEX FOR COMPARING TRADITIONAL CONSTRUCTION METHODS WITH A ROBOT-BASED AUTOMATED CONSTRUCTION METHOD

  • Donguk Oh;Younghoon Lee;Ung-Kyun Lee;Nakju Lett Doh;Hunhee Cho;Kyung-In Kang
    • International conference on construction engineering and project management
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1088-1093
    • /
    • 2009
  • To improve construction productivity and quality, and to make the construction environment safe, a new system, Robot-based Construction Automation (RCA), is currently being developed in Korea. To determine whether RCA is an improvement over traditional construction methods (TCMs), an evaluation method, called the Performance Evaluation Index (PEI), is suggested for RCA. The PEI considers the relationships among the factors influencing the performance of the system obtained using the Delphi method and the analytic hierarchy process (AHP). As the evaluation shows, RCA is much better than TCM except for three factors: the rate of work success, quality improvement by learning experience, and construction duration.

  • PDF

Assessing the Safety Performance of Small-sized Contractors and Improvement Measures (소규모 건설회사의 안전관리 실태 분석 몇 개선방안)

  • Choi, Seung-Mo;Lee, Dong-Eon;Son, Chang-Baek
    • Journal of the Korean Society of Safety
    • /
    • 제23권4호
    • /
    • pp.53-58
    • /
    • 2008
  • This paper presents the findings obtained from the investigation of fatal disasters occurred by small-sized construction firms which have been accepted as to provide lower safety performance other than large-sized construction enterprises and cause more than half of the safety accidents in average. The study identifies the current status of safety performance provided by the small-sized construction contractors in details, find the issues involved with lack of safety performance, and suggest the improvement measures derived from the findings. A survey questionnaire was administered to the construction contractors, which are listed in the database of Construction Association of Korea as to fall into rank between 501st and 1000th in construction capacity. Safety issues such as the performance of safety management system, safety control structure, safety cost relative to safety control, education devoted to safety improvement, usage of safety garments or individual protective tools, and activities to maintain safety performance on site, etc were investigated from the study.