• 제목/요약/키워드: construction detail

검색결과 769건 처리시간 0.027초

MOVEMENT CONTROL OF HIGH-RISE BUILDINGS DURING CONSTRUCTION

  • Taehun Ha;Sungho Lee;Bohwan Oh
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.46-51
    • /
    • 2011
  • High-rise buildings are widely being constructed in the Middle-East, South-East, and East Asia. These buildings are usually willing to stand for the landmark of the region and, therefore, exhibit some extraordinary features such as super-tall height, elevation set-backs, overhangs, or free-form exterior surface, all of which makes the construction difficult, complex, and even unsafe at some construction stages. In addition to the elaborately planned construction sequence, prediction and monitoring of building's movement during construction and after completion are required for precise and safe construction. This is often called the Building Movement Control during construction. This study describes Building Movement Control of the KLCC Tower, a 58-story office building currently being built right next to the famous PETRONAS Twin Towers. The main items of the Building Movement Control for the KLCC Tower are axial shortening and verticality. Preliminary prediction of these items are already carried out by the structural design team but more accurate prediction based on construction stage analysis and combined with time-dependent material testing, field monitoring, and site survey is done by the main contractor. As of September 2010, the Tower is under construction at level 30, where the plan abruptly changes from rectangle to triangle. Findings and troubleshooting until the current construction stage are explained in detail and implementations are suggested for future applications.

  • PDF

건설공사 시 장비운영에 따른 소음특성 기초연구 (A Study on the Noise Characteristics about Equipment Operating under Construction)

  • 김낙영;강희만;김홍종;신용석;김창용
    • 한국지반환경공학회 논문집
    • /
    • 제13권12호
    • /
    • pp.43-49
    • /
    • 2012
  • 건설공사장에서 사용하는 주요 건설장비에 대한 소음측정을 이격거리별로 수행하였다. 특히, 작업형태에 따라 변동하는 폭이 큰 건설장비에 대해서는 작업형태를 세분화하여 소음측정을 수행하였다. 무부하 및 작업이 이루어지는 시간 동안의 옥타브밴드별 'A'보정 등가소음도(Leq)를 측정하였다. 소음측정결과 대부분의 건설장비가 점음원의 특성과 유사하게 나타나고 있는 것으로 분석되었다.

천장마감공사 자동화기술 적용을 위한 작업개선 우선순위 도출 (Priority on Work Improvement for Automation of Ceiling Finishing Work)

  • 이준혁;이동윤;강고운;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.187-188
    • /
    • 2015
  • The construction finishing work is emphasized according to high dependence on labor and long term that occupy approximately 40% in construction period, so that it is required for the alternatives such as automation technology. However, it is insufficient to develop the automation technology of construction finishing work compared to other works, for instance, frame work. Also it is not enough about this preliminary research which survey the improvement needs to select the development object. Therefore, this study aimed at derivation of detail works required improvement in ceiling finishing work by the questionnaire survey. These results may provide the basic information to develop the automation technology of construction finishing work.

  • PDF

한 변의 중점과 다른 두 점이 주어진 삼각형 작도문제의 해결에 대한 연구 (A Study on Solving Triangle Construction Problems Given by a Midpoint of Side and Other Two Points)

  • 한인기;이정순
    • 한국학교수학회논문집
    • /
    • 제12권4호
    • /
    • pp.365-388
    • /
    • 2009
  • 본 연구에서는 세 점이 조건으로 주어진 삼각형의 작도문제들 중에서 해결과정이 삼각형의 외접원 작도와 관련되는 문제들을 해결하고, 이들 작도문제 해결과정을 분석하여, 작도문제들 사이의 연결성을 밝혀 작도문제들을 체계화시켰다. 특히 Davydov의 이론적 지식에서 구체화의 개념을 바탕으로, 작도문제들이 일관된 체계를 형성해가는 과정을 상세하게 기술하였다. 이를 통해 이론적 지식의 구체화의 과정, 작도문제 해결의 교수학적 활용, 교수학적 의의에 대한 폭넓은 논의를 위한 기초자료를 제공할 수 있을 것이며, 학생들의 창의적 수학탐구 활동의 소재로 활용될 수 있을 것으로 기대된다.

  • PDF

Application of Parameters-Free Adaptive Clonal Selection in Optimization of Construction Site Utilization Planning

  • Wang, Xi;Deshpande, Abhijeet S.;Dadi, Gabriel B.
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권2호
    • /
    • pp.1-10
    • /
    • 2017
  • The Clonal Selection Algorithm (CSA) is an algorithm inspired by the human immune system mechanism. In CSA, several parameters needs to be optimized by large amount of sensitivity analysis for the optimal results. They limit the accuracy of the results due to the uncertainty and subjectivity. Adaptive Clonal Selection (ACS), a modified version of CSA, is developed as an algorithm without controls by pre-defined parameters in terms of selection process and mutation strength. In this paper, we discuss the ACS in detail and present its implementation in construction site utilization planning (CSUP). When applied to a developed model published in research literature, it proves that the ACS are capable of searching the optimal layout of temporary facilities on construction site based on the result of objective function, especially when the parameterization process is considered. Although the ACS still needs some improvements, obtaining a promising result when working on a same case study computed by Genetic Algorithm and Electimze algorithm prove its potential in solving more complex construction optimization problems in the future.

이산 사건 시뮬레이션을 활용한 건설공정 CO2 배출량 추정 시스템 (An Estimating System for the CO2 Emissions using Discrete Event Simulation)

  • 이창용;곽한성;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.196-197
    • /
    • 2014
  • Low carbon construction is an important operation management goal such as cost, time, and quality in construction community. This paper introduces a system which measures the variability of carbon dioxide amounts. First, this system allows creating construction operation models of which the level of detail is breakdown into the work task level. Second, the system implements sensitivity analysis along with a ranges of resources that are allocated in an operation model. It facilitates to find the optimal resource combination using the operation performances such as the amount of emissions, operation completion time, and cost. Lastly, it identifies the best fit probability distribution functions of performance criteria given a certain resource combination. It allows project manager to query the percentages to complete the operation within a limitation specified by the system users.

  • PDF

지형 렌더링을 위한 효율적인 자료 구조와 알고리즘 (Efficient Data Structures and Algorithms for Terrain Data Visualization)

  • 정문주;한정현
    • 정보처리학회논문지A
    • /
    • 제9A권4호
    • /
    • pp.581-588
    • /
    • 2002
  • 대화적인 멀티미디어 시스템 구현에 있어, 실시간 가시화/시각화(visualization)는 중요한 기능을 한다. 된 논문은 실시간 지형 렌더링을 위한 효율적인 자료 구조와 알고리즘을 제안한다. 대개의 경우, 지형 데이터는 매우 방대한 크기를 가지고 있어서 있는 데이터를 그대로 실시간 렌더링하는 것은 불가능할 경우가 많다. 따라서 실시간 지형 렌더링에서는 LOD(Levels of Detail) 관리와 뷰 프러스텀 컬링이 핵심 사항이 된다. 본 논문은 계층적이면서도 간결한 지형 자료 구조, 신속한 뷰 프러스텀 컬링, 효율적인 LOD 구축 및 이에 기반한 렌더링 기법을 상세히 기술한다. 실험 결과, 제안된 기법은 일반 PC 사양에서 초당 22 프레임의 렌더링 속도를 보였다.

Design and Implementation of a Blockchain System for Storing BIM Files in a Distributed Network Environment

  • Seo, Jungwon;Ko, Deokyoon;Park, Sooyong;Kim, Seong-jin;Kim, Bum-Soo;Kim, Do Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제26권12호
    • /
    • pp.159-168
    • /
    • 2021
  • BIM (Building Information Modeling) 데이터는 전 세계 표준에 맞춰 설계 도면을 디지털화시킨 데이터이며, BIM 데이터의 안전한 공유 및 거래를 위해서 블록체인을 활용하기 위한 연구들이 진행되고 있다. 하지만, BIM 데이터의 용량 크기와 블록체인의 기술적 한계로 인해 BIM 데이터를 블록체인에 직접적으로 저장할 방법이 없다. 본 논문에서는 해당 문제점을 해결하기 위해 분산 파일 시스템과 블록체인을 융합하여 BIM 데이터를 저장하는 방안에 대해서 제안한다. 본 논문에서는 BIM 데이터 저장을 위해 두 개의 네트워크 오버레이를 구축하는 방안과 BIM 데이터의 효율적인 검증을 위해서 LOD (Level of Detail)기반의 머클 트리를 생성하는 방안을 제안하였다. 제안된 방식을 블록체인 클라이언트인 베수와 IPFS 클라이언트에 동기화 모듈과 함께 적용하여 BIM 데이터가 정상적으로 저장되는 것을 확인하였으며, 제안된 방식을 통해서 파일 용량이 증가할 때도 처리 속도가 안정적으로 증가한다는 것을 확인하였다.

설계된 구조물을 사용한 건설의 필요성 (Necessity of Construction Using Designed Structure)

  • 김덕현;한봉구
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2002년도 가을 학술발표회 논문집
    • /
    • pp.428-434
    • /
    • 2002
  • Almost all buildings/infrastructures made of composite materials are fabricated without proper design. Unlike airplane or automobile parts, prototype test is impossible. One cannot destroy 10 story buildings or 100 meter-long bridges. In order to realize “composites in construction”, the following subjects must be studied in detail, for his design: Concept optimization, Simple method of analysis, Folded plate theory, Size effects in failure, and Critical frequency Unlike the design procedures with conventional materials, his design should include material design, selection of manufacturing method, and quality control methods, in addition to the fabrication method.

  • PDF

EC Development in China

  • Wang, Guangming
    • 통상정보연구
    • /
    • 제6권2호
    • /
    • pp.13-21
    • /
    • 2004
  • The paper describes the up going and frustration of electronic commerce development in China during the past ten years. All the changes are classified as EC application trends and the trends on EC supporting environment construction. Later, some problems affecting EC development are raised, and one of them: social credit system construction is discussed in detail. The trends of EC development discussed in the paper are based on the practices in China, but it is generally analogous in the rest of the world.

  • PDF