• Title/Summary/Keyword: construction detail

Search Result 769, Processing Time 0.03 seconds

Drawing Segmentation Module for Management of Building Finish Details (마감상세도 관리를 위한 도면 블록화 모듈 개발)

  • Koo, Kyo-Jin;Park, Hyung-Jin;Joung, Jin-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.3
    • /
    • pp.329-337
    • /
    • 2015
  • Drawings in construction industry are an aggregation of knowledge containing various information generated in a number of projects. Finish details are generated by architects when they select details and methods of construction by spaces or elements. However it is so difficult to re-use details in existing drawing management systems because there are so many details in a sheet and there are several many kinds of sheets in a file. In this paper, a drawing segmentation algorithm is suggested for managing building finish details individually. Based on this algorithm, a system module for making detail blocks from files of finish details is developed. Using the drawing segmentation module, interfaces of drawing management system are suggested in the paper. Management of individual detail blocks helps to reduce of the time for searching and increases productivity of designed drawings. Also it would contribute to increase quality of designed drawings by reusing of knowledge in detail blocks.

Analysis on the Problems of Construction Temporary Work through Review on Technology System

  • Park, Junmo;Kim, Okkyue;Kim, Jinlee;Lim, NamGi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.716-717
    • /
    • 2015
  • A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.

  • PDF

Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage

  • Choi, Jungsik;Kim, Hansaem;Kim, Inhan
    • Journal of Computational Design and Engineering
    • /
    • v.2 no.1
    • /
    • pp.16-25
    • /
    • 2015
  • Since construction projects are large and complex, it is especially important to provide concurrent construction process to BIM models with construction automation. In particular, the schematic Quantity Take-Off (QTO) estimation on the BIM models is a strategy, which can be used to assist decision making in just minutes, because 70-80% of construction costs are determined by designers' decisions in the early design stage. This paper suggests a QTO process and a QTO prototype system within the building frame of Open BIM to improve the low reliability of estimation in the early design stage. The research consists of the following four steps: (1) analyzing Level of Detail (LOD) at the early design stage to apply to the QTO process and system, (2) BIM modeling for Open BIM based QTO, (3) checking the quality of the BIM model based on the checklist for applying to QTO and improving constructability, and (4) developing and verifying a QTO prototype system. The proposed QTO system is useful for improving the reliability of schematic estimation through decreasing risk factors and shortening time required.

Performance of partial strength connection connected by thick plate between column flanges

  • Tahir, Mahmood M.;Juki, Irwan;Ishak, Mohd Y.;Mohammad, Shahrin;Awang, Abdullah Z.;Plank, Roger
    • Structural Engineering and Mechanics
    • /
    • v.51 no.2
    • /
    • pp.215-228
    • /
    • 2014
  • Traditional beam connections to the minor axis of a column have relatively low strength and stiffness. A modified detail, using a plate welded between the toes of the column flange - referred to as a toe plate connection - is examined in this paper. The results of an experimental investigation for both flush and extended end-plate connections connected to a 25 mm thick end-plate are presented. The tests are complemented by finite element modelling which compares very well with the test observations. The results show a significant increase in both moment resistance and initial stiffness for this connection detail compared with connections made directly to the column web. This offers the prospect of more optimal solutions taking advantage of partial strength frame design for the minor axis as well as major axis.

Determination of structural behavior of Bosporus suspension bridge considering construction stages and different soil conditions

  • Gunaydin, Murat;Adanur, Suleyman;Altunisik, Ahmet Can;Sevim, Baris;Turker, Emel
    • Steel and Composite Structures
    • /
    • v.17 no.4
    • /
    • pp.405-429
    • /
    • 2014
  • In this paper, it is aimed to determine the structural behavior of suspension bridges considering construction stages and different soil conditions. Bosporus Suspension Bridge connecting the Europe and Asia in Istanbul is selected as an example. Finite element model of the bridge is constituted using SAP2000 program considering existing drawings. Geometric nonlinearities are taken into consideration in the analysis using P-Delta large displacement criterion. The time dependent material strength of steel and concrete and geometric variations is included in the analysis. Time dependent material properties are considered as compressive strength, aging, shrinkage and creep for concrete, and relaxation for steel. To emphases the soil condition effect on the structural behavior of suspension bridges, each of hard, medium and soft soils are considered in the analysis. The structural behavior of the bridge at different construction stages and different soil conditions has been examined. Two different finite element analyses with and without construction stages are carried out and results are compared with each other. At the end of the analyses, variation of the displacement and internal forces such as bending moment, axial forces and shear forces for bridge deck and towers are given in detail. Also, displacement and stresses for bridge foundation are given with detail. It can be seen from the analyses that there are some differences between both analyses (with and without construction stages) and the results obtained from the construction stages are bigger. It can be stated that the analysis without construction stages cannot give the reliable solutions. In addition, soil condition have effect on the structural behavior of the bridge. So, it is thought that construction stage analysis using time dependent material properties, geometric nonlinearity and soil conditions effects should be considered in order to obtain more realistic structural behavior of suspension bridges.

Analysis of Environment Emission Characteristics Each Construction Type for Road Field (국도건설공사 도로분야의 공종별 환경부하량 특성분석)

  • Kim, Sang-Ryong;Lee, Dong-Eun;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.1
    • /
    • pp.143-151
    • /
    • 2017
  • Recently Korea has presented carbon emission reduce goal of 37% compare to BAU until 2030 according to Paris Agreement in order to correspond to climate change. For this, researchers need to study positively on construction industry that emit $CO_2$ of $3^{rd}$ volume of 28 industry classification. This study calculated environmental load by LCA using the road part except tunnel and bridge among national road cases completed already. After selecting representative type of large construction type based on environmental emission, earth works, drainage works and paving works took up 84%. And this study analyzed the environmental emission feature of each detail construction type after selecting representative type each detail construction type. Utilization of each construction type emission attribute to environmental load during national road construction, will be helpful in making decision of eco-friendly national road construction based on environmental emission.

A Development of Interface Module between Structural Design and Detail Design based on BIM (BIM 기반의 구조설계와 상세설계의 인터페이스 모듈 개발)

  • Eom, Jin-Up;Shin, Tae-Song
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.1
    • /
    • pp.113-124
    • /
    • 2011
  • This study concerned the interoperability between the structural-analysis model and the default detail model in steel structures available for the structural-design process based on BIM. The purpose of the study was to develop an interface module that can perform data conversion between the analysis and design applications and the BIM applications, through the dotnet frame work development environment using OpenAPI provided by the BIM application vendor. The direct-link method was applied for BIM interoperability. A basic-frame model for detail design and modeling was created from the structural-analysis model to verify if the application was developed. Finally, the proposed process was compared with the existing process to verify the efficiency of the former.

Fatigue Capacity Evaluation of the Girder-Abutment Connection for the Steel-Concrete Composite Rigid-Frame Bridge Integrated with PS Bar (PS 강봉으로 일체화된 강합성 라멘교의 거더-교대 접합부에 대한 피로 성능 평가)

  • Ahn, Young-Soo;Oh, Min-Ho;Chung, Jee-Seung;Lee, Sang-Yoon
    • Journal of the Korea Concrete Institute
    • /
    • v.24 no.3
    • /
    • pp.249-258
    • /
    • 2012
  • Integral and rigid frame bridges have advantages in bridge maintenance and structural efficiency by eliminating expansion joints and bridge supports. However, the detail of typical girder-abutment connection is rather complex and increases construction cost depending on construction detail. For the purpose of compensating disadvantages such as complexity and additional cost, a new type of bridge is proposed in this study, which improves the efficiency of construction by simplifying the construction detail of girder-abutment connection. The proposed bridge has the connection detail of steel girder and abutment integrated by prestressed PS bar installed in the connection. In this study, finite element analysis and fatigue load test are conducted to evaluate the fatigue capacity of the proposed girder-abutment connection. The results of the finite element analysis revealed that the possibility of the fatigue damage in the girder-abutment connection is very low. The results of the fatigue load test verified that the integrity of the girder and abutment connection is maintained after 2,000,000 cycles of fatigue loading.

The Audit Method for Efficient Hospital Information System Construction (효율적인 병원 정보시스템 구축을 위한 감리 모형)

  • Moon, Byung-Chul;Kim, Dong-Soo;Kim, Hee-Wan
    • Journal of Information Technology Services
    • /
    • v.11 no.2
    • /
    • pp.197-211
    • /
    • 2012
  • This paper describes how to derive audit criterion, audit domain, detail technology, and functional check items which are core of hospital information system, consisting of OCS, EMR, and PACS. Using the check items listed above, we investigated the objective validity for the construction audit of hospital information system. As a result, the derived audit criterion, audit domain, detail technology, and functional check items were verified as check items for audit. Since using the current audit check items of public area is insufficient to construct efficient, reliable, and stable hospital information system, we suggest adopting the hospital information system audit area, audit check items, and process that are presented in this paper.

Experimental Study on Flexural Behavior of PC Beam Column Joint with Spliced Strand (강선 이음길이에 따른 PC 보-기둥 접합부의 휨 거동에 관한 실험적 연구)

  • 하상수;김승훈;문정호;이리형;이강철;김익배
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.11a
    • /
    • pp.207-210
    • /
    • 2003
  • As reviewing of current trend on PC connection details, owing to effective stress transfer in the connection, it grow to increase that use of mechanical splices, reinforcements or welded splices, and prestressing. However such devices as reinforcement, mechanical splices entail not only more cost resulted from materials but also extra construction process so as to cause PC used method to lower competition against conventional method. Therefore more enhanced connection details which help working process simplified and construction cost reduced. In this research, as replace 9.3mm 7strand for reinforcement, it is attempt to devise connection detail which makes workability improve and confirm effective stress transfer in the region of connection. The experimental research is proceeded by partial tension test of specimen. The splice lengths of 7strand is decided to be variations. The flexural capability is verified to depend on spice length. An an appropriate splice length could be also determined as a precedent research on improving PC connection detail.

  • PDF