• 제목/요약/키워드: construction design

검색결과 11,632건 처리시간 0.04초

영구벽체로 사용하는 지하연속벽 수직시공이음부의 설계방법 (Design Considerations and Method for Vertical Construction Joints of Slurry Walls Used as Permanent Basement Walls)

  • 이정영;김승원;김두기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.395-396
    • /
    • 2023
  • The current building structural standards present design requirements for the vertical construction joint of a slurry wall when it is used as a permanent wall. This paper proposes design methods and considerations according to the requirements of the relevant standards.

  • PDF

공동주택 시공VE 사례분석을 통한 설계VE 효율화방안 (The Efficiency Scheme of Design VE through the Case Studies of Construction VE for Apartments)

  • 김용수;김영훈
    • 한국건설관리학회논문집
    • /
    • 제11권4호
    • /
    • pp.59-67
    • /
    • 2010
  • 본 연구는 공동주택 시공VE 사례조사를 통한 설계VE의 문제점을 분석하여 이를 바탕으로 설계VE의 효율화방안을 제시하는 것을 목적으로 수행되었다. 이를 위해 국내 5개 건설사의 공동주택 시공VE 현황을 조사하였다. 또한 5개 건설사에서 수행한 공동주택 프로젝트를 대상으로 시공VE 적용 현황을 분석하였다. 이와 같은 목적과 방법에 따른 연구 결과를 요약하면 다음과 같다. 첫째, 설계VE의 효율성 제고를 위해 시공VE 데이터베이스 구축 및 활용에 필요한 정보판리 제계를 제시하였다. 둘째, 시공VE 업무체계 개선을 통한 설계VE 수행 프로세스 개선안을 제시하였다. 셋째, 공통주택의 효율적인 설계VE 대상 선정을 위한 고려사항과 설계단계별 중점 VE대상을 제시하였다.

설계의 안전성 검토(DFS) 업무의 효율성 증대를 위한 공동주택 건설공사의 단위작업별 재해위험성 평가 (Disaster Risk Assessment by Work Unit of Construction Work for Improve the Efficiency of Design for Safety Task)

  • 김진원;김재준
    • 대한건축학회논문집:구조계
    • /
    • 제34권6호
    • /
    • pp.45-53
    • /
    • 2018
  • The construction work to establish a safety management plan should be carried out Design for Safety(DFS) task by the designers from May 2016 according to the amendment of the Construction Technology Promotion Act. However, designers lack experience in construction work and lack of information on safety accidents, so it is not easy to predict a disaster that may occur during the construction phase. Therefore, the purpose of this study is to provide information about disasters that can occur in each construction work in order to enable designers to efficiently perform DFS task in the design phase. In this study, the construction work was classified by work unit and the disaster risk assessment was conducted using the Failure Mode and Effect Analysis technique. The disaster information by work unit analyzed in this study can be used to provide designers with an alternative to prevent disasters at the design stage. Disaster information by work unit of apartment construction can be used by designers to prepare an alternative for disaster prevention at the design stage.

Modification of Public-Private Partnership in Japan

  • Kaneta, Takashi
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.153-158
    • /
    • 2017
  • Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.

  • PDF

고정밀 측량장비(3D 레이저 스캐너, 3D 포토 스캐너, 드론)를 활용한 건축 시공단계의 엔지니어링 적용사례 (Engineering Construction With High-Precision Survey Equipment (3D laser scanner, 3D photo scanner, drone))

  • 정광량;이병도;김태혁
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.133-134
    • /
    • 2019
  • As information and construction technology increases, the demand for sophisticated geometric design grows. Design of buildings is becoming more larger, higher, and complicated every day, requiring much new construction technology to bring the design into reality. Nonetheless, the speed of construction technology development is not as rapid. This study concerns the difficulties of realization of sophisticated geometric design. It aims to suggest using BIM and precision survey equipment during the construction stage of the project is a way to resolve. The study will list how to use BIM as an engineering platform incorporating a photo scanner, a scanner drone, and a 3D scanner in the construction stage of projects, how these progressive projects were able to benefit from the high-construction technology.

  • PDF

QUANTITATIVE ANALYSIS ON PROJECT PERFORMANCE ANALYSIS AND DELIVERY METHODS

  • Seta Ohanesian;Jin-Lee Kim;Tang-Hung Nguyen;Ok-Kyue Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.332-337
    • /
    • 2013
  • Various project delivery methods have been utilized by owners over the years to maximize project performance. The design-build delivery method is being increasingly used due to the advantages it can offer to an engineering construction industry. Numerous studies have advocated the use of design/build over the traditional design/bid/build delivery approach. This study represents comprehensive analysis of 40 projects from the construction industry and shows that design/build method may not provide all the benefits to project performance. This study found timesaving was a definitive advantage of design/build project delivery, but the positive effects of cost changes was not convincing. Based on the results of the study, the project management expertise and experience of the contractor may have a greater impact on project performance outcomes than focusing on project delivery strategy only.

  • PDF

건축협력설계 의사결정 지원시스템 구축방안 (Constitutional Directions of Decision Support System for Cooperative Design in Architectural Design Phase)

  • 전재열;오승준
    • 한국건설관리학회논문집
    • /
    • 제4권2호
    • /
    • pp.91-98
    • /
    • 2003
  • 국내 건축설계 프로젝트에서는 협력업체간의 커뮤니케이션이 원활치 못하여 건축 부위 설계 시 성능 및 비용을 만족하는 적절한 설계대안 생성이 어려울 뿐 아니라, 설계단계에서부터 시공단견1에 이르기까지 다양한 원인으로 발생되는 설계변경에 적절히 대응하지 못하고 있다. 따라서 분야별 설계도서의 불일치로 인한 시공 품질 저하 등의 문제가 발생되고 있다. 이에 따라 본 연구에서는 건축설계단계에서 합리적인 건축설계대안 생성을 위한 협력설계 의사결정 지원시스템 구축방법의 개념을 제시하였다.

국내 설계시공일괄입찰방식 개선방안 (Improvement of the Design-Build Bidding in the Domestic Construction Industry)

  • 김수현;전민정;구교진;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.410-413
    • /
    • 2003
  • 건설시장에서 경쟁력을 강화하고 국제정책에 대응하기 위하여 설계업체와 시공업체의 협력을 장려하는 설계시공 일관입찰방식이 대두되었다. 설계시공일괄입찰방식은 공기단축, 사업비 절약, 품질 향상을 위한 전도 유망한 입찰방식이지만 국내 건설산업에서는 제도의 미비, 관계자들의 경험 및 인식부족 등으로 이러한 장점을 살리지 못하고 있다. 이에 따라 본 연구에서는 국내 공공공사 설계시공일괄입찰방식에서의 문제점을 사업비, 품질, 사업기간의 측면에서 분석하여 개선방안을 제안하고자 한다.

  • PDF

원자력 발전설비의 3D 모델 상세화 방안에 대한 기초 연구 (A basic study 3D model advancement method for nuclear power plant)

  • 임병기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.37-38
    • /
    • 2018
  • BIM(Building Information Modeling) in the architecture, VDC(Virtual Design and Construction) defined CIFE(Center for Integrated Facility Engineering) of Stanford university in USA, and Data-driven design definition issued by TECDOC-1284 of IAEA are doing data-level design generated by 3D CAD technology, integrating and managing related information based on the 3D model, and Using 3D models effectively during nuclear power plant life cycle. 3D model of domestic nuclear power industry is using interference review between design fields, 4D system linked 3D construction model and schedule activity, but the 3D model generated in the design phase is effectively not utilized during the construction, operation, decommissioning. therefore, This study is aimed to suggest 3D model LOD(Level of Detail) advancement method through the analysis of existing literature, 2D drawings, and 3D models throughout nuclear power plant lifecycle.

  • PDF

Comparison of Database Models for Developing a Pavement Performance Analysis System

  • Choi Jae-ho
    • 한국건설관리학회논문집
    • /
    • 제5권4호
    • /
    • pp.79-86
    • /
    • 2004
  • One of the most difficult tasks in pavement management information systems is establishing the links between performance measures of a structure and the design and construction inputs. In-situ pavement performance can be considered a response variable to many project input variables, such as design, construction, and traffic loading effects. If we are to fully understand the component of pavement performance and specify the inputs through design and construction specifications to achieve that performance we must develop quantitative relationship between input and response variables through a scientific, fully integrated Pavement Performance Analysis System (PPAS). Hence, the objective of this study is to design a database model required for developing an effective database template that will allow analysis of pavement performance measures based on design and construction information linked by location. In order to select the most appropriate database model, a conceptual database model (Entity Relationship Model) and dimensional model, which is believed to be the most effective modeling technique for data warehouse project, are designed and compared. It is believed that other state highway agencies could adopt the proposed design strategy for implementing a PPAS at the discretion of the state highway agencies.